MERENCANA KONSTRUKSI BETON

PERHITUNGAN PONDASI TIANG PANCANG PADA TANGGA

1. Perhitungan kapasitas dukung tanah Menurut Meyerhof (1956)


a. Data Perencanaan :
 Lebar pondasi arah x (Bx) = 1,50 m
 Lebar pondasi arah y (By) = 5,50 m
 Tebal pondasi (h) = 0,50 m
 Lebar arah kolom x (bx) = 0,50 m
 Lebar arah kolom y (by) = 0,50 m
 Beban axial terfaktor (Pu) = 105520,10 kg
 Momen terfaktor arah x (Mx) = 308.79 kg-m
 Momen terfaktor arah y (My) = 15280,43 kg-m
 Beban axial pada tangga = kg

b. Kapasitas Dukung tanah Menurut Meyerhof (1956)


qc
qa =
B + 0,3 2
33 ∗ (( B ) ) ∗ Kd

Df
Kd = 1 + 0,33 ∗ < 1,33
B
Keterangan :
qc = Harga conus rata-rata hasil sondir dari dasar pondasi (kg/cm2)
B = Lebar Pondasi arah memanjang (m)
Df = Kedalaman Pondasi (m)
1,5
Kd = 1 + 0,33 ∗
5,5
Kd = 1,09

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

 Harga qc

Kedalaman Local
Conus CN+CL HP JHP Friction FR
(m)
0
0.2 25 30 10 10 0.50 2.0
0.4 25 30 10 20 0.50 2.0
0.6 30 35 10 30 0.50 1.7
0.8 40 51 22 52 1.10 2.8
1 50 65 30 82 1.50 3.0
1.2 45 65 40 122 2.00 4.5
1.4 80 110 60 182 3.00 3.8
1.6 80 110 60 242 3.00 3.8

0 + 25 + 25 + 30 + 40 + 50 + 45 + 80 + 80
qc =
9
qc = 41,67 kg/cm2
41,67
qa =
5,8 + 0,3 2
33 ∗ (( ) ) ∗ 1,085
5,8

qa = 1,052 kg/cm2
Pembebanan Pondasi
Berat Pondasi = tebal pondasi * tegangan ijin beton
= 0,50 m * 2400 kg/m3
= 1200 kg/m2
Berat tanah = tebal tanah diatas pondasi * BJ tanah
= 1,00 m * 1800 kg/m3
= 1800 kg/m2

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

Kontrol Terhadap Tegangan Ijin Tanah

𝑃 𝑀 𝑃𝑡𝑜𝑡 𝑀𝑢
σ∘ = ± = ± + 𝑞 ≤ 𝜎 𝑡𝑎𝑛𝑎ℎ
𝐴 𝑊 𝐵𝑥𝐿 1
6 𝑥 𝐵 𝑥 𝐿²
 𝐿𝑢𝑎𝑠 𝑝𝑒𝑛𝑎𝑚𝑝𝑎𝑛𝑔 𝑝𝑜𝑛𝑑𝑎𝑠𝑖 ( 𝐴)

𝐴 = 𝐵𝑋 ∗ 𝐵𝑌 = 1,50 ∗ 5,50 = 8.25 𝑚2

 𝑇𝑎ℎ𝑎𝑛𝑎𝑛 𝑚𝑜𝑚𝑒𝑛 𝑎𝑟𝑎ℎ 𝑥 ( 𝑊𝑥)


1 1
𝑊𝑥 = ∗ 𝐵𝑌 ∗ 𝐵𝑥 ² = ∗ 5,50 ∗ 1,50² = 2,06 𝑚3
6 6
 𝑇𝑎ℎ𝑎𝑛𝑎𝑛 𝑚𝑜𝑚𝑒𝑛 𝑎𝑟𝑎ℎ 𝑥 ( 𝑊𝑦)
1 1
𝑊𝑦 = ∗ 𝐵𝑥 ∗ 𝐵𝑦 ² = ∗ 1,50 ∗ 5,50² = 7,56 𝑚3
6 6
 𝑡𝑖𝑛𝑔𝑔𝑖 𝑡𝑎𝑛𝑎ℎ 𝑑𝑖𝑎𝑡𝑎𝑠 𝑝𝑖𝑙𝑒 𝑐𝑎𝑝 = 𝐷𝑓 − ℎ = 1,50 − 0,50 = 1,00 𝑚

 𝑡𝑒𝑘𝑎𝑛𝑎𝑛 𝑎𝑘𝑖𝑏𝑎𝑡 𝑏𝑒𝑟𝑎𝑡 𝑝𝑖𝑙𝑒 𝑐𝑎𝑝 𝑑𝑎𝑛 𝑡𝑎𝑛𝑎ℎ


q = Berat Pondasi + Berat tanah
= 1200 kg/m2 + 1800 kg/m2
= 3000 kg/m2

𝒕𝒆𝒈𝒂𝒏𝒈𝒂𝒏 𝒕𝒂𝒏𝒂𝒉 𝒎𝒂𝒙𝒊𝒎𝒖𝒎 𝒚𝒂𝒏𝒈 𝒕𝒆𝒓𝒋𝒂𝒅𝒊 𝒑𝒂𝒅𝒂 𝒑𝒐𝒏𝒅𝒂𝒔𝒊


𝑃 𝑀𝑥 𝑀𝑦
σ𝑚𝑎𝑥 = + + + 𝑞 < 𝑞𝑎
𝐴 𝑊𝑥 𝑊𝑦

(107197,88 + 87433,2) (69,03 + 1253,6)


= +
10,44 3,132
(15280,43 + 2035,3)
+ + 3000 < 10520 kg/m2
10,092

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

= 23780,91 kg/m2 > 10520 kg/m2  maka sisa kapasitas daya


dukung tanah dilimpahkan pada tiang pancang

𝒕𝒆𝒈𝒂𝒏𝒈𝒂𝒏 𝒕𝒂𝒏𝒂𝒉 𝒎𝒊𝒏𝒊𝒎𝒖𝒎 𝒚𝒂𝒏𝒈 𝒕𝒆𝒓𝒋𝒂𝒅𝒊 𝒑𝒂𝒅𝒂 𝒑𝒐𝒏𝒅𝒂𝒔𝒊


𝑃 𝑀𝑥 𝑀𝑦
σ𝑚𝑖𝑛 = − − +𝑞
𝐴 𝑊𝑥 𝑊𝑦

(107197,88 + 87433,2) (69,03 + 1253,6)


= −
10,44 3,132
(15280,43 + 2035,3)
− + 3000 < 10520 kg/m2
10,092
= 19504,74 kg/m2 > 10520 kg/m2

qa = 1,052 kg/cm2
P footplat = qa * Bx * By
= 1,052 * 180 * 580 = 109828,8 kg
Pu total = Puk1 + Puk2 + Putangga
= 107197,88 + 87433,2 + 34172,65 = 228803,78 kg
Pu aktual = Pu total - Pfootplat
= 228803,78 − 109828,8 = 107919,33 kg
Rekapitulasi daya dukung tiang tunggal :
No Uraian Daya Dukung Tiang Tunggal Ptiang

1. Daya dukung tiang pancang berdasarkan brosur 103,226 ton

2. Daya dukung tiang pancang berdasarkan hasil sondir 28,700 ton

3. Daya dukung tiang pancang berdasarkan hasil Uji SPT 38,154 ton

107919,33
Jumlah tiang pancang yang dibutuhkan = = = 3,76 ~ 8 buah
28700

A. PERHITUNGAN EFISIENSI TIANG GROUP As A2-B2 (Joint 4-


340)
1. Effiensi Tiang Pancang Group
m = Jumlah tiang dalam satu baris
n = Jumlah tiang dalam arah lain

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

D = Diameter tiang (30 cm)


S = Jarak terjauh antar tiang (90 cm)
θ = arc tan (D/S) = arc tan (30/90) = 18,43˚

(𝑛 − 1) ∗ 𝑚 + (𝑚 − 1) ∗ 𝑛
 = 1− [ ]∗ 𝜃
90 ∗ 𝑛 ∗ 𝑚
(2 − 1) ∗ 4 + (4 − 1) ∗ 2
 = 1− [ ] ∗ 18,43
90 ∗ 2 ∗ 4
= 0,744
𝑃𝑛 𝑔𝑟𝑜𝑢𝑝 = Eff * 𝑃𝑛
= 0,744 * 28,700 ton
= 21,353 ton ≈ 21353 kg
Pu total = Pu sap + P poer + P tanah
= 107197,88 + (5,8*1,8*0,5*2400) + (5,8*1,8*1,0*1800)
= 138517,88 kg

𝑃𝑢 − 𝑃 𝑓𝑜𝑜𝑡𝑝𝑙𝑎𝑡𝑒 𝑀𝑥 ∗ 𝑦𝑚𝑎𝑥 𝑀𝑦 ∗ 𝑥𝑚𝑎𝑥


P𝑚𝑎𝑥 = + + ≤ P𝑛 𝑔𝑟𝑜𝑢𝑝
𝑛 𝑛𝑥 ∗ ∑ 𝑥 2 𝑛𝑦 ∗ ∑ 𝑦 2
138517,88 −109828,8 69,03 ∗ 0,9
= +
4 2 ∗(0,452 + 0,452 + 0,452 +0,452 )

15280 ∗ 0,9
+ ≤ 21353 kg
2∗(1,552 + 2,002 + 2,452 + 2,902 )

= 7540,96 kg ≤ 21353 kg

Tinjauan AS 313

 Beban axial terfaktor (Pu) = 105970 kg

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

 Momen terfaktor arah x (Mx) = 85,1 kg-m


 Momen terfaktor arah y (My) = 16080 kg-m
 Beban axial pada tangga = 27907,53 kg

Pu total = Pu sap + P poer + P tanah


= 87433,2 + (5,8*1,8*0,5*2400) + (5,8*1,8*1,0*1800)
= 118753,2 kg
𝑃𝑢 − 𝑃 𝑓𝑜𝑜𝑡𝑝𝑙𝑎𝑡𝑒 𝑀𝑥 ∗ 𝑦𝑚𝑎𝑥 𝑀𝑦 ∗ 𝑥𝑚𝑎𝑥
P𝑚𝑎𝑥 = + + ≤ P𝑛 𝑔𝑟𝑜𝑢𝑝
𝑛 𝑛𝑥 ∗ ∑ 𝑥 2 𝑛𝑦 ∗ ∑ 𝑦 2
118753,2 −109828,8 85,1 ∗ 0,9
= +
4 2 ∗(0,452 + 0,452 + 0,452 +0,452 )

16080 ∗ 0,9
+ ≤ 21353 kg
2∗(1,552 + 2,002 + 2,452 + 2,902 )

= 2626,01 kg ≤ 21353 kg

PERHITUNGAN GESER PONDASI

 Arah Melintang

𝐵𝑝𝑖𝑙𝑒𝑐𝑎𝑝 − 𝐿𝑘𝑜𝑙𝑜𝑚 1800 − (450)


𝑐 = = = 675 𝑚𝑚
2 2

𝑐 = 675 𝑚𝑚

𝑊1 = 𝑐 ∗ 𝐵𝑝𝑖𝑙𝑒𝑐𝑎𝑝 ∗ ℎ𝑝𝑖𝑙𝑒𝑐𝑎𝑝 ∗ 𝐵𝐽 𝐵𝑒𝑡𝑜𝑛 = 0,45 ∗ 1,80 ∗ 0,5 ∗ 2400 = 972 𝐾𝑔

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

𝑊2 = 𝑐 ∗ 𝐵𝑝𝑖𝑙𝑒𝑐𝑎𝑝 ∗ ℎ𝑡𝑎𝑛𝑎ℎ ∗ 𝐵𝐽 𝑇𝑎𝑛𝑎ℎ = 0,45 ∗ 1,80 ∗ 1 ∗ 1800 = 1458𝐾𝑔

𝑉𝑢𝑥 = 𝑛𝑥 ∗ 𝑃𝑚𝑎𝑥 − 𝑊1 − 𝑊2

= ((2 ∗ 7540,96) + (2 ∗ 2626,01) − 972 − 1458)

= 17903,94 𝐾𝑔

𝑑 = ℎ𝑝𝑖𝑙𝑒𝑐𝑎𝑝 − 𝑆𝑒𝑙𝑖𝑚𝑢𝑡 𝑏𝑒𝑡𝑜𝑛 − Ø𝑇𝑢𝑙 − 0,5 ∗ Ø𝑇𝑢𝑙

𝑑 = 450 − 60 − 19 − 0,5 ∗ 19 = 361,5 𝑚𝑚

𝑑 ′ = ℎ𝑝𝑖𝑙𝑒𝑐𝑎𝑝 − 𝑑 = 450 − 361,5 = 88,5 𝑚𝑚

𝑏𝑘𝑜𝑙𝑜𝑚 450
𝛽𝑐 = = =1
ℎ𝑘𝑜𝑙𝑜𝑚 450

𝛼𝑠 = 40 (𝑲𝒐𝒍𝒐𝒎 𝑫𝒂𝒍𝒂𝒎)

Untuk Tinjauan arah Melintang maka B = 1350 mm

2 𝐵∗𝑑 2 1800 ∗ 361,5


𝑉𝑐1 = (1 + ) ∗ √𝑓𝑐 ′ ∗ = (1 + ) ∗ √32 ∗
𝛽𝑐 6 1 6

= 1840457,53 𝑁

𝛼𝑠 ∗ 𝑑 𝐵∗𝑑
𝑉𝑐2 = ( + 2) ∗ √𝑓𝑐′ ∗
𝐵 12

40 ∗ 361,5 1800 ∗ 361,5


𝑉𝑐2 = ( + 2) ∗ √32 ∗ = 3077653,98 𝑁
1800 12

1 1
𝑉𝑐3 = ∗ √𝑓𝑐 ′ ∗ 𝐵 ∗ 𝑑 = ∗ √32 ∗ 1800 ∗ 361,5 = 1226971,69 𝑁
3 3

𝑉𝑐 𝑡𝑒𝑟𝑘𝑒𝑐𝑖𝑙 𝑑𝑖𝑔𝑢𝑛𝑎𝑘𝑎𝑛 𝑠𝑒𝑏𝑎𝑔𝑎𝑖 𝑎𝑐𝑢𝑎𝑛 "𝑽𝒄𝟑 = 𝟏𝟐𝟐𝟔𝟗𝟕𝟏, 𝟔𝟗 𝑵

≈ 𝟏𝟐𝟐𝟔𝟗𝟕, 𝟏𝟕 𝑲𝒈"

# Kontrol Kuat Geser Maksimum

𝜙𝑉𝑐 = 0,75 ∗ 122697,17 = 92022,88 𝐾𝑔

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

𝜙𝑉𝑐 = 92022,88 𝐾𝑔 > 𝑉𝑢𝑥 17903,94 𝐾𝑔 (𝑶𝑲, 𝑨𝒎𝒂𝒏)

 Arah Memanjang

𝐵𝑝𝑖𝑙𝑒𝑐𝑎𝑝 − 𝐿𝑘𝑜𝑙𝑜𝑚 1800 − (450)


𝑐 = = = 675 𝑚𝑚
2 2

𝑐 = 675 𝑚𝑚

𝑊1 = 𝑐 ∗ 𝐵𝑝𝑖𝑙𝑒𝑐𝑎𝑝 ∗ ℎ𝑝𝑖𝑙𝑒𝑐𝑎𝑝 ∗ 𝐵𝐽 𝐵𝑒𝑡𝑜𝑛 = 0,45 ∗ 5,80 ∗ 0,5 ∗ 2400 = 3132 𝐾𝑔

𝑊2 = 𝑐 ∗ 𝐵𝑝𝑖𝑙𝑒𝑐𝑎𝑝 ∗ ℎ𝑡𝑎𝑛𝑎ℎ ∗ 𝐵𝐽 𝑇𝑎𝑛𝑎ℎ = 0,45 ∗ 5,80 ∗ 1 ∗ 1800 = 2349 𝐾𝑔

𝑉𝑢𝑦 = 𝑛𝑦 ∗ 𝑃𝑚𝑎𝑥 − 𝑊1 − 𝑊2

= ((2 ∗ 7540,96) + (2 ∗ 2626,01) − 3132 − 2349)

= 14852,94 𝐾𝑔

𝑑 = ℎ𝑝𝑖𝑙𝑒𝑐𝑎𝑝 − 𝑆𝑒𝑙𝑖𝑚𝑢𝑡 𝑏𝑒𝑡𝑜𝑛 − Ø𝑇𝑢𝑙 − 0,5 ∗ Ø𝑇𝑢𝑙

𝑑 = 450 − 60 − 19 − 0,5 ∗ 19 = 361,5 𝑚𝑚

𝑑 ′ = ℎ𝑝𝑖𝑙𝑒𝑐𝑎𝑝 − 𝑑 = 450 − 361,5 = 88,5 𝑚𝑚

𝑏𝑘𝑜𝑙𝑜𝑚 450
𝛽𝑐 = = =1
ℎ𝑘𝑜𝑙𝑜𝑚 450

𝛼𝑠 = 40 (𝑲𝒐𝒍𝒐𝒎 𝑫𝒂𝒍𝒂𝒎)

Untuk Tinjauan arah Memanjang maka B = 5350 mm

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

2 𝐵∗𝑑 2 5800 ∗ 361,5


𝑉𝑐1 = (1 + ) ∗ √𝑓𝑐 ′ ∗ = (1 + ) ∗ √32 ∗
𝛽𝑐 6 1 6

= 5930363,15 𝑁

𝛼𝑠 ∗ 𝑑 𝐵∗𝑑
𝑉𝑐2 = ( + 2) ∗ √𝑓𝑐′ ∗
𝐵 12

40 ∗ 361,5 5800 ∗ 361,5


𝑉𝑐2 = ( + 2) ∗ √32 ∗ = 4440955,86 𝑁
5800 12

1 1
𝑉𝑐3 = ∗ √𝑓𝑐 ′ ∗ 𝐵 ∗ 𝑑 = ∗ √32 ∗ 5800 ∗ 361,5 = 3953575,46 𝑁
3 3

𝑉𝑐 𝑡𝑒𝑟𝑘𝑒𝑐𝑖𝑙 𝑑𝑖𝑔𝑢𝑛𝑎𝑘𝑎𝑛 𝑠𝑒𝑏𝑎𝑔𝑎𝑖 𝑎𝑐𝑢𝑎𝑛 "𝑽𝒄𝟑 = 𝟑𝟗𝟓𝟑𝟓𝟕𝟓, 𝟒𝟔 𝑵

≈ 𝟑𝟗𝟓𝟑𝟓𝟕, 𝟓𝟓 𝑲𝒈"

# Kontrol Kuat Geser Maksimum

𝜙𝑉𝑐 = 0,75 ∗ 395357,55 = 296518,16 𝐾𝑔


𝜙𝑉𝑐 = 296518,16 𝐾𝑔 > 𝑉𝑢𝑦 = 17903,94 𝐾𝑔 (𝑶𝑲, 𝑨𝒎𝒂𝒏)

Geser dua arah (Geser Pons)

𝐵𝑥 = 𝑏𝑘𝑜𝑙𝑜𝑚 + 𝑑 = 450 + 361,5 = 811,5 𝑚𝑚 ≈ 81,15 𝑐𝑚

𝐵𝑦 = 𝑏𝑘𝑜𝑙𝑜𝑚 + 𝑑 = 450 + 361,5 = 811,5 𝑚𝑚 ≈ 81,15 𝑐𝑚

𝐴𝑝 = 2 ∗ (𝐵𝑥 + 𝐵𝑦) ∗ 𝑑 = 2 ∗ (81,15 + 81,15) ∗ 36,15 = 11734,29 𝑐𝑚2

𝐵𝑝 = 2 ∗ (𝐵𝑥 + 𝐵𝑦) = 2 ∗ (81,15 + 81,15) = 324,6 𝑐𝑚 ≈ 3246 𝑚𝑚

2
(1 + ) ∗ √𝑓𝑐′ (1 + 2) ∗ √32
𝛽𝑐 1
𝑓𝑝1 = = = 2,83 𝑀𝑝𝑎
6 6

𝛼𝑠 ∗ 𝑑 40 ∗ 36,15
( 𝐵𝑝 + 2) ∗ √𝑓𝑐′ (
324,6 + 2) ∗ √32
𝑓𝑝2 = = = 3,04 𝑀𝑝𝑎
12 12

√𝑓𝑐′ √32
𝑓𝑝3 = = = 1,89 𝑀𝑝𝑎
3 3

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

𝑓𝑝 𝑡𝑒𝑟𝑘𝑒𝑐𝑖𝑙 𝑑𝑖𝑔𝑢𝑛𝑎𝑘𝑎𝑛 𝑠𝑒𝑏𝑎𝑔𝑎𝑖 𝑎𝑐𝑢𝑎𝑛 "𝒇𝒑𝟑 = 𝟏, 𝟖𝟗 𝑴𝒑𝒂"

𝑉𝑛𝑝 = 2 ∗ 𝐴𝑝 ∗ 𝑓𝑝 = 2 ∗ (11734,29,∗ 100) ∗ 1,89 = 4435561,62 𝑁 ≈ 443556,16 𝐾𝑔

# Kontrol Kuat Geser Maksimum

𝜙𝑉𝑛𝑝 = 0,75 ∗ 443556,16 = 332667,12 𝐾𝑔

𝜙𝑉𝑛𝑝 = 332667,12 𝐾𝑔 > 𝑃𝑢 = 154195,35 𝐾𝑔 (𝑨𝑴𝑨𝑵)

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

PERHITUNGAN PENULANGAN PILE CAP

Penulangan Pilecap Arah Melintang “L= 1800 mm”


Pu total terbesar = Pu total (joint 118) = 128865,38 Kg

Putotal ∗ B 128865,38 ∗ 10 ∗ 1,80


𝑀𝑢 = = = 579894210 N. mm
4 4
Mu 579894210
𝑀𝑛 = = = 724867762,5 N. mm
φ 0,8
Mn 724867762,5
𝑅𝑛 = = = 3,082 N/mm2
B ∗ d2 1800 ∗ 361,52

fy 360
𝑚= = = 13,24
0,85 ∗ fc′ 0,85 ∗ 32

Rasio Penulangan
1.4 1.4
𝜌𝑚𝑖𝑛 = = = 0,00389
fy 360

0,85 ∗ fc′ 600


𝜌𝑚𝑎𝑥 = 0,75 ∗ ∗ β1 ∗
fy 600 + fy

0,85 ∗ 32 600
𝜌𝑚𝑎𝑥 = 0,75 ∗ ∗ 0,83 ∗ = 0,0294
360 600 + 360

1 2 ∗ m ∗ Rn
𝜌 = ∗ (1 − √1 − )
m fy

1 2 ∗ 13,24 ∗ 3,082
𝜌 = ∗ (1 − √1 − ) = 0,00911
13,24 360

𝜌 = 0,00901 > 𝜌𝑚𝑖𝑛 = 0,00389


(Pakai "ρ = 0,00901" sebagai acuan)
𝐴𝑠 = ρ ∗ B ∗ d = 0,00901 ∗ 1800 ∗ 361,5 = 5862,81 mm2

As 5862,81
𝐽𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 (𝑛) = = = 21 Buah
0,25 ∗ π ∗ D2 0,25 ∗ π ∗ 192

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

𝐴𝑠 𝑝𝑎𝑠𝑎𝑛𝑔 = 0,25 ∗ π ∗ D2 ∗ n = 0,25 ∗ π ∗ 192 ∗ 21 = 5954,10 mm2


Lebar efektif L − 2 ∗ Sb − 2 ∗ Ø𝑇𝑢𝑙
𝐽𝑎𝑟𝑎𝑘 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 (𝑆) = =
Jumlah tulangan n−1

1800 − 2 ∗ 60 − 2 ∗ 19
𝐽𝑎𝑟𝑎𝑘 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 (𝑆) = = 82,1 ≈ 80 mm
21 − 1

 Kontrol Momen Nominal


𝐴𝑠 ∗ 𝑓𝑦
𝑀𝑛 = 𝐴𝑠 ∗ 𝑓𝑦 ∗ (𝑑 − 0,59 ∗ )
𝑓𝑐 ′ ∗ 𝑏

5954,10 ∗ 360
𝑀𝑛 = 5954,10 ∗ 360 ∗ (361,5 − 0,59 ∗ )
32 ∗ 1800

= 727804964,2 𝑁𝑚𝑚

𝛷𝑀𝑛 = 0,8 ∗ 727804964,2 = 582243971,4 𝑁. 𝑚𝑚

𝑀𝑢 = 579894210 𝑁. 𝑚𝑚 < 𝛷𝑀𝑛 = 582243971,4 𝑁. 𝑚𝑚 (𝐀𝐌𝐀𝐍)

 Jadi dipasang tulangan arah memanjang dan melintang D19-80

Penulangan Pilecap Arah Memanjang “B= 5800 mm”


1. Penulangan Pilecap Arah X, Acuan By = 5800 mm
 Momen Nominal akibat beban P kolom

 Bidang Momen akibat beban P kolom

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

34172,65
 Momen Nominal akibat beban tangga q= = 5891,84 Kg/m
5,80

 Bidang Momen akibat beban P kolom

 Statika akibat beban P kolom

Pu Total 138517,88 + 118753,2


RA = RB = P = =
2 2
= 128635,54 Kg
M max = RA*0,85 = 128635,54 ∗ 0,85 = 109340,21 𝐾𝑔. 𝑚

 Statika akibat beban Tangga

q ∗ 5,80 5891,84 ∗ 5,80


RA = RB = P = =
2 2
RA = 17086,34 Kg
M max = RA*2,90 = 17086,34 ∗ 2,90 = 49550,39 𝐾𝑔. 𝑚
M total = 109340,21 + 49550,39 = 158890,6 𝐾𝑔. 𝑚 ≈ 158890600 𝑁.mm
Mu 158890,6 ∗ 104
𝑀𝑛 = = = 1986132500 N. mm
φ 0,8
Mn 1986132500
𝑅𝑛 = 2
= = 2,63 N/mm2
B∗d 5800 ∗ 361,52

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

fy 360
𝑚= = = 13,24
0,85 ∗ fc′ 0,85 ∗ 32

Rasio Penulangan
1,4 1,4
𝜌𝑚𝑖𝑛 = = = 0,00389
fy 360

0,85 ∗ fc′ 600


𝜌𝑚𝑎𝑥 = 0,75 ∗ ∗ β1 ∗
fy 600 + fy

0,85 ∗ 32 600
𝜌𝑚𝑎𝑥 = 0,75 ∗ ∗ 0,83 ∗ = 0,0294
360 600 + 360

1 2 ∗ m ∗ Rn
𝜌 = ∗ (1 − √1 − )
m fy

1 2 ∗ 13,24 ∗ 2,63
𝜌 = ∗ (1 − √1 − ) = 0,00769
13,24 360

𝜌 = 0,00769 < 𝜌𝑚𝑖𝑛 = 0,00389


(Pakai "ρ = 0,00769" sebagai acuan)
𝐴𝑠 = ρ ∗ B ∗ d = 0,00769 ∗ 5800 ∗ 361,5 = 16123,62 mm2

As 16123,62
𝐽𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 (𝑛) = = = 57 buah
0,25 ∗ π ∗ D2 0,25 ∗ π ∗ 192

𝐴𝑠 𝑝𝑎𝑠𝑎𝑛𝑔 = 0,25 ∗ π ∗ D2 ∗ n = 0,25 ∗ π ∗ 192 ∗ 57 = 16161,14 mm2


Lebar efektif L − 2 ∗ Sb − 2 ∗ Ø𝑇𝑢𝑙
𝐽𝑎𝑟𝑎𝑘 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 (𝑆) = =
Jumlah tulangan n−1

5800 − 2 ∗ 60 − 2 ∗ 19
𝐽𝑎𝑟𝑎𝑘 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 (𝑆) = = 100,75 ≈ 100 mm
53 − 1

 Kontrol Momen Nominal


𝐴𝑠 ∗ 𝑓𝑦
𝑀𝑛 = 𝐴𝑠 ∗ 𝑓𝑦 ∗ (𝑑 − 0,59 ∗ )
𝑓𝑐 ′ ∗ 𝑏

16161,14 ∗ 360
𝑀𝑛 = 16161,14 ∗ 360 ∗ (361,5 − 0,59 ∗ )
32 ∗ 5800

ASTRI PUTRI R. | S1 TSB 2011 / 115724205


MERENCANA KONSTRUKSI BETON

= 1995608095 𝑁𝑚𝑚

𝛷𝑀𝑛 = 0,8 ∗ 1995608095 = 1596486476 𝑁. 𝑚𝑚

𝑀𝑢 = 158890600 𝑁. 𝑚𝑚 < 𝛷𝑀𝑛 = 1596486476. 𝑚𝑚 (𝐀𝐌𝐀𝐍)

 Jadi dipasang tulangan arah memanjang dan melintang D19-100