Project Charter For Cornerstone HQ Office Building March 2016
Project Charter For Cornerstone HQ Office Building March 2016
BUILDING, ONIRU,
VICTORIA ISLAND, LAGOS
February 2016.
CORNERSTONE HEADQUARTER PROJECT CHARTER
VERSION HISTORY
TABLE OF CONTENTS
VERSION HISTORY....................................................................................................................................................2
TABLE OF CONTENTS ..............................................................................................................................................3
1.0 INTRODUCTION ............................................................................................................................................4
1.1 Purpose of Project Charter ...........................................................................................................................4
1.2 Project Scope................................................................................................................................................4
2.0 PROJECT AND PRODUCT OVERVIEW ......................................................................................................4
2.1 Project Initiation ...........................................................................................................................................4
2.2 Concept Design ............................................................................................................................................6
2.3 Schedule of Area ........................................................................................................................................ 14
2.4 PROJECT COST........................................................................................................................................ 15
3.0 PROJECT ORGANISATION STRUCTURE (Roles and Responsibilities) .................................................. 16
4.0 THE PROJECT APPROACH ........................................................................................................................ 17
4.1 Schedule Baseline ...................................................................................................................................... 17
5.0 DETAILED PROJECT PROGRAM .............................................................................................................. 19
6.0 RISK MANAGEMENT PLAN ...................................................................................................................... 20
6.1 Risk Management Approach ...................................................................................................................... 20
6.2 Risk Management Matrix ........................................................................................................................... 20
6.3 Risk Management Mitigation and Response .............................................................................................. 22
7.0 CHANGE CONTROL PROCEDURE ........................................................................................................... 24
8.0 COMMUNICATION MANAGEMENT PLAN ............................................................................................ 26
8.1 Project Team .............................................................................................................................................. 26
8.2 Project Correspondence ............................................................................................................................. 27
8.3 Document Formats ..................................................................................................................................... 27
8.4 Document Status ........................................................................................................................................ 28
8.5 Issuance of Drawings ................................................................................................................................. 28
8.6 Shop Drawings review and approval process ............................................................................................. 29
8.7 Meetings ..................................................................................................................................................... 29
8.8 Issuance of Architects Certificate .............................................................................................................. 30
9.0 QUALITY PLAN MANAGEMENT ............................................................................................................. 31
10.0 ACCEPTANCE CRITERIA AND PROJECT CLOSURE ............................................................................ 32
PROJECT CHARTER APPROVAL ........................................................................................................................... 33
CORNERSTONE HEADQUARTER PROJECT CHARTER
1.0 INTRODUCTION
1.1 Purpose of Project Charter
This charter formally authorizes the commencement of the construction of the building services.
Included in this project charter are the scope statement; schedule; cost estimate; budget; and
provisions for scope, resource, schedule, communications, quality, risk, procurement, and
stakeholder management as well as project control.
The project is the development of a 12-storey commercial building, with the ground floor generally
used for utilities and a few offices; 1st - 4th floors are car park floors while 5th - 12th floors are
office spaces at Block 2, Plot 2, Oniru Estate, Victoria Island, Lagos. The project site is bordered
by Four-Points Hotel by Sheraton to the South, Fidelity Bank to the East, a vacant plot to the North
and Oniru Road on the East. Victoria Island (VI) is an affluent town and it is the main business
and financial Centre of Lagos, Nigeria
The client brief was conceptualized into the following spatial requirements and it include ground
and twelve suspended floors as detailed below:
Ground Floor
Reception, Access Control (security gate/CCTV control terminal), coffee shops, Porters’ lodge,
security units, AHU room and toilets, water treatment room, pump room, chemical store,
communication room, CCTV/BMS/Fire Panelroom, UPS room, generators and electrical panel
room
Typical suspended car parking floors, drivers’ room, mini telephone and electrical rooms.
At Award (Nm)
Preliminaries 368.17
Special Preliminaries 6.82
Main Building 4,755.10
External Works 216.16
Sub Total A 5,346.25
Contingency Sum 300.00
Sub Total B 5,646.25
VAT @ 5% 282.31
Grand Total N 5,928.56
CORNERSTONE HEADQUARTER PROJECT CHARTER
Project Manager
CPMS Limited
Quantity Surveyor
BQC Consultants
Piling Sub-Contractor
Colak Geotechnics Limited
Main Contractor
Business Contracting Limited (BCL)
MEP Subcontractor
Mar & Mor Integrated Suppliers
Services Limited
Other Specialist
Subcontractors
KEY
Contractual Relationship Functional Liaison Project Supervision
CORNERSTONE HEADQUARTER PROJECT CHARTER
The Master Programme will only be changed if an unexpected event occurs during the execution
of an assignment that could not be reasonably forecast by the Resource responsible or if the
CLIENT approves in writing an exception event. An exception event is an occurrence that;
Materially changes or varies the scope of the project as defined in this document
and in the Building Contract documents
An unnatural event/ “Act of God” (force majeure)
An event that could not be forecast, expected or anticipated by a reasonable and
prudent person with experience and competency in the field of the assignment.
Should the Master Programme be changed, only the duration of the assignments affected by the
exception event will be varied
CORNERSTONE HEADQUARTER PROJECT CHARTER
Risk managers will provide status updates on their assigned risks in the bi-weekly project team
meetings, but only when the meetings include their risk’s planned timeframe. Upon the completion
of the project, during the closing process, the project manager will analyze each risk as well as the
risk management process. Based on this analysis, the project manager will identify any
improvements that can be made to the risk management process for future projects. These
improvements will be captured as part of the lessons learned knowledge base.
Time Schedule
Facilities Annual Project Schedule Baseline Project
Management Detailed Schedule Management Completion
Plan (1-3 years) Requirements Schedule
(Schedule) Check List
Facilities Design
Conduct
Quality & and Specification Project Concept Design Review & Quality assurance Close Out
Inspections &
Inspection Standards Design & Themes Approval Process Check List
Quality Review
Program Cost Final Payment /
Cost Project Funding & Cost & Schedule Operating Budget
Management Cost Control Retention
Management Capital Budgeting Forecast Process
Guidelines Release
Facilities Ongoing
HR Staff Reductions/ Operations Staff
Management Project Management Staffing Requirements/Skills
Management Transfers Planning
Organization Review
Comms. & Program Reporting Project Reporting Project Cost & Budget Project Quality Project Closeout Final Status &
Project Status
Reporting Requirements Requirements Variance Performance Performance Financial Report
Safety, Safety, Insurance Project Safety Safety Program OCIP Close-out
Risk Tracking & Safety & Risk
Insurance & & Risk Mgt Program & Training & Review &
Resolution Mgt Compliance
Risk Policies Insurance Strategy Compliance Report
Contracting Subcontractor OCIP Close-out
Procurement Selection & Subcontractor Vendor Qualification/
Approach & Qualification Review & Punch List
& Contracts Contracting Selection/Contracting Selection
Controls Process Report
Project Issue
Issue Issue Management Confirm Issue Ongoing Issue
Management Issue Tracking & Resolution
Management Policy Resolution Management Process
Planning
CORNERSTONE HEADQUARTER PROJECT CHARTER
Internal Responses
Consultants
Consultants should prepare bound specification document to cover specification for all
items.
Consultants have been required to submit receipts of professional indemnity for the
purpose of the project.
The early engagement of consultants to ensure adequate design review/coordination.
The contractors were requested to review and query the design before the commencement
of construction to ensure due diligence was achieved
Further changes to design specifications should pass through the change control
procedure as highlighted in section 7.0 accompanied with detailed sketches were needed.
Project Management
Response and implementation of changes will be prompt to avert any delay either due to
pending design details and specifications from the consultants or final approval from the
client.
Project manager to ensure that the communication plan as itemized in Section 8.0 is
adhered to accordingly.
Weekly and monthly reports on the project must be prepared by the project management
team and issued to the client.
Monthly management meetings will be held with the client.
Contractor
Contractor to present a cash flow to the client/ project manager so that at all point the
contractor is deemed to have sufficient resource for execution of the project. An advance
payment has been made to the contractor to enable fix the contract. A monthly
valuation/payment for main contractor and also the MEP sub-contractor will be
considered. Milestone valuation for other sub-contractors will be utilized.
Contractor is expected to maintain a high level of HSE discipline on the project site.
The contractor is expected to submit a detailed monthly report on the project.
Main contractor is expected to retain competent personnel on the project at all time.
Main contractor to hold regular coordination meeting with the sub-contractors every
week. All meetings between Consultants and Sub contractors would have minutes taken
and circulated to all consultants for clarification, record and timelines of the items
discussed
CORNERSTONE HEADQUARTER PROJECT CHARTER
Sub-Contractors
All sub-contractors are expected to enter a sub-contract agreement with the main
contractor
All sub-contractors are required to provide workshop drawings for all installations.
External factors
These constitutes of all external factors that may affect the project which are not within the
immediate control of the project team;
The client has appointed a town planning consultant, Messrs Natuhab Consultants, to
ensure compliance with all state and federal regulations and liaise with the agencies
concerned as the need arises.
The Town Planning Approval for the project has been obtained and a copy of the
approved drawings, A3 format, will be presented to the main contractor for record
purposes.
Special attention will be paid to any changes in government legislation and basic labour
rate (NJIC) of December 2007 as it affects the project
Any experience of Area Boys/ Community challenges in Oniru.
CORNERSTONE HEADQUARTER PROJECT CHARTER
The Change Management Plan establishes how changes will be proposed, accepted, monitored,
and controlled. These procedures will govern changes to the baseline project scope including
changes to the work breakdown structure and requirements from project inception through to
completion. In addition, the change control procedures will govern changes to the baseline
schedule and cost. This Change Management Plan addresses the following activities:
Identification and inventory of change requests
Analysis and documentation of the complete impact of requested changes
Approval or rejection of change requests
Tracking changes and updating of project documentation to account for approved changes
The Client in conjunction with the Project Manager, is responsible for implementing a Change
management process on the project, encompassing changes during design and contract Change
Orders during construction.
The following steps are proposed organization change control process for Cornerstone
headquarters building project:
(a) If the change is at the request for information, RFI, by the contractor;
1. The requestor (contractor) will submit a completed RFI form to the project manager.
2. Project Manager will document the change request in the change register where all
change requests will be logged for the duration of the project.
3. The project manager will conduct an evaluation of the impact of the change to cost,
risk, schedule, and scope through the project consulting team.
4. If the RFI is for updates and information, the consultants shall issue direct response to
the contractor and copy the project manager.
5. However, for RFI with cost, time and quality implication, analysis of the change
request shall be presented to Client for review and approval by the project manager.
6. If a change is approved by the client, the project manager through the appropriate
consultant will issue an instruction to the contractor.
7. The PM will update and re-baseline project documentation as necessary.
Gboyega Adesiyun Project Manager, CPMS gadesiyun@ cpmslimited.com 0818 504 0674
Ayodele Odele MEP Consultant, UNECON Ayodele.odele@ uneconassociates.com 0812 848 8827
Photographs For the registration and distribution of JPEG, TIFF, PNG where required
photographs
Procedures / For the registration and distribution of Acrobat (PDF), MS Word, MS Excel where
Method statements procedures required
Sketches
Instructions
Typically, the file format for all soft copy documents will be: Adobe Acrobat PDF format. Other
native or original formats can be utilized if a “live” document needs to be exchanged.
* Note that hard copies will be required for all the above documents for record purposes and use
where soft copy documents may be dimmed unusable or impractical. It will be on the onus of the
resource to facilitate the distribution and production of such documents as related to his/her
discipline.
Issued for Information Used for all documents issued for Information purposes only
Issued for Review Used for all documents issued for 3rd party review and comment
Issued for ConstructionUsed for all documents which have been reviewed and considered to be Good
for Construction
Approved Used for all documents which have been reviewed and the contents are
approved.
Approved with Comments Used for all documents which been submitted for review and designated
approved with comments.
Revise & Re-Submit Used for all documents which have been submitted for review and returned
requiring the documents to be updated and re-submitted for review.
Rejected Used for all documents which have been submitted for review and the
documents has been rejected.
The main contractor shall review all drawings issued to him and make sure there are no
discrepancies.
All consultants must ensure that their drawings do not conflict with the overall design.
Before a revised drawing is issued by any consultant to the main contractor, the consultant
shall make sure that the architect has reviewed it to ensure it is integrated into the overall
design.
All shop drawings shall be issued by the subcontractor to the respective consultant.
Hard copies plus CAD copies of such drawings shall be submitted to the consultant when
requested.
Drawings are to be checked and reviewed within 10 working days and are to be returned,
properly marked to indicate its status (see below) to the sub-contractor.
8.7 Meetings
All consultants are expected to attend the Consultants Coordination Meetings, Site Meetings, Site
Inspections and any impromptu meetings setup to resolve arising matters. Likewise, the main
contractor and the sub-contractors are to attend Site Inspections, Site Meetings and Contractor
Coordination Meetings.
The site meetings will take place every two calendar weeks on the same day at the project site.
Prior to commencement of the site meeting, an hour long Consultants Coordination Meeting will
be held before a joint site inspection is undertaken. However, regular site inspection will be carried
out by individual consultant on the project.
Kindly note that the Project Manager will be responsible for chairing the site meeting. The site
meeting will be twice (2) in a month. The Project Manager will prepare and distribute the minutes
of the meeting to the contractors and sub-contractors and all the consultants on the project
The Project Manager will also distribute a meeting agenda at least a day prior to any scheduled
meeting and all participants are expected to review the agenda prior to the meeting. It is imperative
that all participants arrive to each meeting on time and all cell phones are set to vibrate mode to
minimize distractions.
CORNERSTONE HEADQUARTER PROJECT CHARTER
A similar and concurrent process will be run for every other subcontractor on the project.
The client will sign off on the final acceptance of the project deliverable. However, the Project
Manager is responsible for quality management throughout the duration of the project. The
Project Manager is responsible for implementing the Quality Management Plan and ensuring all
tasks, processes, and documentation are compliant with the plan. The Project Manager will
establish acceptable quality standards. The Project Manager is also responsible for
communicating and tracking all quality standards to the project team and stakeholders.
The remaining member of the project team, as well as the stakeholders will be responsible for
assisting the Project Manager and Quality Specialists in the establishment of acceptable quality
standards. They will also work to ensure that all quality standards are met and communicate any
concerns regarding quality to the Project Manager.
CORNERSTONE HEADQUARTER PROJECT CHARTER
The contractor is expected to complete the project by December 2017. The Project Manager will
required to schedule a date for practical completion where all the project team/ stakeholders will
converge at the site to jointly inspect the completed project and client to take full posession of
the building for functional use. All Assignments should be delivered complete in every respect and
with sufficient detail/completion to ensure that they are “fit-for-purpose or use” for which they are
intended. M/s BCL will also be required to promptly carry out all remedial works necessary from
time to time during the defect liability period of twelve (12) months
The Project Manager will then develop a project review template to evaluate the project base on
the following:
i. Project performance against Objective
ii. Project Performance against budget
iii. Risk analysis and control measure taken
CORNERSTONE HEADQUARTER PROJECT CHARTER
Signature: Date:
Print Name:
Title:
Signature: Date:
Print Name:
Title:
Signature: Date:
Print Name:
Title:
Signature: Date:
Print Name:
Title:
Signature: Date:
Print Name:
Title:
Signature: Date:
Print Name:
Title: