Soal Latihan Tie in
Soal Latihan Tie in
PT. Underground Glory Hole, located in East Kalimantan, early 2016 will begin to
conduct underground mining. The project is a 1500 m long road tunnel with a cross
section area of 5.57 square metre. Therefore, a road tunnel with horseshoe shaped
must be made. The tunnel face is as seen in the picture below
Using data available, your team receives an assignment to design a tunnel blasting
pattern of road tunnel per round by using swedish method. You can use the tables and
graphs that are available with this project, then:
W
1
2nd CUT
Burden, m B1
Distance between holes, m W2
The distance between the center of blasting hole C–C
into the center of empty hole, m
Stemming, m h2
Concentration of column charge ,kg/m Lc
Column Charge, kg Qc
Number of holes N2
B1
W -C
1 C
W2
3rd CUT
Burden, m B2
Distance between holes, m W3
The distance between the center of blasting hole C–C
into the center of empty hole, m
Stemming, m h3
Concentration of column charge ,kg/m Lc
Column Charge, kg Qc
Number of holes N3
C-C
B2
W2
W
3
4th CUT
Burden, m B3
Distance between holes, m W4
The distance between the center of blasting hole C–C
into the center of empty hole, m
Stemming, m h4
Concentration of column charge ,kg/m Lc
Column Charge, kg Qc
Concentration of bottom charge ,kg/m Lb
Bottom Charge, kg Qb
Number of holes N4
-C
C
3
B
W
3
W4
Empty hole
Blasting hole
Picture 1
Picture 2
Picture 3
B
W = 0.6
1.8
Charge Concentration, kg/m
W = 0.4
W
1.6 W W = 0.8
1 .5
=
1.4 B
W = 0.2 W = 1.0
1.2
B =W
1.0 W = 1.2
0.8
0.6 .5 W
B=0
0.4
0.2
0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
Max. burden, m
Picture 4
Picture 5
Table 1
Height of Charge Concentration
Burden, Spacing, Stemming,
Part of the round bottom Bottom, Column,
m m m
charge, m kg/m kg/m
Floor 1.0 x B 1.1 x B 1/3 x H lb 1.0 x lb 0.2 x B
Wall 0.9 x B 1.1 x B 1/6 x H lb 0.4 x lb 0.5 x B
Roof 0.9 x B 1.1 x B 1/6 x H lb 0.3 x lb 0.5 x B
STOPING:
Upwards 1.0 x B 1.1 x B 1/3 x H lb 0.5 x lb 0.5 x B
Horizontal 1.0 x B 1.1 x B 1/3 x H lb 0.5 x lb 0.5 x B
Downwards 1.0 x B 1.1 x B 1/3 x H lb 0.5 x lb 0.5 x B