SpColumn Text Results
SpColumn Text Results
10 (TM) Page 1
862807412 day trial license. Locking Code: 4-28005. User: engineering, DTS Engineering 08/02/18
E:\Documents\02 Google\PT DTS\1803 - Pedestrian Bridge Simatupang\03. Calculation...\COL_C4(2).col 12:50 AM
oooooo o
oo oo oo
ooooo oooooo oo ooooo oo oo oo o oooooooooo o ooooo
oo o oo oo oo oo oo oo oo oo oo oo oo oo oo
oo oo oo oo oo oo oo oo oo oo oo oo oo oo
ooooo oo oo oo oo oo oo oo oo oo oo oo oo oo
oo oooooo oo oo oo oo oo oo oo oo oo oo oo
o oo oo oo oo oo oo oo o oo oo oo oo oo oo oo
ooooo oo oooooo ooooo ooo ooooo o oo oo oo oo oo (TM)
==========================================================================================================
spColumn v5.10 (TM)
Computer program for the Strength Design of Reinforced Concrete Sections
Copyright © 1988-2016, STRUCTUREPOINT, LLC.
All rights reserved
==========================================================================================================
Licensee stated above acknowledges that STRUCTUREPOINT (SP) is not and cannot be responsible for either
the accuracy or adequacy of the material supplied as input for processing by the spColumn computer
program. Furthermore, STRUCTUREPOINT neither makes any warranty expressed nor implied with respect to the
correctness of the output prepared by the spColumn program. Although STRUCTUREPOINT has endeavored to
produce spColumn error free the program is not and cannot be certified infallible. The final and only
responsibility for analysis, design and engineering documents is the licensee's. Accordingly,
STRUCTUREPOINT disclaims all responsibility in contract, negligence or other tort for any analysis, design
or engineering documents prepared in connection with the use of the spColumn program.
STRUCTUREPOINT - spColumn v5.10 (TM) Page 2
862807412 day trial license. Locking Code: 4-28005. User: engineering, DTS Engineering 08/02/18
E:\Documents\02 Google\PT DTS\1803 - Pedestrian Bridge Simatupang\03. Calculation...\COL_C4(2).col 12:50 AM
General Information:
====================
File Name: E:\Documents\02 Google\PT DTS\1803 - Pedestrian Bridge Simatupang\03. Ca...\COL_C4(2).col
Project: TWJO MRT - PB2
Column: C4 Engineer: IWL
Code: ACI 318-02 Units: Metric
Material Properties:
====================
Concrete: Standard Steel: Standard
f'c = 30 MPa fy = 400 MPa
Ec = 25743 MPa Es = 200000 MPa
fc = 25.5 MPa Eps_yt = 0.002 mm/mm
Eps_u = 0.003 mm/mm
Beta1 = 0.83245
Section:
========
Rectangular: Width = 1300 mm Depth = 1300 mm
Reinforcement:
==============
Bar Set: ASTM A615M
Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2)
---- --------- ----------- ---- --------- ----------- ---- --------- -----------
# 10 10 71 # 13 13 129 # 16 16 199
# 19 19 284 # 22 22 387 # 25 25 510
# 29 29 645 # 32 32 819 # 36 36 1006
# 43 43 1452 # 57 57 2581
Confinement: Tied; #10 ties with #32 bars, #13 with larger bars.
phi(a) = 0.8, phi(b) = 0.9, phi(c) = 0.65
Layout: Rectangular
Pattern: All Sides Equal (Cover to transverse reinforcement)
Total steel area: As = 18360 mm^2 at rho = 1.09%
Minimum clear spacing = 92 mm
Service Loads:
==============
Load Axial Load Mx @ Top Mx @ Bot My @ Top My @ Bot
No. Case kN kNm kNm kNm kNm
--- ---- ------------ ------------ ------------ ------------ ------------
1 Dead 473.48 0.00 0.00 516.60 516.60
Live 26.10 0.00 0.00 244.25 244.25
Wind 0.13 0.00 4.18 10.32 34.77
EQ 0.14 0.00 -0.14 18.44 -99.45
Snow 0.00 0.00 0.00 0.00 0.00
2 Dead 473.48 0.00 0.00 516.60 516.60
Live 26.10 0.00 0.00 244.25 244.25
Wind 0.02 0.00 101.01 -0.01 -1.97
EQ 0.03 -18.70 -2.21 -0.01 -2.48
Snow 0.00 0.00 0.00 0.00 0.00
Load Combinations:
==================
U1 = 1.400*Dead + 0.000*Live + 0.000*Wind + 0.000*EarthQuake + 0.000*Snow
U2 = 1.200*Dead + 1.600*Live + 0.000*Wind + 0.000*EarthQuake + 0.000*Snow
U3 = 1.200*Dead + 1.000*Live + 0.000*Wind + 0.000*EarthQuake + 0.000*Snow
STRUCTUREPOINT - spColumn v5.10 (TM) Page 3
862807412 day trial license. Locking Code: 4-28005. User: engineering, DTS Engineering 08/02/18
E:\Documents\02 Google\PT DTS\1803 - Pedestrian Bridge Simatupang\03. Calculation...\COL_C4(2).col 12:50 AM
Slenderness:
============
Sway Criteria:
--------------
X-axis: Nonsway column.
Y-axis: Nonsway column.
U5 (N/A) (N/A) (N/A) (N/A) (N/A) 594.31 (N/A) 307814.94 0.956 (N/A) (N/A) *
U6 (N/A) (N/A) (N/A) (N/A) (N/A) 426.16 (N/A) 301058.88 1.000 (N/A) (N/A) *
U7 (N/A) (N/A) (N/A) (N/A) (N/A) 568.16 (N/A) 301047.59 1.000 (N/A) (N/A) *
U8 (N/A) (N/A) (N/A) (N/A) (N/A) 594.24 (N/A) 307798.75 0.956 (N/A) (N/A) *
U9 (N/A) (N/A) (N/A) (N/A) (N/A) 426.10 (N/A) 301047.59 1.000 (N/A) (N/A) *
U10 (N/A) (N/A) (N/A) (N/A) (N/A) 594.31 (N/A) 307814.47 0.956 (N/A) (N/A) *
U11 (N/A) (N/A) (N/A) (N/A) (N/A) 426.16 (N/A) 301058.16 1.000 (N/A) (N/A) *
U12 (N/A) (N/A) (N/A) (N/A) (N/A) 594.25 (N/A) 307799.25 0.956 (N/A) (N/A) *
U13 (N/A) (N/A) (N/A) (N/A) (N/A) 426.10 (N/A) 301047.59 1.000 (N/A) (N/A) *
Y-axis -------------- 1st Order ------------- --------- 2nd Order -------- - Ratio -
Load Mns Ms Mu Mmin Mi Mc 2nd/1st
Combo kNm kNm kNm kNm kNm kNm
------- ------------ ------------ ------------ ------------ --------------- ------------ ---------
1 U1 723.24 (N/A) 723.24 (N/A) M1= (N/A) (N/A) (N/A)
-723.24 (N/A) -723.24 (N/A) M2= (N/A) (N/A) (N/A)
1 U2 1010.72 (N/A) 1010.72 (N/A) M1= (N/A) (N/A) (N/A)
-1010.72 (N/A) -1010.72 (N/A) M2= (N/A) (N/A) (N/A)
1 U3 864.17 (N/A) 864.17 (N/A) M1= (N/A) (N/A) (N/A)
-864.17 (N/A) -864.17 (N/A) M2= (N/A) (N/A) (N/A)
1 U4 619.92 (N/A) 628.18 (N/A) M1= (N/A) (N/A) (N/A)
-619.92 (N/A) -647.74 (N/A) M2= (N/A) (N/A) (N/A)
1 U5 864.17 (N/A) 880.68 (N/A) M1= (N/A) (N/A) (N/A)
-864.17 (N/A) -919.80 (N/A) M2= (N/A) (N/A) (N/A)
1 U6 464.94 (N/A) 481.45 (N/A) M1= (N/A) (N/A) (N/A)
-464.94 (N/A) -520.57 (N/A) M2= (N/A) (N/A) (N/A)
1 U7 619.92 (N/A) 611.66 (N/A) M2= (N/A) (N/A) (N/A)
-619.92 (N/A) -592.10 (N/A) M1= (N/A) (N/A) (N/A)
1 U8 864.17 (N/A) 847.66 (N/A) M2= (N/A) (N/A) (N/A)
-864.17 (N/A) -808.54 (N/A) M1= (N/A) (N/A) (N/A)
1 U9 464.94 (N/A) 448.43 (N/A) M2= (N/A) (N/A) (N/A)
-464.94 (N/A) -409.31 (N/A) M1= (N/A) (N/A) (N/A)
1 U10 864.17 (N/A) 882.61 (N/A) M2= (N/A) (N/A) (N/A)
-864.17 (N/A) -764.72 (N/A) M1= (N/A) (N/A) (N/A)
1 U11 464.94 (N/A) 483.38 (N/A) M2= (N/A) (N/A) (N/A)
-464.94 (N/A) -365.49 (N/A) M1= (N/A) (N/A) (N/A)
1 U12 864.17 (N/A) 845.73 (N/A) M1= (N/A) (N/A) (N/A)
-864.17 (N/A) -963.62 (N/A) M2= (N/A) (N/A) (N/A)
1 U13 464.94 (N/A) 446.50 (N/A) M1= (N/A) (N/A) (N/A)
-464.94 (N/A) -564.39 (N/A) M2= (N/A) (N/A) (N/A)
2 U1 723.24 (N/A) 723.24 (N/A) M1= (N/A) (N/A) (N/A)
-723.24 (N/A) -723.24 (N/A) M2= (N/A) (N/A) (N/A)
2 U2 1010.72 (N/A) 1010.72 (N/A) M1= (N/A) (N/A) (N/A)
-1010.72 (N/A) -1010.72 (N/A) M2= (N/A) (N/A) (N/A)
2 U3 864.17 (N/A) 864.17 (N/A) M1= (N/A) (N/A) (N/A)
-864.17 (N/A) -864.17 (N/A) M2= (N/A) (N/A) (N/A)
2 U4 619.92 (N/A) 619.91 (N/A) M2= (N/A) (N/A) (N/A)
-619.92 (N/A) -618.34 (N/A) M1= (N/A) (N/A) (N/A)
2 U5 864.17 (N/A) 864.15 (N/A) M2= (N/A) (N/A) (N/A)
-864.17 (N/A) -861.02 (N/A) M1= (N/A) (N/A) (N/A)
2 U6 464.94 (N/A) 464.92 (N/A) M2= (N/A) (N/A) (N/A)
-464.94 (N/A) -461.79 (N/A) M1= (N/A) (N/A) (N/A)
2 U7 619.92 (N/A) 619.93 (N/A) M1= (N/A) (N/A) (N/A)
-619.92 (N/A) -621.50 (N/A) M2= (N/A) (N/A) (N/A)
2 U8 864.17 (N/A) 864.19 (N/A) M1= (N/A) (N/A) (N/A)
-864.17 (N/A) -867.32 (N/A) M2= (N/A) (N/A) (N/A)
2 U9 464.94 (N/A) 464.96 (N/A) M1= (N/A) (N/A) (N/A)
-464.94 (N/A) -468.09 (N/A) M2= (N/A) (N/A) (N/A)
2 U10 864.17 (N/A) 864.16 (N/A) M2= (N/A) (N/A) (N/A)
-864.17 (N/A) -861.69 (N/A) M1= (N/A) (N/A) (N/A)
STRUCTUREPOINT - spColumn v5.10 (TM) Page 6