CJ03 - Display Work Breakdown Structure
CJ03 - Display Work Breakdown Structure
CJ03 - Display Work Breakdown Structure
Work Instruction
Purpose
Use this procedure to display a project Work Breakdown Structure (WBS) and Project
Definition.
Trigger
None
Prerequisites
None
Menu Path
Use the following menu path to begin this transaction:
Transaction Code
CJ023
Helpful Hints
None
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
Procedure
1. Start the transaction using the menu path Logistics Project System Project Special
Maintenance Function Work Breakdown Structure (WBS) Display or transaction
code CJ03.
P000040
2. Complete ONE of the above fields to open: i) a Project definition; ii) a WBS Element.
Project def. Project number and title; framework of data that is binding to
the entire project
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
Applicant no. Number assigned to the applicant; person responsible for the
results of the project, usually the project team leader
Example: 12 – Heffelfinger, Bob
Start date Commencement date of activity or business event
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
Responsible persons assigned to WBS elements may not be the same persons
assigned in the project definition. The responsible person in the project definition and
at the WBS level 1 is usually the project engineering leader. The responsible person
for any lower-level WBS element is usually the engineering specialist leader for the
related engineering discipline in the project.
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
Costing sheet Group of activities that are costed collectively, used to control
overhead calculations
Example: A00000
Invest.profile Investment profile
Example: Z2660B
For Document Control Purposes, Printed Copies Of These Procedures May Not Be Current. Please Verify On-line Before Using.
Filename: Version: Rev 2 Work Instruction
Reference: Last Modified: 10.23.2004 14:34:00 Page 1 /13
Title: Display Work Breakdown Structure
Workstream : Project Systems (DOC)
Result
You have displayed a project Work Breakdown Structure (WBS) and Project Definition.