Key Plan: Batching Plant Site Office

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A-1

Edition

0+345.378

0+000
SOUTH ROAD PROPERTIES

Date
THIS ACCESS ROAD

RECTA
RECTA
Approved

AD
RO
L
TA
AS
CO

1.
2.

60
40
2.
2.

70
40
21/09/2018

SITE OFFICE &


Date

BATCHING PLANT

0+100
0+200
Drawing Chek

0+300
OG
21/09/2018

ER
Date

IV

T
OR
CA

I
LA

A
BU

CE
BU
SO
UT

R
RT

H CO
AS
Drawn

TA

T
LR
OA
D

S
FI TAL

U
SH IS

Side Walk
PO AY
R

Concre

te
Fence
Fence
te
Concre
VE

RT

Side Walk
Pavem

ent

B
RI

Pavem

ent
Existin

g
Concr
Concre
ete
Rip te
Road Fence
Rap
O

Paveme

nt

Pavem
CA

ent

E
Existin

g
Concr
ete
Concre
Road
te
Fence
Pavem
LA

ent
Fence
te
Concre
BU

Pavem

ent

Existin

g
Concr
ete
Concre
Road
te
Fence

C
Rip
Rap

61NP
05ND
BAKIM KAPAĞI

1 KEY PLAN
**.** 1: 400

BATCHING PLANT SITE OFFICE

43
2
1
132M
160M

BAKIM KAPAĞI

PN16
DN50
SEE ACCESS ROAD DETAIL
TW-CLJV-DRA-456202
DRAWING NO.4

H
CL

7.00 METERS

6.00

Side Walk
0.50 3.00 3.00 0.50

VANA 2"

"2 ANAV
2

2
4kW- 2885rpm 4kW- 2885rpm

C 50/200 C 50/200

2.5% 2.5%

DITCH LANE LANE DITCH

Side Walk Side Walk

4 CROSS SECTION Cub & Gutter Edge of Pavement Cub & Gutter

SCALE 1: 400
**.**
Island

(now) Coastal Road


(now) Coastal Road
Edge of Pavement
Cub & Gutter Cub & Gutter
Side Walk Side Walk

20 CM. THK. SUB-BASE 2 ACCESS ROAD PLAN


95% COMPACTION SCALE
2.5% SLOPE **.** 1: 800
GEOTEXTILE

30 CM. THK. STONE FILL


HORIZONTAL = 5.00 5.00
SCALES
APPROX. 20 TO 40 KG. VERTICAL =
0+000 0+031.76 0+177.37 0+345.38
1.60 2.40 2.70 2.40

0.21% -0.18%
2.50 2.50
5 ACCESS ROAD DETAIL 2.52%

SCALE 1: 100
**.**

P.C. 0.00
0.00
OUANTITIES
1.614

2.095

2.481

2.548

2.516

2.666

2.633

2.751

2.679

2.654

2.537

2.454

2.522

2.553

2.525

2.503

2.476

2.399
2.375
Ground Elevation
GEOTEXTILE 2.072 SQ. M
0.000

20.000

40.000

60.000

80.000

100.000

120.000

140.000

160.000

180.000

200.000

220.000

240.000

260.000

280.000

300.000

320.000

340.000
345.378
STONE FILL (APPROX. 20 TO 40 KG) E= 30 CM. 706 CU. M
Distances to Origin
SUB BASE 95% COMPACTION E=20 CM 475 CU.M

3 LONGITUDINAL SECTION
SCALE 1: 800
**.**

MAIN CONTRACTOR CONSULTANT SUBCONTRACTOR PROJECT: REVISIONS SHEET CONTENTS: SHEET NO.

SITE OFFICE & BATCHING PLANT ACCESS ROAD 1 OF 1


KEY PLAN
CEBU-CORDOVA LINK ACCESS ROAD PLAN, CROSS & LONGITUIDNAL SECTION SCALE
DETAIL, QUANTITIES AS SHOWN
EXPRESSWAY PROJECT A RT OG 21/09/2018 RELEASED FOR CONSTRUCTION DRAWING NO. TW-CLJV-DRA-456202 REV. NO.
DATE: 21/09/2018
REV. BY CHK DATE DESCRIPTION ISSUE FOR: CONSTRUCTION ORIGINAL IN : A1 A

You might also like