Daca Respnsily: Cammaiains Sunda Commie sAEST34
Ise ae 2 ay 2012
‘ese Paned Up 2 ery 206 Teleummuicons-CileTeingand Aceptane
'$22 nde Pat Cnseton si beraponiti fr
52.21 Performing the cable acceptance testing onal ables in
sccordance with
This SAES and any other ets speifid on the work onder
by Engineering,
$22.2 Ensuring that 100% of costuced facilites met Saudi
‘Aramco mandatory requirements forthe typeof facility being
tested.
$2.23 Testing facity extensions from terminated point to terminated
point
£2.25 Repairing any trouble detected during cable aceptance testing
inthe ne facies
5.3. Cable Fvility Acceptance Test Requirements
Before a abl is designated for voice frequency (VF) or El digital transmission,
standard cable aceptance testing procedures shall be completed to verify de and
high frequency acceptability.
Commetay Noe.
_Atcabeacoptnoe tats rom the cata ece mst bo peromed rom the
‘Siesta be contac protector oho aint fra.
53.1 Allable pis including POTS, (Loaded & Unloaded), Special Service,
‘nd EI digital on abl, shall meet the minimum acceptance test
reauremens listed in Table 1
Pe 6ot17