This document announces Addendum No. 8 for the Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations; TVE Phase-1 (Package:15) project. It extends the deadline for bid submission to September 11, 2018 at 3:00 PM and changes the location of the technical bid opening to the Mumbai Metro Rail Corporation Limited office on the same date at 4:00 PM.
This document announces Addendum No. 8 for the Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations; TVE Phase-1 (Package:15) project. It extends the deadline for bid submission to September 11, 2018 at 3:00 PM and changes the location of the technical bid opening to the Mumbai Metro Rail Corporation Limited office on the same date at 4:00 PM.
This document announces Addendum No. 8 for the Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations; TVE Phase-1 (Package:15) project. It extends the deadline for bid submission to September 11, 2018 at 3:00 PM and changes the location of the technical bid opening to the Mumbai Metro Rail Corporation Limited office on the same date at 4:00 PM.