Professional Documents
Culture Documents
Estimate PDF
Estimate PDF
GENERAL GUIDELINES
THIS DEPARTMENT ORDER SETS THE FORMULATION OF POLICIES,
RULES AND PROCEDURES RELATIVE TO THE PREPARATION OF THE
“APPROVED BUDGET FOR THE CONTRACT” (ABC) ISSUED FOR THE
GUIDANCE OF ALL CONCERNED.
ALL THE ITEMS OF WORK TO BE USED SHALL BE IN ACCORDANCE
WITH DPWH STANDARD SPECIFICATIONS.
NVPILAR 2008
COST ESTIMATES
(D0 57 S.2002)
NVPILAR 2008
PURPOSE
THIS DEPARTMENT ORDER SETS THE GUIDELINES, RULES AND PROCEDURES, TO
BE FOLLOWED BY ALL CONCERNED IN THE IMPLEMENTATION OF DEPARTMENT OF
LABOR AND EMPLOYMENT D.O. No. 13(DOLE D.O. No.13), SERIES OF 1998
OTHERWISE KNOWN AS THE “GUIDELINES GOVERNING OCCUPATIONAL SAFETY AND
HEALTH IN THE CONSTRUCTION INDUSTRY”, WITH EMPHASIS GIVEN ON THE
METHODOLOGY TO BE USED IN ESTIMATING THE COST OF CONSTRUCTION SAFETY
AND HEALTH PROGRAM AS REQUIRED IN SECTION 17.
GENERAL GUIDELINES
IN COMPLIANCE WITH SECTION 17 OF DOLE D.O. No. 13, THE IMPLENTATION OF
CONSTRUCTION SAFETY SHALL BE CONSIDERED IN ALL STAGES OF PROJECT
PROCUREMENT ( DESIGN, ESTIMATE, AND CONSTRUCTION ) AND ITS COST SHALL
BE INTEGRATED TO THE OVERALL PROJECT COST UNDER PAY ITEM “SPL-
CONSTRUCTION SAFETY AND HEALTH” AS A LUMPSUM AMOUNT, TO BE
QUANTIFIED IN THE DETAILED ESTIMATE. LIKEWISE, ALL REQUIREMENTS,
PROVISIONS, AND INSTRUCTIONS PERTAINING TO THE IMPLEMENTATION OF
CONSTRUCTION SAFETY AND HEALTH IN EVERY PROJECT SHALL BE INCLUDED IN
THE PROJECT BIDDING DOCUMENTS SPECIFICALLY UNDER THE INSTRUCTION TO
BIDDERS.
NVPILAR 2008
CONCTRUCTION PROJECT
(D.O. No. 56 S. 2005)
MANPOWER EQUIPMENT/FACILITIES
COSTING
PAY ITEM “SPL – CONSTRUCTION SAFETY AND HEALTH” AS
A LUMP SUM AMOUNT, TO BE QUANTIFIED IN THE DETAILED
ESTIMATE.
NVPILAR 2008
SAFE CONDITION MANDATORY ACTION STOP OR
PROHIBITION
SPECIFICATIONS
BOOKS
1. ESTIMATING BILL OF MATERIALS BY VICENTE TAGAYUN
NVPILAR 2008
OTHER CODES AND SPECIFICATIONS:
P.D.1096 – NATIONAL BUILDING CODE
R.A. 7160 – LOCAL GOVT. CODE OF 1991
DOLE D.O. 13 SERIES 1998 – CONSTRUCTION SAFETY
DPWH D.O. 56 SERIES 2005 – CONSTRUCTION SAFETY
B.P. 344 – ACCESSIBILITY LAW
NATIONAL STRUCTURAL CODE OF THE PHILIPPINES
AMERICAN CONCRETE INSTITUTE ( ACI )
AMERICAN SOCIETY OF TESTING MATERIALS ( ASTM )
ELECTRICAL CODE OF THE PHILIPPINES
PLUMBING CODE OF THE PHILIPPINES
PHILIPPINE MECHANICAL ENGINEERING CODE
ALL MATERIALS QUALITY TESTING CODE
NVPILAR 2008
NATIONAL BUILDING CODE
( P.D. 1096 )
5 MAJOR DIVISIONS IN BUILDING PLANS SUBJECT TO ESTIMATE
ARCHITECTURAL
ARCHITECTURAL AESTHETIC
AESTHETIC ARCHITECT
ARCHITECT
STRUCTURAL
STRUCTURAL STRENGTH
STRENGTH CIVIL
CIVILENGR
ENGR
ELECTRICAL/
ELECTRICAL/ POWER,
POWER,LIGHTING
LIGHTING ELECTL
ELECTLENGR/
ENGR/
ELECTRONIC
ELECTRONIC & COMMUNICATION
& COMMUNICATION ELECTRONIC
ELECTRONICENGR
ENGR
SANITARY/
SANITARY/ HEALTH
HEALTHAND
AND SANITARY
SANITARYENGR/
ENGR/
PLUMBING
PLUMBING SANITATION
SANITATION MASTER
MASTERPLUMBER
PLUMBER
MECHANICAL
MECHANICAL NECESSITIES
NECESSITIES MECHANICAL
MECHANICALENGR
ENGR
NVPILAR 2008
CLASSIFICATION OF BUILDING STRUCTURES
NVPILAR 2008
INSTITUTIONAL – EDUCATIONAL INSTITUTIONS, LIBRARIES, MUSEUMS,
CLUBHOUSES, HOSPITALS, SANITARIA, ASYLUMS, HOMES
FOR THE AGED, JAILS, POLICE AND FIRE STATIONS, PLACES
OF WORSHIP, ETC.
NVPILAR 2008
TYPES OF CONSTRUCTION
( P.D. 1096, CHAPTER 4, SECTION 401 )
TYPE I - TYPE I BUILDING SHALL BE OF WOOD CONSTRUCTION. THE STRUCTURAL
ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED BY THIS CODE.
TYPE III – TYPE III BUILDING SHALL BE OF MASONRY AND WOOD CONSTRUCTION,
STRUCTURAL ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED
BY THIS CODE: PROVIDED, THAT THE BUILDING SHALL BE ONE-HOUR
FIRE – RESISTIVE THROUGHOUT. EXTERIOR WALLS SHALL BE
INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION
ARCHITECTURAL PLAN
1 2 3 3 2 1 A B C
GA 26 CORR. G I. GA 26 CORR. G I.
ROOFING ROOFING
1 2 3 2 1 2 3
1 3
SCH. OF DOORS & WINDOWS
C C C
W-2 W-2
EXPOSED SLOPE
B STEEL ‘C’ B
CLASSROOM B PURLINS AND
SLOPE
RAFTERS D-1 W-1 & W-2
W-1 FLUSH TYPE GLASS JALOUSIE
D-1 W-1 D-1 HOLLOW CORE WINDOWS ON
A A A DOOR W MARINE ALUMINUM HOUSIG
CORRIDOR PLYWOOD FACING
ON WOOD FRAME
FLOOR PLAN REFLECTED CEILING ROOF PLAN
WF-1 WF-1
WF-1
WF-1
LB LB
BASE PLATE W LONG
ANCHOR BOLTS
C1-F1
C1-F1
ROOF INSULATION CEILING
FIN. COMPRESSED BETWEEN SLAB ON FILL
PURLINS AND RAFTER
D-1 W-2
WF-1
WF-1
CORRIDOR
DOWEL
CLASSROOM FFL WF-1 WF-1
FGL
WELL COMPACTED NGL
COL. FTG. C1-F1 C1-F1 C1-F1
GRAVEL FILL
WALL FTG
DETAIL CROSS SECTION
FOUNDATION PLAN
DOWNSPOUT
CATCH
GATE SEPTIC
BASIN
WATER METER VALVE VAULT
METER SHUT-OFF
WATER PIPE
CONN. TO TO DRAINAGE CATCH CLEAN-
WATER MAIN CANAL/SEWER BASIN OUT SOIL/WASTE PIPE
STORM
DRAINAGE PIPE
CORPORATION COCK
WATER MAIN
DRY VENT
WATER CLOSET
HOT WATER RETURN
FLOOR DRAIN
KITCHEN SINK
FIXTURES
NVPILAR 2008
PREPARATION OF PROGRAM OF WORKS
WF-1
VII. CARPENTRY WORKS 3.54 10,620.00
C1-F1
C1-F1
SLAB ON FILL
VIII. FAB. MATERIALS & HARDWARE 9.08 27,240.00
WF-1
WF-1
D-1 W-2
CLASSROOM WF-1 WF-1 IX. ROOF FRAMING WORKS 9.87 29610.00
CROSS SECTION C1-F1 C1-F1 C1-F1
X. ROOFING WORKS 7.20 21,600.00
FOUNDATION PLAN
XI. FINISHES 12.23 36,690.00
1 2 3
SCH. OF DOORS & WINDOWS XII. PAINTING WORKS 6.50 19,500.00
NVPILAR 2008
BUILDING CONSTRUCTION METHODOLOGY
( BY PERT/CPM DIAGRAM)
PROJECT: ONE(1) STOREY (7m X 7m) MODIFIED SCHOOL BUILDING
ELECTRICAL/SANITARY ROUGH-IN
J
16
14 INST. ELECT/
12 MECH/SANITARY
CARPENTRY WORKS FIXTURES
P S
2 1
1 2 6
MOVE- 4 17
IN
EARTH CONCRETE MASONRY 8 1O 13 15 MOVE
WORKS WORKS WORKS ROOF FRAMING ROOFING FINISHES PAINTING OUT
A B C F H M N Q T V
2 2 5 3 5 4 4 3 2
WAIT WAIT
WAIT WAIT WAIT
2 4
E G K O R U
1 2 2
SOIL BACKFILL INST. OF PURLINS INST. GUTTER & INST. FAB. MATLS &
HARDWARE
POISONING 5 WAIT
9
FLUSHING
3 11 14
I W
3
DAMPROOFING/SLAB ON FILL
7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
CALENDAR DAYS
LEGEND:
NETWORK - A B
ES LS EF LF
ACTIVITY -
EVENT - A
ES LS
DUMMY -
CRITICAL PATH -
NVPILAR 2008
AMOUNT CALENDAR DAYS
SCOPE OF WORKS WT.(%) (PHP) 5 10 15 20 25 30
I. MOBILIZATION/DEMOB 1.00 3,000.00
II. EARTHWORKS 2.29 6,870.00
III. SOIL POISONING 0.56 1,680.00
IV. DAMP PROOFING WORKS 0.47 1,410.00
V. CONCRETE WORKS 29.65 88,950.00
VI. MASONRY WORKS 3.21 9,630.00
VII. CARPENTRY WORKS 3.54 10,620.00
VIII. FAB. MATLS & H’WARE 9.08 10,620.00
IX. ROOF FRAMING WORKS 9.87 27,240.00
X. ROOFING WORKS 7.20 29,610.00
XI. FINISHES 12.23 21,600.00
XII. PAINTING WORKS 6.50 36,690.00
XIII. SANITARY WORKS 4.06 19,500.00
XIV. ELECTRICAL WORKS 5.34 16,020.00
XV. MECHANICAL WORKS 5.00 15,000.00
TOTAL 100.00 300,000.00
PROJECTED CASH FLOW (P)
PROJECTED ACCPLMENT (%)
CUMMULATIVE CASH FLOW(P)
CUMMULATIVE ACCPLMNT(%)
- CRITICAL ACTIVITY
- PARALLEL ACTIVITY
NVPILAR 2008
AMOUNT CALENDAR DAYS
SCOPE OF WORKS WT.(%) (PHP) 5 10 15 20 25 30
I. MOBILIZATION/DEMOB 1.00 3,000.00 1,500.00 1,500.00
II. EARTHWORKS 2.29 6,870.00 3,435.00 3,435.00
III. SOIL POISONING 0.56 1,680.00 1,680.00
IV. DAMP PROOFING WORKS 0.47 1,410.00 1,410.00
V. CONCRETE WORKS 29.65 88,950.00 11,118.75 44,475.00 33,356.25
VI. MASONRY WORKS 3.21 9,630.00 3,210.00 6,420.00
VII. CARPENTRY WORKS 3.54 10,620.00 10,620.00
VIII. FAB. MATLS & H’WARE 9.08 10,620.00 13,620.00 13,620.00
IX. ROOF FRAMING WORKS 9.87 27,240.00 17,766.00 11,844.00
X. ROOFING WORKS 7.20 29,610.00 16,200.00 5,400.00
XI. FINISHES 12.23 21,600.00 36,690.00
XII. PAINTING WORKS 6.50 36,690.00 19,500.00
XIII. SANITARY WORKS 4.06 19,500.00 676.67 3,383.33 3,383.33 3,383.33 1,353.34
XIV. ELECTRICAL WORKS 5.34 16,020.00 890.00 4,450.00 4,450.00 4,450.00 1,780.00
XV. MECHANICAL WORKS 5.00 15,000.00 833.33 4,166.67 4,166.67 4,166.67 1,666.66
TOTAL 100.00 300,000.00
PROJECTED CASH FLOW (P) 17,733.75 53,520.00 53,186.25 45,966.00 90,174.00 39,420.00
PROJECTED ACCPLMENT (%) 5.91 17.84 17.73 15.32 30.06 13.14
CUMMULATIVE CASH FLOW(P) 17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00
CUMMULATIVE ACCPLMNT(%) 5.91 23.75 41.48 56.80 86.86 100.00
NVPILAR 2008
AMOUNT CALENDAR DAYS
SCOPE OF WORKS WT.(%) (PHP) 5 10 15 20 25 30
100%
I. MOBILIZATION/DEMOB 1.00 3,000.00
II. EARTHWORKS 2.29 6,870.00
86.86
III. SOIL POISONING 0.56 1,680.00
IV. DAMP PROOFING WORKS 0.47 1,410.00
75%
V. CONCRETE WORKS 29.65 88,950.00 ACTUAL
ACCOMPLISHMENT
VI. MASONRY WORKS 3.21 9,630.00
VII. CARPENTRY WORKS 3.54 10,620.00
56.80
VIII. FAB. MATLS & H’WARE 9.08 10,620.00
50%
IX. ROOF FRAMING WORKS 9.87 27,240.00
X. ROOFING WORKS 7.20 29,610.00 TIME ELAPSED 41.48
XI. FINISHES 12.23 21,600.00 SCHEDULED
ACCOMPLIHMENT
XII. PAINTING WORKS 6.50 36,690.00
25%
XIII. SANITARY WORKS 4.06 19,500.00 23.75
XIV. ELECTRICAL WORKS 5.34 16,020.00
XV. MECHANICAL WORKS 5.00 15,000.00
5.91
TOTAL 100.00 300,000.00
PROJECTED CASH FLOW (P) 17,733.75 53,520.00 53,186.25 45,966.00 90,174.00 39,420.00
PROJECTED ACCPLMENT (%) 5.91 17.84 17.73 15.32 30.06 13.14
CUMMULATIVE CASH FLOW(P) 17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00
CUMMULATIVE ACCPLMNT(%) 5.91 23.75 41.48 56.80 86.86 100.00
NVPILAR 2008
TOTAL CALENDAR DAYS
MANPOWER RATE/DAY
AMOUNT 5 10 15 20 25 30
RES. ENGINEER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CONST. FOREMAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LEADMAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CARPENTER 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
MASON 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2
STEEL MAN 2 2 2 2 2 2 2
WELDER 2 2 2 2 2
TINSMITH 2 2 2 2
PAINTER 2 2 2
PLUMBER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ELECTRICIAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LABORER 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
SAFETY OFFICER
FIRST AIDER
NURSES
TOTAL 8 8 6 6 131313 1314 10 10 10 1616 101010 10 10 101012121212121210 8 6
NVPILAR 2008
TOTAL CALENDAR DAYS
EQUIPTMENT RATE/DAY
AMOUNT 5 10 15 20 25 30
MINOR TOOL ACC. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
C0NCRETE MIXER 1 1 1 1
BAR CUTTER 1 1 1 1 1 1 1 1 1 1 1 1 1
CONC. VIBRATOR 1 1 1 1 1
BAR BENDER 1 1 1 1 1 1 1 1 1
WELDING MACHINE 1 1 1 1 1
TOTAL
NVPILAR 2008
MANPOWER REQUIREMENT
NVPILAR 2008
NVPILAR 2008
PILE FOUNDATION DRILLING, DRIVING, BORING, GRABBING EQUIPMENT
SMALL DRILLING EQPT. DROP HAMMER DRIVING HEAVY BORING RIG W/ VIBRO HEAVY CABLE GRAB
USE FOR MICRO PILES RIG FOR PRE CAST PILES HAMMER FOR BORED PILES FOR BARRETTE PILES
WHEEL LOADER TANDEM W/ DUMP TRUCK -USE GENERATOR SET / WELDING MACHINE –
FOR HAULING & DISPOSAL OF DEBRIS AND USE AS CONNECTORS ON HEAVY
OTHER EXCAVATED MATERIALS. STRUCTURAL STEEL MEMBERS.
NVPILAR 2008
WHEEL LOADER TANDEM W/ DUMP TRUCK-USE
FOR HAULING & DISPOSAL OF DEBRIS AND
MOBILE CRANES – USE TO OTHER MATERIALS WITHIN THE PERIPHERAL
MANEUVER AROUND & OUTSIDE OF THE BUILDINGS
THE BUILDING TO HOIST
MATERIALS & EQUIPMENT FROM
VARIOUS LOCATIONS
NVPILAR 2008
WHEEL LOADER EXCAVATOR/BREAKER BULLDOZER GRADER
NVPILAR 2008
RING AND BAR BENDER
SAMPLING MOLD BAR CUTTER CONCRETE VIBRATOR
NVPILAR 2008
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
A. MOBILIZATION / DEMOB. 1% OF DC
B. EARTHWORKS
a) Excavation / Backfill -
b) Earth fill 30 %
c) Gravel 30 %
C. TERMITE CONTROL /
WOOD PRESERVATION
a) Soil Poisoning 30 %
b) Wood Preservation 30 %
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
D. FOUNDATION WORKS
1. SHALLOW FOUNDATION
a) Spread 30 %
b) Mat 30 %
c) Raft 30 %
2. DEEP FOUNDATION
a) Micro Piles 30 %
b) Pre-Cast Driven Piles 30 %
c) Bored Piles 30 %
d) Barrette Piles 30 %
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
E. DAMP PROOFING /
MOISTURE CONTROL
a) On Ground 30 %
b) Below Ground 30 %
F. CONCRETE WORKS
a) Concrete
a.1) Ready Mix 10 – 15 %
a.2) Job Mix 30 %
b) Re-bars 30 %
c) Formworks 30 %
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
H. CARPENTRY WORKS
a) Ceiling 30 %
b) Partitions 30 %
c) Wooden Framing 30 %
d) Stairs 30 %
e) Cabinets 30 %
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
H. FABRICATED MAT’LS
AND HARDWARES
a) Doors 30% Fab. + 10% Inst.
b) Windows 30% Fab. + 10% Inst.
c) Hardware Accessories 30%
I. ROOF FRAMING WORKS
1. Timber Trusses 30%
2. Steel Trusses
a) Fabrication 30%
b) Installation/Erection 20%
c) Equipment 10 - 25 %
d) Consumables 8%
e) Painting 7%
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
M. PAINTING / VARNISHING
a) Masonry Paint 30 %
b) Wooden Paint 30 %
c) Metal Paint 30 %
d) Varnishing 30 %
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
N. WATERPROOFING
a) Cement Base (Integral) 30 %
b) Membrane Waterproofing 30 %
c) Liquid Waterproofing 30 %
d) Hydrolithic Waterproofing 30 %
O. SANITARY WORKS
a) Plumbing Lines 30 %
b) Drainage, Waste & Vent 30 %
c) Fixtures & Accessories 15 %
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
P. ELECTRICAL WORKS
a) Wires & wiring 30 %
b) Conduit works 30 %
c) Panel boards & Cabinets 5%
d) Fixtures & Accessories 10 %
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
Q. MECHANICAL WORKS
a) Airconditioning & 10% - Labor(Acc.)
Refrigeration System 15% - Inst. of units
NVPILAR 2008
SCOPE OF WORKS IN BUILDING CONSTRUCTION
PART - A- MOBILIZATION
PART - B- EARTHWORKS
PART - C- TERMITE CONTROL & WOOD PRESERVATIONS
PART - D- FOUNDATION WORKS
PART - E- DAMP PROOFING / MOISTURE CONTROL
PART - F- CONCRETE WORKS
PART - G- MASONRY WORKS
PART - H- CARPENTRY WORKS
PART - I - FABRICATED MATERIALS AND HARDWARE
PART - J- ROOF FRAMING WORKS
PART - K- ROOFING WORKS
PART - L- FINISHES
PART - M - PAINTING / VARNISHING
PART - N- WATER PROOFING
PART - O- SANITARY WORKS
PART - P- ELECTRICAL WORKS
PART - Q- MECHANICAL WORKS
PART - R- CONSTRUCTION SAFETY AND HEALTH (DO. 56)
NVPILAR 2008
DPWH STD. SPECS., VOL. I, 1988, ED.
DPWH STD.SPECS.,VOL.II, 2004 ED.
DPWH STD.SPECS.,VOL.III, 1995 ED.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
PART A – MOBILIZATION
- M0VING IN OF MANPOWER, EQUIPTMENT & MATERIALS AT THE
PROJECT SITE
PART A – FACILITIES F0R THE ENGINEER
A.1.1- OFFICES & LABORATORIES - L.S.
A.1.2- VEHICLES FOR THE ENGINEER - MO./ EACH
A.1.3- ASSISTANCE TO THE ENGINEER - MONTHS
A.1.4- PHOTOGRAPHS - EACH
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
PART B - EARTHWORKS
ITEM 800 – CLEARING & GRUBBING - CU. M.
ITEM 801 – REMOVAL OF STRUCTURES & OBSTRUCTIONS - CU. M.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART D – FOUNDATION WORKS
ITEM 400(1) – UNTREATED TIMBER PILES, FURNISHED - METER
ITEM 400(2) – TREATED TIMBER PILES, PRESERVATIVE, FURNISHED - METER
ITEM 400(3) – STEEL H-PILES, FURNISHED - METER
ITEM 400(4) – PRECAST CONCRETE PILES, FURNISHED - METER
ITEM 400(5) – PRECAST, PRESTRESSED CONCRETE PILES, FURNISHED - METER
ITEM 400(6) – STRUCTURAL STEEL SHEET PILES, FURNISHED - METER
ITEM 400(7) – PRECAST CONCRETE SHEET PILES, FURNISHED - METER
ITEM 400(8) – UNTREATED TIMBER PILES, DRIVEN - METER
ITEM 400(9) – TREATED TIMBER PILES, DRIVEN - METER
ITEM 400(10) – STEEL H-PILES, DRIVEN - METER
ITEM 400(11) – STEEL PIPES PILES - METER
ITEM 400(12) – STRUCTURAL STEEL SHEET PILES, DRIVEN - METER
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2006
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
***- Such prices and payment shall be full compensation for furnishing all
materials, including metal water stops, joint fillers, weep holes, and rock
backing and timber bumpers; for all form and false work; for mixing, placing,
furnishing, and curing the concrete; and for all labor, materials, equipment, tools
and incidentals necessary to complete the item…
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART J – ROOF FRAMING WORKS
ITEM 402(1) – TIMBER STRUCTURES - SPAN
ITEM 402(2) – TIMBER TRUSSES - BD. FT.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART L - FINISHES
ITEM 1018 – CERAMIC TILES
ITEM 1018.2.1.1 – GLAZED TILES AND TRIMS - SQ.M.
ITEM 1018.2.1.2 – UNGLAZED TILES - SQ.M
ITEM 1019 – WOOD TILES
ITEM 1019(A) – NARRA WOOD TILES - SQ.M.
ITEM 1019(B) – TANGUILE WOOD TILES - SQ.M.
ITEM 1019(C) – OTHER SPECIES AS SPECIFIED - SQ.M.
ITEM 1020 – VINYL FLOOR TILES - SQ.M. OR L.M OR # OF PCS.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2006
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART P – ELECTRICAL WORKS
ITEM 1100 – CONDUITS, FOXES & FITTINGS
(1)-RSC CONDUIT PIPE- MM DIA W/ COUPLING - LENGTH
(2)-LOCKNUT & BUSHING - PAIRS
(3)-CONDULET TYPE - PIECES
(4)-CONDUIT PIPE ELBOW - PIECES
(5)-CONNECTOR - PIECES
(6)-CONDUIT CLAMP - PIECES
(7)-PVC ADAPTER - PIECES
(8)-G.I. WIRE G.A. #14 - KILOS
(9)-HACKSAW BLADE - PIECES
(10)-PVC TAPE 19MM DIA X 18MM - ROLLS
(11)-RUBBER TAPE 19MM DIA X 227G - ROLLS
(12)-PVC SOLVENT CEMENT @ 400 CC. - CANS
(13)-PVC END BALL - PIECES
(14)-OCTAGONAL JUNCTION BOX - PIECES
(15)-UTILITY BOXES - PIECES
(16)-METAL PULL BOX - PIECES
(17)-SQUARE BOX - PIECES
(18)-TELEPHONE CABINET - SET
(19)-REINFORCED CONCRETE PEDESTAL POLE - LOT
(20)-RED LEAD PAINT - LOT
(21)-WEATHER HEAD W/ TYPE F CONDULET - PIECES
(22)-GROUNDING ROD COPPERWELD 20MM DIA. X 3.00M -LENGTH
(23)-APITONG OR APPROVED EQUAL CRESOTED WOOD POLE - PIECES
(24)-ANCHOR ROD__ MM DIA - PIECES
(25)-ANCHOR LOG__ MM DIA - PIECES
(26)-POWERLOAD STUDS WITH NUTS - PIECES
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1205 – OXYGEN, NITROUS OXIDE, VACUUM & FUEL GAS SYSTEM
(A)- OXYGEN, NITROUS OXIDE, GAS MANIFOLD AND
DUPLEX VACUUM PUMP - SET
(B)- HUMIDIFIER, VACUUM TRAP BOTTLE, OUTLETS, VALVES - PIECE
(C)- PIPES AND TUBINGS -
LENGHT
ITEM 1206 – HEATING SYSTEM
(A)- BOILERS, FUEL PUMP, STORAGE TANKS AND FUEL DAY TANK
INCLUDING FOUNDATION - SET
(B)- PIPES - LENGTH
(C)- VALVES AND FITTINGS - PIECES
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2008
NVPILAR 2008