PriMove Infrastructure Development consultants Pvt. Ltd. is a consulting company
working in the field of development planning, rural and urban infrastructure development
and capacity building. The promoters have been working in water sector since 1991.
PriMove‟s motif is engineering growth for facilitating sustainable development. Our vision
is to be First choice of clients, partners and professionals in the Infrastructure sector.
End to end services for water projects is our specialization. Based at Pune in
Maharashtra state of India, the organization has been promoted and managed by
professionals to provide support services to the Government, Multilateral and bilateral
agencies, NGOs, Corporate, Urban Local Bodies (Municipal Governments) and Rural Local
Bodies. It has provided services in Maharashtra, other states of India and also
internationally. PriMove has also worked in African countries. We have provide services
for water sector projects to cities with current population ranging from 3.5 million to
small rural habitations with population of few thousands. We have also provided services
to the regional water supply schemes covering multiple rural and urban habitations.
PriMove provides services in the field of Water Supply, Sewage, Storm Water
Management, Environmental Sanitation, Master plan, Water Resource Development &
Management and Rural Development.
PriMove provide technical services for preparation of Detailed Project Reports and Project
Management services for both rural and urban infrastructure development projects.
PriMove services also include appraisals, project design, development of capacity
building and project implementation strategies, delivery of capacity building components
through training of trainers, development of tools, process design; management and
monitoring systems, project evaluations and development of knowledge products.
Environmentally responsible and socio economically viable project design and
implementation management is the core strength of PriMove team. We have robust and
intensive experience of operationalizing demand led water & sanitation projects in rural
areas based on firm foundation of participatory approach involving multiple stakeholders
ranging from local women groups in the villages to the highest level decision makers at
program and policy level.
We have been closely working with Irrigation, Water Supply, Sanitation, Rural
development department of various governments at policy, program and project level.
We also partner with agencies like UNICEF, the World Bank, GIZ, Plan India for
implementing various water sector projects.
PriMove has a multidisciplinary team of professionals who on one hand has strong
technical capabilities, robust cutting edge level experience and on the other have
insights into program and policy development. The group members are from various
disciplines like civil engineering, electro mechanical engineering, environmental
engineering and hydrogeology, project management, development planning, sanitation,
water quality, geology, agriculture economics, information technology, sociology,
geographical information system, institution development and capacity building. The
team members have worked at various levels in their sectors and have contributed from
policy level to the project implementation level. We also have a well-trained support staff
for field investigations and piloting of tools.
In last two years water infra projects worth around 400 million USD designed by PriMove
have been approved and are under implementation. Primove team has developed a
protocol for Water use efficiency in urban & rural water supply schemes of various sizes
& also specializes in providing assistance in converting intermittent water supply to
continuous (24X7).
Sectors
Water
Rainwater Harvesting:
Sewage
Roads
Renewable Energy
Services
Master Planning
PriMove provides services for developing master plans for basic infrastructure in urban
and rural areas. The range of service varies from basin wise master plan for Water, to
infrastructure master plans for private industrial and residential townships. Our ability
and experience of working at both national policy level and grass root levels gives us a
unique perspective to provide complete solution to our clients.
Indicative list of projects
Preparing for a Master Plan for Integrated Development and Management of
Resources of Terna, Lendi and Manar sub-basins of river Godavari in Maharashtra
– India
Providing flood management consultancy for proposed special Township and SEZ
project for Lodha Developers at - Dombivali and Pune - India
Providing storm water and flood management consultancy for proposed special
Township project at Ghesar, Mumbai for Lodha Group – India
Consultancy services for Infrastructure Development of Engineering SEZ project
in KhandalaTaluka, DisrictSatara, Maharashtra – India
Providing RCC design of well and pump house including evaluation of options for
various construction methods to overcome current problems at site for Khed SEZ
2 MLD scheme for Kalyani Global ltd, Pune – India
Feasibility Study and report for water master plan for Capricon Developers at
Mulshi, Pune –India
Environmental Development Plan for village Ghulewadi & Uchgaon for
Maharashtra Pollution Control Board.
Preparation of Environmental Development Plan for a clusterof villages
BaramatiTaluka – Malegaon BK, Wadgaon, Nira&Walha).
Supported by a large pool of experts, PriMove provides services for developing detailed
project reports for water infrastructure projects. The services include population
projections, topographical and geotechnical surveys, detailed designs and hydrolic
modelling, quantity survey, estimations, developing project reports to seek finance,
pretender activities as well as detailed engineering and construction level detailing to
help effective execution.
Indicative list of projects
Preparation of DPR Preparation of DPR for Water supply scheme of Chandrapur
Municipal Council – India
Planning and designing of Watersheds and storm water management system for
Pune City- India
Preparation of detailed Project Reports (DPR) for Storm Water Project Phase-I in
Pune Municipal Corporation area for IL&FS – India
Preparation of detailed Project Reports (DPR) for Storm Water Project Phase-II for
Pune Municipal Corporation under JNNURM (Govt. of India)
Preparation of DPR for collection and 100 % treatment of sewerage of Pune City-
under NRCD – for MJP - India
Preparation of DPR and storm water system in Kolhapur Municipal Corporation ,
Maharashtra – India
Preparation of DPR for in storm water system Mira Bhyander Municipal
Corporation, Mumbai – India
Preparation of DPR for sewerage system in Chandrapur Municipal Council – India
Preparation of Detailed Project Report for Sewerage system in Shegaon City,
Maharashtra, India
Feasibility & Design services for providing storm water drainage arrangement
from Diva village in Thane City
Consultancy Services for preparation of Feasibility Study and Detailed Project
Report of Access Controlled Nagpur-Mumbai Super Communication Expressway.
Package-I - Nagpur Revenue Division.
Project Management Services
PriMove provides Project Management on infrastructure projects. Out team ensure that
projects are executed as per milestones with proper quality checks in place. The service
includes construction quality management, time and cost management, measurements
and records along with reporting as per client and project needs.
PriMove has managed implementation of water supply, storm water, sewerage and
sanitation, highways, tunnels, and urban road projects
PriMove provides capacity building services to strengthen the abilities of individuals and
organizations to effectively perform their tasks. We provide services to develop capacity
building strategy and action plans, tailor made for specific projects and organizations.
We undertake training needs assessment, design and deliver trainings, develop systems
and tools for project implementation and also provide hand holding support.
Indicative list of projects
Support agency for capacity building of local government staff, NGOs for village
water safety and security supported by UNICEF in Maharashtra India.
Capacity building support to Implement Reforms in Rural Water Supply and
Sanitation Sector in Nanded and Raigad districts of Maharashtra under Water
Sector Reforms Program of Government of India
Capacity Building Support to all stakeholders under the World Bank aided Water
supply & sanitation project - Jalswarajya- in Nashik, Sangli and Buldhana
districts of Maharashtra – India
Participatory Rural Appraisal TOT for Ground water Surveys and Development
Agency (GSDA) of Govt. of Maharashtra
Participatory Rural Appraisal TOT for Maharashtra Water Supply and Sewerage
Board renamed as MJP – India
Engaging Resource Agencies to assist in promoting Community Led Total
Sanitation (CLTS)The World Bank Sanitation Program in South Asia
Development &Testing of Modules for Training of Trainers and Capacity Building
Managers under public programme for watershed management in India for GTZ,
New Delhi – India
Implementation of Village Water Safety & security program under Watson
component - NTPC WATSON
Evaluation, Monitoring
PriMove provides evaluation and monitoring services for various development projects.
Based on the evaluations and monitoring, we develop knowledge products to inform
policy and project development. Development of participatory monitoring and evaluation
systems for development projects is one of the strong areas of PriMove
PriMove provides services to assess the impact of the development projects, identify the
project affected persons and develop rehabilitation action plans to mitigate the adverse
impacts and enhance the positive impacts of the project. We adopt participatory process
to develop the action plans in the framework of the relevant R&R policies and guidelines.
Indicative list of projects
Developing rehabilitation action plan/ community development Plan for affected
villages of Mouda Thermal Power Plant for National Thermal Power Corporation (
NTPC ) near Nagpur – India
Socio-Economic survey of project affected village under Birsi–Gondia District for
Airport Authority of India
Social Assessment & Resettlement Action Plan for Andhra Pradesh/ Karnataka –
Avathi village (NH-7) Road Project –for Sheladia Associates – India
Socio Economic Survey (SES) Stage-II, NTPC Mouda
Our Clients
Government of India
Government of Maharashtra
Government of Gujarat
Government of Punjab
Ministry of Urban Development (Public Health Department)
Rural and Urban local government agencies in India
Pune Municipal Corporation
Mira Bhyander Municipal Corporation,
Mumbai Metropolitan Regional Development Authority (MMRDA)
Chandrapur Municipal Corporation
Nanded Municipal Corporation
Kolhapur Municipal Corporation
Sangli Municipal Corporation
Thane Municipal Corporation
Solapur Municipal Corporation
Osmanabad Municipal Council
Navi Mumbai Municipal Corporation
Karad Municipal Council
Vadgaon Municipal Council
Pimpri Chinchwad New Town Development Authority, Pune
Maharashtra Agricultural Competitiveness Project (MACP), Pune
UNICEF
KFW
The World Bank
German Technical co-operation (GTZ), Germany, formerly Known as GIZ
Agricultural Finance Corporation Ltd.
Power Finance Corporation Ltd.
Local and International NGOs
Tamilnadu Water Investment Co. Ltd, India
Corporate in India
Infrastructure Leasing & Finance Services (IL & FS) India
Government of Lesotho
Department for International Development (DFID), UK
OXFAM GB
Defence Research Development Organisation (DRDO), Pune
National Thermal Power Corportion (NTPC) of India
Sir Ratan Tata Trust (SRTT)
Our Empanelment’s
Electronics Engineers
Expert in Water Management,
3 Neelesh Kulkarni BE (Ele.) 25 years
Capacity Building and natural
resource management
ME
Water and sewerage network
9 Sunil Pote (Environmental 20 years
modelling expert
Engg)
Expert in surveying of
17 K D Karhale D.C.E. watershed, roads, water 18 years
supply and drainage systems.
26 Gitan Bhojane Dip Auto Cad Auto CAD and GIS software 02 years
Expert in Community
31 Gajanan Aspat MSW 10 years
development
Technical Staff
Name of the Area of
No Qualification Experience
Staff Expertise
Expert in water resource
32 Ramesh Petkar D.C.E 09 years
management
Expert in Community
33 Sachin Hattalge MSW 08 years
Mobilisation
Dr. Manohar Expert in Agronomy, Research
34 M. Sc. Agri Ph.D 45 years
Sawant & Capacity Building
Hardware:
Software
o Arc GIS
o Arc View
o Bentley Sewer Gems
o Bentley Water Gems
o AutoCAD Civil-3D (for contouring)
o Auto plotter for L-Section & Cross Section
o AutoCAD Map
o Adobe Photoshop
Output Formats
o ESRI
o Bentley
o Autodesk
PriMove is governed by board of directors. It operates through three division‟s namely technical services division, development planning
division and capacity building division.
Along with the in house teams there is also a roster of professionals who have been working on various projects with PriMove. These are
senior level experts with specific specialization as required for the range of projects undertaken by PriMove.
The divisions are supported by Admin- HR, finance and business development teams.
BOD
Roaster of Consultants
Division Building planning
Division Division
Project Support
Project Project PM PM
Manager Services
Manager Manager Development Support
Design DPR PMC Training
Planning Services
Multidisciplinary Project Team Comprising Team Leader, Team Members and Assistants
Integration of local / National teams
Selected Relevant Assignments
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
1. Preparation and Pune 3rd & 4th NA Aug Ongoing Ongoing Formulation of strategies for vision for the
Implementation Metropolitan Floor, preparation & implementation of Town
of Town Region Maharaja 2017 Planning Scheme/s
Planning Development Sayajirao To update the data regarding Revenue
Scheme/s (TPS) Authority Gaikwad Records such as details of Land
as per (PMRDA) Udyog Bhavan, Ownership, area and tenure of each
Maharashtra Aundh, Pune, Original Plot available with the PMRDA.
Regional & Town Maharashtra
Planning Act, To collect irrevocable consents of land
1966 owners aggregating contiguous land area
8. Preparation of Chandrapur Chandrapur 143.86 Cr Nov Aug Aug Preparation of DPR including detailed
DPR for the water Municipal Municipal Council,(CP) design, GIS base data, technical
supply system of Council, India Maharashtra 2007 2008 2008 specifications, bill of quantities, rate
Chandrapur city, India analysis and cost estimates, Preparation
Maharashtra, of bid document, support for evaluation of
India bids, Project management services during
execution including project scheduling,
quality management, bill certification and
on the site technical support.
Project of 60 MLD capacity consisted of
raw water intake, pumps, conveyance by
900 mm pipes, 60 MLD WTP, 110 HP
pumps for treated water, 8 nos. ESRs of
1.65 to 4 ML capacity, Distribution
network of 100 to 600 mm, 14.22 Km
length.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
9. Improvement to Studio Galli Studio Galli 522 Cr (CP) Dec Nov Nov Pune city has a population of 3.5 million.
water supply to Ingeneria (SGI) Ingeneria The work completed till date includes
Pune city (SGI) 2011 2012 2012 following-
Shivajinagar, survey of 5000 domestic and commercial
Pune consumer connections,
GIS based updation of entire water
network and assets which included
procurement of satellite image,
digitization & network updation for 2450
Kms of distribution, 400 Kms of
transmission system,7 WTPs,
Service Reservoirs.
Actual implementation in 5 Pilot DMA
Population projection up to 2047
Hydraulic modeling of the entire network
using Water Gems and EPANET softwares
for existing and projected population
Development of DMA based management
system
Metering from source to consumer with
pressure and level transducers and AMR
consumer meters to make the system
amenable for continuous water audit.
SCADA system for Monitoring and
controlling
Community Awareness
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
10. Third Party Navi Mumbai 300 Cr (CP) Mar Mar Mar Independent third party verification of
C.B.D.
Technical Audit Municipal implementation of quality assurance
Belapur, Navi
for Buildings, Corporation 2012 2014 2014 manual, extent of controls exercised by
Mumbai
Water Supply, contractors and supervisory
Sewerage in staff/technique. Third party verification on
public health AMR metering and water scheme works of
engineering the Navi Mumbai, a town of 2 Million
department population
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
11. Augmentation and Crisil Risk & Crisil House, 5.2 Lakh (CF) Sept Dec Dec Primary and Secondary data collection on
improvement in Infrastructure Central existing situation of water supply in the
Distribution Solutions ltd Avenue, 2013 2013 2013 LMC and assessing the impact of the
system for 24X7 Hiranandani proposed project.
Supply and Business Park, Consultations with stakeholders viz. LMC
Reduction of Pawai, Mumbai (its various departments), Maharashtra
Non-revenue Urban Development Department,
Water through prominent Civil society/ NGOs active in
100% Metering urban infrastructure including potential
and Operation & developers etc
Maintenance of Review of project including the
Water Supply assessment of present water conditions to
System for develop: a. base case project costs for
Lonavala City capital investment, b. timelines for
(Maharashtra) on implementation and operation. C. inputs
PPP Modality for operation and maintenance costs over
the life of the project
Value for Money (VFM) Analysis.
Development of Financial plan, Financial
Model, Economic model, Customer
Service framework.
Recommended PPP option, Market
Consultation exercise & Request for
qualification documents
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
12. Preparation of JSW ISPAT JSW 68.95 Lakh May June June Preparation of DPR including detailed
Detailed Steel Limited ISPAT STEEL (CP) design, Geographic Survey, bill of
Engineering and LTD, Dolvi, 2013 2013 2013 quantities, rate analysis and cost
route finalization, Pen, Raigad, estimates, Preparation of bid document,
pipe selection and Maharashtra support evaluation of bids, Project
survey for water management services during execution
supply pipeline including project scheduling, quality
From Nagaothane management, bill certification and on the
to JSW ISPAT, site technical support
Dolvi & Hetwane
To JSW ISPAT,
Dolvi
13. Reform Work Infraplan 109, Raoji 53.55 Lakh June Dec Dec Carrying out consumer survey to collect
under Sujal Engineering Complex, (CP & CF) details of consumption of water usage,
Nirmal Abhiyan Services Pvt. Shahupuri, 2012 2013 2013 fixing of EMF, US, and mechanical meters
for Indapur Ltd. First lane, for carrying out water audit by studying
NagarPalika , Kolhapur – the losses in DMA‟s. Supply and
Pune Dist. 416001, Installation of International standard
Maharashtra software for single user for Hydraulic
designing and modeling, Modeling and
calibration of Hydraulic model of existing
and proposed water supply scheme.
Comprehensive Maintance of flow meters
for one year. Supply and installation of
GIS software, procurement of quick bird.
Digitization of satellite image, Asset
mapping, physical survey and contour
mapping of the town. Providing and
installing computer etc.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
14. Water Audit, Vadgaon, 52 Lakh June March March Carrying out consumer survey to collect
Vadgaon
Energy Audit Municipal (CP & CF) details of consumption of water usage,
Municipal
Hydraulic Council 2012 2014 2014 fixing of EMF, US, and mechanical meters
Council, Dist:
modeling in the for carrying out water audit by studying
Kolhapur
Reform Work the losses in DMA‟s. Supply and
under Sujal Installation of International standard
Nirmal Abhiyan software for single user for Hydraulic
for Vadagaon designing and modeling, Modeling and
Municipal Council, calibration of Hydraulic model of existing
Kolhapur Dist., and proposed water supply scheme.
Maharashtra, Comprehensive Maintenance of flow
India. meters for one year. Supply and
installation of GIS software, procurement
of quick bird. Digitization of satellite
image, Asset mapping, physical survey
and contour mapping of the town.
Providing and installing computer etc.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
15. Preparation of Pune Municipal Pune Municipal 461.73 Cr April Ongoing Mar Pretender Activities:
DPR and PMC for Corporation Corporation, Carrying out reconnaissance survey,
Storm water ShivajiNagar, (CP) 2013 2016 topographic surveys of Nallas & Road side
drainage master Pune drainages, cross drainages, calves in
plan of Pune selected basins under the project.
Under Preparation of Hydraulic designs of storm
JNNURM Phase-II water drains as per CPHEEO manual
norms.
Follow up and obtaining approval from
PMC, Govt of Maharashtra, Govt of India
& other funding agencies.
Preparation of Tender documents, B.O.Q
and specifications of items to be
executed.
Post-Tender Activities:
Monitor the progress of project and
prepare various reports such as monthly
progress report, quarterly progress
reports etc & submit to PMC & funding
agency.
Supervision and quality monitoring during
execution of works.
Certification of quantities of executed
works and bills of contractors on behalf of
P.M.C.
Co-ordination between contractor and
Pune Municipal Corporation.
All other works and activities required for
the progress of the project.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
16. Preparation of Tamil Nadu IL&FS Ltd. Bandra 399 Cr (CP) Nov Apr April Developing a detailed project report for
DPR and Pre- Water Kurla Complex , execution of storm water drainage project
Mumbai
tender activities Investment 2007 2008 2008 for Pune City (3.7 Million populations) –
for Storm water Company Ltd. with an area of 300 sq. km. Preparation
drainage master (TWIC) which is of detailed drawings, designs, GIS base
plan of Pune a group data, estimates, tender documents and
Under JNNURM company of follow up with JNNURM for funding.
Infrastructure
Leasing &
Financial
Services Ltd.
(IL& FS)
17. Feasibility & Thane Municipal Thane 47.94 Cr (CP) Feb Sept. Sept. Preparing alternative augmentation
Design services Corporation. Municipal schemes and checking their feasibility.
for providing Corporation. 2011 2012 2012 Carrying out Cost/Benefit analysis of
storm water Mahanagarpali various schemes.
drainage ka Bhava, Recommending Best Suited Scheme to
arrangement for Dr.Almeda Thane Municipal Corporation for approval.
Diva village in Road, Detail Report on the rehabilitation of
Thane City Panchpakhadi, people residing nearby Natural drain area.
Thane – 400 Preparing detailed hydraulic designs of
602. the augmentation scheme.
Finalizing formation levels of the road and
nearby developing properties.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
18. Preparation of Mira Bhayandar Mira Bhayandar 220 Cr (CP) June July July Developing a detailed project report for
DPR and Pre- Municipal Municipal execution of storm water drainage project
tender activities Corporation Corporation 2007 2009 2009 for Mira Bhayandar City (0.8 Million
for Storm water population) – with an area of 79.4 sqkm.
drainage master Preparation of detailed drawings, designs,
plan Under GIS base data, estimates, and tender
JNNURM for Mira documents and follow up with JNNURM for
Bhanyandar funding.
Under MMRDA
19. Preparation of Kolhapur Kolhapur 200 Cr (CP) Dec March March Developing a detailed project report for
DPR for Strom Municipal Municipal execution of storm water drainage project
Water Corporation, Corporation, 2009 2013 2013 for Kolhapur City (0.5 Million population).
Management Kolhapur Kolhapur Preparation of detailed drawings, designs,
System in GIS base data, estimates, tender
Kolhapur City documents and follow up for funding.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
20. Preparation of Sangli Municipal 198.56 Cr Mar March March Developing a detailed project report for
Sangli
DPR and Strom Corporation, (CP) execution of storm water drainage project
Municipal
Water Sangli 2011 2013 2013 for Sangli City. Preparation of detailed
Corporation,
Management drawings, designs, GIS base data,
Sangli
System in Sangli, estimates, tender documents and follow
Miraj and Kupwad up for funding.
City Municipal
Corporation
21. Project Pune Municipal Pune Municipal 54.43 Cr (CP) Aug June June Project Management Consultancy for
Management corporation, corporation, Infrastructure Projects under JNNURM in
Consultancy for Pune Pune 2010 2013 2013 Pune – Basin (M). Includes post tender
Storm Water activity – keeping upto date record of
Drainage Project, measurements required for billing,
Basin (M) – preparation and checking, carrying all
Wadgaon Seri for necessary quality checks as per tender
Pune City under specifications. Project management for
JNNURM storm water drainage system, preparation
of GIS base data. Submission of work
completion report, records and drawings
etc.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
22. Preparation of Pimpri Pimpri 26.70 Cr (CP) July Nov Nov Includes design pre-tender and project
DPR for Storm Chinchwad Chinchwad management for storm water drainage
Water, landscape, New Town New Township 2008 2011 2011 system and landscape development
beautification of Development Development including bridges, lake development,
nallas system in Authority, Pune Authority theme parks, water supply system etc.
PCNTDA AREA. (PCNTDA)
Nigadi
Pune 411 044
23. Rain Water Shirine Garden Shirine Garden 12 Lakhs May Aug Aug Roof Top Rain Water Harvesting
Harvesting at Co-operative Society, (CP) Existing Borewell flashing
Shirine Garden Housing Society Aundh, Pune 2013 2013 2013 Construction of Recharge pit.
Society Rain Water Piping works
(Trunkey Project)
24. Rain Water Fortress Fortress 75 Lakhs June June June Water Shed Management
Harvesting & Infrastructure Infrastructure (CP) Construction of CCT, Loose bolders,
Water shed Advisory Advisory 2012 2014 2014 Cement bunds, KT Wier, FSC &
Management at Services Services, construction of wells.
Sun Vally, At. Marine line Digging of borewells & Construction of
Jambhulpada, Mumbai Recharge pit
Tal: Pen Dist:
Raigad
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
25. Consultancy For Chief Engineer, HQ Chief 10 Cr (CP) Oct Mar Mar DPR for collection and treatment of
Central Sewage Military Engineer sewerage of Military Station Luchibari,
Treatment Engineering Shillong Zone 2015 2016 2016 Jorhat, Assam & Leimakhong (Pocket-1),
Plant(STP) at GE Services. Spread Eagle Manipur. Design of sewerage collecting
(Jorhat) And GE Falls mains throughout the area. The work
869 EWS Shillong- consists of 8km & 5km of collection
(Leimakhong) 793011 system of variable diameter. Design and
Under Chief detailing of 2 STPs of 0.5 MLD capacities
Engineer Shillong with different technology like MMBR, MBR,
FBBR etc.
27. Preparation of Maharashtra 674 Cr (CP) Oct March March Collection of 100% sewerage of Pune city
Maharashtra
DPR for collection Jeevan and treatment of it. Augmentation of
Jeevan
and treatment of Pradhikaran 2010 2013 2013 existing STPs and intermediate Pumping
Pradhikaran
sewerage of Pune Development stations. Design of sewerage collecting
Development
City Division, Pune mains throughout the Pune city and
Division, Pune-
collection system of Baner and Balewadi.
411001
The work consist of 113.5 Km of collection
system of dia 450 to 1800 mm. design
and detailing of 9 STPs ranging from 8
MLD to 125 MLD with different technology
like ASP, Modified ASP, Extended
aeration, SBR MMBR, MBR etc.
DPR submitted to Government of India for
financing under NRCP
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
28. Preparation of Alandi Municipal Alandi 122 Cr (CP) Sept Jan Jan Carrying out reconnaissance survey,
DPR for Pollution Council Municipal topographic surveys of project area and
Abetment of Council, 2014 2015 2015 River, Natural drains etc.
Indrayani River at Alandi, Tal- Preparation of feasibility report for
Alandi under Khed, Sewerage scheme, Solid waste
NRCP Dist - Pune management, Community sanitation,
River front Development and other allied
works under the guidelines of NRCP
Preparation of Hydraulic designs of
sewage collection network as per CPHEEO
manual norms by use of SewerGEMS,
Preparation detailed design of Solid Waste
Management in the project area as per
CPHEEO manual norms and preparation of
detailed conceptual plan and drawings of
the River front development and allied
works
Preparation of detailed cost estimates and
BOQ as per latest CSR
Submission & sanctioning of DPR from
Alandi Municipal council, State level nodal
agency, State Government & Central
Government
To take the technical sanctioning of the
DPR from the concerned authority
Follow up and obtaining approval from
AMC, Government of Maharashtra,
Government of India & other funding
agencies
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
29. Geotechnical NJS Consultants 6-8, Tomihisa- 674 Cr (CP) Sept Nov Nov Under this assignment, the topographic
Survey, Social Co., Ltd., cho, Shinjuku- survey & Geotechnical Investigations
Condition Survey, Tokyo, Japan & ku, Tokyo 162- 2014 2014 2014 including sample testing are carried out at
Meteorological & 0067, JAPAN, proposed STP sites (8Nos). The route
Hydrological Nippon Koei and survey of proposed collection network
Survey, Social CO., Ltd., 4, Kojimachi, (43km) sewer lines, trunk sewers (73
Survey, Tokyo, Japan 5-chome, Km) and approach road of proposed STP
Topographic Chiyoda-ku, is confirmed on site. The opinion of the
Survey, Route Tokyo 102- local people is studied under social survey
Inspection Survey 8539, Japan including House hold survey, group
for the discussion etc.
preparatory Meteorological (Rainfall & wind) and
survey on Project hydrological data (Flood line data of River
for “Pollution Mula Mutha) is collected from respective
Abatement of Government departments.
River Mula-Mutha
In Pune”
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
30. Detailed Project Khed Economic Pride Parmar 6.37 Cr (CP) Sept Nov Nov Collect & review of available data.
Report for Infrastructure Galaxy First Details of type industry Location, type of
Sewerage Pvt Ltd, Pune Floor, CTS no 2014 2014 2014 waste.
Collection and 10,10A,Behind Sewage chemical report and analysis.
Treatment system Parmar Trade Residential population and projected
in Domestic Tariff Centre population forecast .
Area ( DTA ) of ,Cannought Projected year and water supply.
Khed city Taluka road Pune Sewerage line alignment.
– Khed Dist - 411001 Sewage treatment plant design and
Pune layout.
Detail Project report.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
31. Preparation of Pune Municipal Pune Municipal 232 Cr (CP) Sept July July Prevent untreated sewage from entering
Master Plan & Corporation, Corporation, natural water bodies such as Nallas and
DPR for sewerage Pune ShivajiNagar, 2008 2009 2009 rivers etc. Augment the collection system
System of Pune Pune of sewage to tap and transport all the
City. sewage generated in the city.
Augment existing sewage treatment
facilities and construct new sewage
treatment facilities to treat all the sewage
generated in the city.
Use of technologies that will efficiently
treat the sewage to achieve required
effluent haracteristics
Preparation of master plan of sewerage
system for pune city.
Preparation of detailed project report for
sewage system phase II for submission of
JNNURM, consisting design of STPS and
pumping stations.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
32. Preparation of Chandrapur Chandrapur 96.16 Cr (CP) Jan Mar Mar Preparation of DPR including detailed
master plan and Municipal Municipal design, technical specifications, GIS base
DPR for the Council Council 2007 2007 2007 data, bill of quantities, rate analysis and
sewerage system cost estimates, Preparation of bid
of Chandrapur document, support for evaluation of bids,
city Project management services during
(Area 56.4 sq. execution including project scheduling,
KM) quality management, bill certification and
on the site technical support. The project
consisted of sewer system 179 Km of
diameters ranging from 150 to 1200 mm.
Two STPs of 25 and 45 MLD capacity
33. Preparation of Fortress Fortress 46.29 Cr (CP) April June June Preparation of DPR including conducting
Detailed Project Infrastructure Infrastructure topographic and detailed engineering
Report for Advisory Advisory 2010 2010 2010 survey, zone finalization, preparation of
Sewerage system Services Services for design, drawings, feasibility study, rate
in Shegaon City, Shegaon analysis and cost estimation and
Maharashtra, Tirthkshetra specification of various infrastructural
India Development services. Preparation of Tender document,
Plan. Shegaon, evaluation of tenders. Present technical
Maharashtra, aspect of the project, approval of project/
sanctioning of grant etc. Project
management services during execution
including supervision of works. Post
tender activities. The project consist of
61.42 Km of sewers from 150 to 700 mm
dia., STP of capacity 9.67 MLD
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
34. Project Karad Municipal Karad 43.22 Cr (CP) Oct Ongoing May Preparation of tender documents and
Management Council Municipal evaluation of tenders received.
Consultancy for Council, Karad, 2012 2015 Finalization of contractor, award of work
Underground Dist. Satara, to the selected contractor after approval
Drainage System Maharashtra from Council. Site supervision, checking
in Karad under layouts and working drawings, quality
Maharashtra control, scrutinize and certify ongoing
Nagarotthan work and certification of bills of
Maha abhiyan contractor. Preparation of project
Project completion report, compilation of as built
drawings and technical data.
35. Project Malkapur Nagar Malkapur 40.97 Cr (CP) Mar Ongoing Feb Preparation of tender documents and
Management Panchayat Nagar evaluation of tenders received.
Consultant for Panchayat, 2014 2016 Finalization of contractor, award of work
Underground Malkapur, Tk: to the selected contractor after approval
Drainage System Karad, Dist: from Council. Site supervision, checking
in Malkapur Nagar Satara layouts and working drawings, quality
Panchayat under control, scrutinize and certify ongoing
UIDSSMT work and certification of bills of
contractor. Preparation of project
completion report, compilation of as built
drawings and technical data.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
36. Designing Defence R & D Defence R & D 1 Lakh (CF) March July July Design of 0.20 MLD capacities Sewerage
Sewerage Org. (DRDO), Org. (DRDO), Treatment Plant with connected civil
Treatment Plant GoI, Post Box 2008 2008 2008 works. Conducting study of various STP
of 0.20 MLD No. 1, and preparation of preliminary scheme.
capacity with Armament Finalization of details with CCE (R & D),
connected civil Post, Pashan, West, Pune. Development of approved
works services at Pune – 411 scheme and submission of tender
Defence R & D 021 documents. Preparation of detailed
Org. (DRDO), technical specifications for the work.
Pune Approval of design.
37. Preparation of Rural Water Zilla Parishad 139.94 Cr Jan Dec Dec Preliminary visit
DPR for Liquid Supply Division, Kolhapur, (CP) Categorization of villages – Villages
and Solid waste Zilla Parishad, Nagala 2013 2013 2013 polluting the river/ villages not polluting
Management in Kolhapur Park,Kolhapur the river
39 Villages and Flow measurement at all the outfalls
Prefeasibility Sewage Sample Testing from Laboratory
Report for 135 Land requirement assessment for solid
villages in and liquid waste treatment plants
Panchganga River Suggesting proper technology for liquid
basin Causing and solid waste management
pollution Topographical survey
Preparing detailed project report
Assistance to Kolhapur Zilla Parishad in
sourcing funds for the project
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
38. Carrying out Various Various NA April May May Carrying out various Road surveys using
various Road Employers (i.e. Employers (i.e. Unmanned Aerial Vehicles (UAV/Drones).
Surveys using MSRDC, MSRDC, 2016 2016 2016 Data collection using high definition
Unmanned Aerial AECOM, AECOM, imaginary.
Vehicles Eurostudios, Eurostudios, Data processing using high end software‟s
(UAV/Drones) Mechafree etc) Mechafree etc) & generation of desired digital elevation
models.
Total Length Creation of 2D, 3D & contour data.
surveyed: More Carrying out surveys in inaccessible areas
than 100 Kms. like. Tunnel, Mountainous areas.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
39. Consultancy Maharashtra Maharashtra NA April Dec Dec Fixing of alignment and its approval.
Services for State Road State Road Aerial Survey using (Drone) for green
preparation of Development Development 2016 2017 2017 field alignment of 90km, Processing
Feasibility Study Corporation Corporation the data on software’s. Traffic surveys
and Detailed Ltd. Ltd. and demand assessment
Project Report of Bandra Engineering surveys and investigations.
Access Controlled Mumbai Location and Proposals for revenue
Nagpur-Mumbai generation by commercial exploitation
Super along the corridor.
Communication Study, analysis, economics of different
Expressway.- land pooling/procurement models for
Nagpur Revenue expressway project
Division Location and layout of toll plazas, Trauma
(Package-I) Centre
Location and layout of truck lay byes
Location and layout of bus bays and bus
shelters
Social impact & Environment impact
assessment
Preliminary designs of road, bridges,
interchanges, VUPs, PUPs, ROBs, RUBs,
structures, etc.
Mapping of existing and proposed utilities
in the form 2D CAD Drawing and 3D CAD
models. Preparation of Land Plan
Schedules and Utility Relocation Plans
Preparation of indicative BOQ and
Detailed Cost Estimates .
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
40. Preparation of Maharashtra Maharashtra NA June Nov Nov 2017 PriMove is in association with S.N Bhobe
DPR of selected State Road State Road & Associates for this work.
stretches/corridor Development Development 2016 2017
of Road networks Corporation Corporation Topographical Survey of alignment,
in Sate of Ltd. Ltd. Prepration of contour drawings for
Maharashtra for Bandra existing alignments.
Package No. 5 Mumbai Collection of land plans/village maps,
(Tembhurni To 7/12, Geo-referencing of village maps.
Latur) Prepration of Land acquisition proposals.
41. Preparation of Maharashtra Maharashtra NA June Nov Nov 2017 PriMove is in association with S.N Bhobe
DPR of selected State Road State Road & Associates for this work.
stretches/corridor Development Development 2016 2017
of Road networks Corporation Corporation Topographical Survey of alignment,
in Sate of Ltd. Ltd. Prepration of contour drawings for
Maharashtra for Bandra existing alignments.
Package No. 16 Mumbai Collection of land plans/village maps,
(Phaltan To 7/12, Geo-referencing of village maps.
Mhaisal) Prepration of Land acquisition proposals.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
42. Preparation of S. N. Bhobe & S. N. Bhobe & NA Aug Dec Dec 2017 Topographical Survey of alignment,
DPR for Two lane Associates Associates Prepration of contour drawings for
with paved 2016 2017 existing alignments.
shoulder for Navi Mumbai Collection of land plans/village maps,
costal road MSH4 7/12, Geo-referencing of village maps.
from Jaigad to Prepration of Land acquisition proposals.
Khakshita thita in Feasibility of various suitable alignments.
Maharashtra Prepration of DPR, Estimates, BoQ‟s,
Tenders for Road Network, Bridges, Creek
bridges,
43. Preparation of S. N. Bhobe & S. N. Bhobe & NA Aug June June 2017 Topographical Survey of alignment,
DPR for Pune Ring Associates Associates Prepration of contour drawings for
Road (Westerly 2016 2017 existing alignments.
Section) Navi Mumbai Collection of land plans/village maps,
7/12, Geo-referencing of village maps.
Prepration of Land acquisition proposals.
Feasibility of various suitable alignments.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
44. Project Pune Municipal Pune Municipal 60 Cr (CP) Jan Dec Dec Project management consultants on new
Management Corporation, Corporation, and resurfacing of roads in a total of 7
consultants for Pune ShivajiNagar, 50 Lakhs 2007 2007 2007 different packages (Seven different
Road projects in Pune projects)
Pune City (CF) Quality Checking, Inspection
(7 Ring Road Project Monitoring & Report Preparation
projects) Co-ordination between Pune Municipal
Corporation and Contractors
45. Project Nanded Nanded 35 Cr (CP) Oct Nov Nov Finalisation of road alignments based on
management Municipal Municipal the development plan & transferring it on
consultancy and Corporation Corporation 65 Lakhs 2006 2008 2008 the ground, Preparation of land
Preparation of Nanded acquisition proposal is government
DPR for South (CF) prescribed format , Preparation of DPR
Nanded Road including detailed design, GIS Base data,
development technical specifications, bill of quantities,
Project rate analysis and cost estimates,
Preparation of bid document, support
evaluation of bids, Project management
services during execution including
project scheduling, quality management,
bill certification and on the site technical
support
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
46. Preparation of Fortress Fortress 40 Cr (CP) Feb Dec Dec Total survey of entire road. Preparation of
DPR for Mahur Infrastructure Infrastructure detailed design, estimate and specification
Road Advisory Advisory 28 Lakhs 2010 2010 2010 of various infrastructures. Preparation and
Development Services Services evaluation of tender document.
Project for Daryanagar (CF) Supervision of work, post tender activities
Department of House, of Mahur Road (Hilly Terrain) project
Tourism & Maharashi
Culture, Govt. of Karve Road,
Maharashtra Marine Lines,
Mumbai
47. Project Fortress Fortress 36 Cr (CP) April Nov Nov Total survey of entire road (15.5 KM BT
Management Infrastructure Infrastructure road) and 3 KM (concrete) Parikrama
consultancy and Advisory Advisory 32 Lakhs 2010 2010 2010 Marg. Preparation of detailed design,
preparation of Services for Services estimate and specification of various
DPR for Shegaon Department of Daryanagar (CF) infrastructures. Preparation and
BT & concrete Tourism and House, evaluation of tender document.
Road Culture, Govt. Maharashi Supervision of work, post tender activities
development of Maharahstra Karve Road, of Shegaon Road development including
including Marine Lines, Parikrama Marg Project.
Parikrama Mumbai
Project.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
48. Fixing alternative ATR ATR 40 Cr (CP) April Nov Nov Alternative alignment for NH4 at
alignment for NH4 Infrastructure Infrastructure Khambatki ghat. Survey and preparation
at Khambatki Pvt. Ltd. Pvt. Ltd. 2.5 Lakhs 1997 1998 1998 of detailed working estimates including
Ghat India India alignment finalisation, tunnel alignment,
(CF) for a section of Pune to Bangalore
highway (NH4) at Khambatki Ghat
including tunnel alignment, Encoding the
data, preparing computerized design and
GIS, Quality control and quantity checking
for works done and monitoring earthwork
vis-à-vis planned alignment
49. Preparation of Prasad Thane 100 Cr (CP) April Jan Jan Plane table survey for city roads and
Integrated Road Architect/ Municipal chowks, Marking boundaries as per
Development Thane Municipal Corporaion, 10 Lakhs 1997 1998 1998 Development Plan, Preparing Autocad
Phase I and III in Corporation Mumbai drawings for surveyed length of road,
Thane city (CF) Marking of boundaries on site as per DP
Plan for execution, L section and Cross
section survey of roads, Surveyed length
of roads 100 Km and 33 crossings and
junctions
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
50. 3D Remote The World Bank The World 23.75 Lakhs Jan April April Image Classification to prepare Land use
sensed Minor Bank (CF) & Land cover maps from 1990 to 2015
Irrigation New Delhi 2015 2015 2015 (Pre monsoon and Post monsoon).
Modeling & Crop The image classification of Pre Monsoon
Suitability Atlas & Post Monsoon images of Landsat 7 or
for West Bengal LISS 3 images which are freely available
Accelarated on NRSC website for year 1990 to 2000
Development of and latest images (2014-2015) will be
Minor Irrigation procured from NRSC for both districts
Project (Bankura & West Midnapur).
Change Detection study will be done by
using classified images , field visit
(ground verification) & Google earth
images
Base map preparation from topo sheets &
Digitization of Soil Maps for two districts.
DEM (Digital Elevation Model) Generation
i-e Surface Generation from imagery
Image Classification to prepare Land use
land cover maps for 1990 -1991 and 2000
for two districts (Bankura & West
Midnapur)
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
51. Preparation of Collector office 96.40 Lakh Sept Aug Aug Defining the project area
Zilla Parishad,
Environmental campus, (CF) Collection of base line data / information
Solapur
Development Plan Solapur 2014 2015 2015 to understand the present status of the
of 10 Villages in
village
Tal: Malshiras,
Pandharpur & Preparation of the base map and other
Madha in Solapur theme maps
District Preparation various Environmental action
plans
Development of vision for the process and
plan.
Identification of techno-economically
viable projects
52. Consultancy for RSPMU, Water RSPMU, Water 1.90 Cr May Jan Jan Identifying capacity building
Preparation of Supply & Supply & requirements at various levels (Needs
Capacity Building Sanitation Sanitation 2015 2017 2017 assessment)
Plan & Modules Department, Department, Assessing and improving the existing
under GoM GoM Maharashtra State Training Policy of the
Jalswarajya-Phase CIDCO sector
II Bhavan, Navi Developing a five year capacity building
Mumbai. plan for Maharashtra State including
resources requirement (internal/ external)
Developing a Capacity building
Implementation Plan for Maharashtra
State
Developing standard modules for key
trainings to be imparted
Develop a framework for monitoring the
effectiveness of implementation of
capacity building plan and its outcomes,
Train the Master Trainers
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
53. Capacity Building United Nations Unicef, UN 25.06 Lakhs July Dec Dec 5 days training of Master Trainers (State
& Handholding Children's Fund House, Plot (CF) 2017 2017 2017 level-5 days training on Orientation on
support for (Unicef) No:-41-42, status of WASH in MP, community
Community based Polytechnic approaches water safety and security,
village Water Colony, detail description of community level
Safety & Security Shyamla Hills, processes VWSS.
(VWSS) approach Bhopal 3 days workshop for newly recruited sub-
in Madhya engineers on community led water safety
Pradesh. and security planning.
3 divisional workshops of Madhya Pradesh
divisions namely Jabalpur and Gwalior on
brief orientation on community
approaches for water safety and security
processes, convergence from various line
department and preparation &
implementation of VWSS plans in
respective districts.
Handholding support by resource persons
for preparation and implementation of
community led VWSS plans.
73. Preparing of Govt. Of Govt. Of 92 Lakh (CF) Sep Feb Feb This included preparation of a Master Plan
Master Plan for Maharashtra, Maharashtra, for integrated Development and
Integrated Water Resource Water 2008 2011 2011 Management of Water resources of Terna,
Development and Department, Resource Lendi and Manar Sub–basins.
Management of Aurangabad Department, To identify and set priorities for promoting
Resources of Aurangabad water resources development projects in
Terna, Lendi and each sub-basin. Short and long term
Manar sub-basins action plan consistent with finance
allocations and priorities of the state
Govt. in each sub-basin.
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
74. Conducting SES National NTPC limited 11 Lakhs Mar Oct Oct This includes rapid assessment of project
and Development Thermal (CF) villages to identify impact , review of
of Power 2010 2010 2010 NRRP 2007, MID Act,
Rehabilitation Corporation R & R policy for designing R & R
Action Plan for Framework, Participatory process to
Mouda Super identify mitigation measures and
Thermal Power finalization of community development
Project-Stage-II activities and
Compensation package. Designing of RAP
implementation framework
75. Social Groundwater GSDA, Govt. of 13 Lakhs Jun Feb Feb This is an innovative project initiated
Assessment for Surveys and Maharashtra, (CF) under Maharashtra Water Sector
Sustainable Development Shivajinagar, 2007 2008 2008 Improvement Project funded by the world
Groundwater Agency Pune 5. bank focusing at four aquifers. The social
Management (GSDA), Water assessment is aimed at understanding
under Supply & potentials and constraints for social
Maharashtra Sanitation acceptance of the proposed aquifer
Water Sector Department, management approach.
Improvement Govt. of
Project (MWSIP), Maharashtra,
India the World Bank
Name of the Name of the Address of Total Cost Duration of the assignment Description of the
Sr.
Project Employer’s the of the Assignment/Services
No.
Employer’s Project From To Expected
(CP)* Aprx/ (Date) (Date) /
Consultancy Complet
Fees (CF) ed in
In INR year
76. Maharashtra The World Bank Water and 6.38 Lakhs Nov Feb Feb The project is aimed at understanding
Reforms Process Sanitation (CF) current status of reform process in Water
Assessment Program – 2007 2008 2008 supply sector in Maharashtra and to seek
South Asia further directions for implementation of
(WSP – SA), reforms. The study evaluates reform
New Delhi process in all programs related to drinking
water supply in six districts spread across
the state.
PriMove is contributing is designing of
evaluation, data collection/ interactions at
the state, district and village level, writing