Professional Documents
Culture Documents
CR, Er, Ecr, Ecor, NR, NCR, Ner, NFR, NWR, SR, SCR, Ser, Secr, SWR, WR, WCR and Metro Railway/Kolkata
CR, Er, Ecr, Ecor, NR, NCR, Ner, NFR, NWR, SR, SCR, Ser, Secr, SWR, WR, WCR and Metro Railway/Kolkata
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****
CR, ER, ECR, ECoR, NR, NCR, NER, NFR, NWR, SR, SCR, SER, SECR, SWR, WR, WCR and
Metro Railway/Kolkata.
Managing Director, Konkan Railway Corporation Ltd, Rail Bhawan, New Delhi.
Managing Director, IRCON, New Delhi.
Managing Director, RITES, New Delhi.
Managing Director, DMRC, N.B.C.C. Building, Pragati Vihar, New Delhi.
Managing Director, CONCOR, New Delhi.
Sub: Advance Correction Slip No.95 to the Indian Railways Permanent Way Manual -1986
para–826.
-----
Ministry of Railways (Railway Board) have decided that correction/addition as
indicated in the enclosed Advance Correction Slip No. 95 dated 30.06.2004, to relevant para
of the IRPWM, be made.
(H.L. SUTHAR)
Director Civil Engg.(P),
Railway Board.
-2-
OSD(ME), DTK(MC), DTK(M), Dir.(Works) I & II, DLM, DCE(B&S), DVE-I & DVE-II,
IPWE(I).
------
INDIAN RAILWAYS PERMANENT WAY MANUAL 1986 - ( EDITION)
The existing para 826 (i) of Indian Railways Permanent Way Manual may be
modified to read as under:-
826 (i) - The contractor shall not start any work without the presence of railway
supervisor or his representative and contractors supervisor at site.
A new para 826 (vii) may be added to Indian Railway Permanent Way Manual
as under:-
826 (vii) – The Engineer in-charge shall approve the methodology proposed to
be adopted by the contractor, with a view to ensure safety of trains, passengers
and workers and he shall also ensure that the methods and arrangements are
actually available at site before start of the work and the contractor’s
supervisors and the workers have clearly understood the safety aspects and
requirements to be adopted/followed while executing the work.
There shall be an assurance register kept at each site, which will have to be
signed by both, i.e. Railway Supervisor or his representative as will as the
contractor’s supervisor as a token of their having understood the safety
precautions to be observed at site.
******