Merencanakan Kolom

Pu = 477,555.00 kg Ø
= 4,775,550.00 N A Ø10
Mu = 62,000.00 kgm D
= 620,000,000.00 Nmm A D16
f'c = 30 Mpa sb
fy = 400 Mpa
fy sngkng = 240 Mpa
b = 500 mm
h = 500 mm
Bv beton = 2500 kg/m3

Kontrol tekuk pada kolom :


Pc = π².E.I E
Lc²
= 175,122,178.2 N Dimensi Ok I

Menghitung luas tulangan dengan tabel :


arah y = Pu
Ø.Ag.0,85.f'c
= 1.15 > 0,1

arah x = arah y.e e =


h =
= 0.299245852
1/2 h =

Sehingga dari grafik didapatkan :


r = 0.0465 d' =
β = 1.2 d'/h =

ρ = β.r d =
= 0.03

As = ρ.Ag
= 7500 mm²

Menghitung jumlah tulangan


n = As/AD
= 26.466
= 50 bh
Sehingga jumlah tulangan pokok :
jumlah = n/4
= 12.5 bh
= 13 bh

Menghitung tulangan geser


D = 1100 kg ØVc =
= 11000 N =
ØVsmaks =
Vu = D =
b.d
= 0.049 N/mm² Asengkang min

Sehingga menghitung luas tulangan sengkang :


Asng min = b.y
3.fy
= 694.44 mm²

n = Asng min
A Ø10
= 8.846 bh
= 6 bh

Jarak tulangan sengkang :


s = 1000/n
= 166.67 mm
= 200 mm
Konstruktur
KETUT ARIF WISMAYA
= 10 mm
= 78.5 mm²
= 19 mm
= 283.385 mm²
= 30 mm

= 4700.√f'c
= 25,742.960 Mpa
= 1/12.b.h³
= 5,208,333,333.3 mm⁴

Mu/pu
129.82798 mm
Tulangan 4 sisi
250 mm

50 mm
0.10

451
0,75.1/6.√f'c
0.68 Mpa
0,75.2/3.√f'c
2.74 Mpa
Merencanakan Kolom

Pu = 800 KN 800,000 N Rho = 0.03


Mu = 240 KNm 240,000,000 Nmm ø = 10 mm
f'c = 25 Mpa D = 19 mm
fy = 400 Mpa AD = 283.385 mm
sb = 30 mm
Mencari Luas Kolom
Pnmaks = Pu/Ø Po = Pnmaks/0,8
= 1,230,769 N = 1,538,462 N

Ag = Po
0,85*f'c*(1-Rho)+fy*Rho
= 47173.98355 mm

h atau b = √Ag
= 217.1957264 mm
= 500 mm Ag = 150000 mm²

Mencari Jumlah Tulangan


rumus 1
Ast = Rho*b*d d = h-(sb+ø+D/2)
= 6757.5 mm² = 450.5 mm

n = Ast/AD
= 23.84565168
= 17 bh

rumus 2
Ast = Rho*Ag
= 4500 mm²

n = Ast/AD
= 15.87945728
= 19 bh
e = Mu/Pu
= 300 mm Tulangan 2 sisi

1/2 h = 250 mm

Tabel
y = Pu d' = sb+ø+D/2
ø*Ag*0,85*f'c = 49.5 mm
= 0.386124 OK
d'/h = 0.099
x = y*et
h
= 0.231674