NUMBER Q01-D20

REV. NO. 0
ENGINEERING STANDARD DATE DEC. 1998
PAGE 1 OF 4

Nonmaterial Requirements for


Pressure Vessels and Columns

This document is issued by Engineering Standards Group, SABIC Engineering & Projects Management, Kingdom of Saudi Arabia.
All information contained in this document is the confidential property of SABIC. It can not be disclosed, copied or used for any purpose
without prior approval from SABIC. If you are not authorized to posses this document, please destroy it immediately.
NUMBER Q01-D20
Nonmaterial Requirements for REV. NO. 0
Pressure Vessels and Columns DATE DEC. 1998
ENGINEERING STANDARD PAGE 2 OF 4

CONTENTS

1. SCOPE ............................................................................................................. 3
2. REFERENCES 3
3. REQUIREMENTS 3
4. PRELIMINARY DRAWINGS FOR REVIEW AND APPROVAL BY SABIC ....... 3
5. CERTIFIED DRAWINGS, LITERATURE, PHOTOGRAPHS, AND PARTS
DATA 3
6. OPERATIONS, MAINTENANCE MANUALS, INSTALLATION
INSTRUCTIONS, AND TEST CERTIFICATES 3

APPENDIX
A .......................................................................................................................... 4
NUMBER Q01-D20
Nonmaterial Requirements for REV. NO. 0
Pressure Vessels and Columns DATE DEC. 1998
ENGINEERING STANDARD PAGE 3 OF 4

1. Scope
This document describes the requirements for submitting drawings and related documents by the successful bidder
for pressure vessel and columns.

2. References
Reference is made in this standard to the following document. The latest issue, amendments, and supplements to this
document shall apply unless otherwise indicated.
SABIC Engineering Standards (SES)
Q01-D15 Vessels: Data Sheets

3. Requirements
3.1 All nonmaterial requirements shall be as stated on Appendix A.
3.2 The applicable Item Reference as per Appendix A shall be shown on each document.
3.3 All final prints or transparencies shall be suitable for microfilming. Sepias or blue lines are not acceptable.
3.4 All drawings, manuals, and documents shall be written in English language.

4. Preliminary Drawings for Review and Approval by SABIC


In the event a Purchase Order is awarded, SABIC approval of these drawings shall be required prior to fabrication of
the units.

5. Certified Drawings, Literature, Photographs, and Parts Data


All prints or transparencies of final drawings shall be marked or certified to indicate that:
(i) the drawings are final and all dimensions and material specifications are according to the material or
equipment being supplied by the vendor.
(ii) no further changes shall be made either by the vendor or SABIC.
(iii) all revisions requested previously by SABIC are included.

6. Operations, Maintenance Manuals, Installation Instructions, and Test Certificates


6.1 All drawings, documents, manuals, lists or other literature shall be clearly marked with SABIC Purchase Order
number and item number, and the manufacturer’s serial numbers pertaining to the material or equipment being
supplied.
6.2 Shops or maintenance manuals shall include the following:
(i) Dimensions of mating surface
(ii) Tolerances to dimensions
(iii) Clearance between moving surfaces
(iv) Instructions for maintenance, disassembly, repair, overhaul and assembly
(v) System of trouble detection and remedy.
6.3 Priority codes as follows shall be required immediately after the receipt of:
1. Requisition/Purchase Order.
2. SABIC comments on preliminary drawings and specifications, catalog information, detailed drawings of
sub-vendors, and parts data.
3. Nonmaterial requirements covered by Item Reference B and after final inspection and testing.
NUMBER Q01-D20
Nonmaterial Requirements for REV. NO. 0
Pressure Vessels and Columns DATE DEC. 1998
ENGINEERING STANDARD PAGE 4 OF 4

APPENDIX A