Volume Cor Kolom
Volume Cor Kolom
B Shearwall
Basement 2 m3 312.32 Slump 12 ± 2
Basement 1 m3 385.20 Slump 12 ± 2
Lantai Dasar m3 499.71 Slump 12 ± 2
Lantai 2 m3 499.71 Slump 12 ± 2
Lantai 3 m3 325.89 Slump 12 ± 2
Lantai 4 m3 325.89 Slump 12 ± 2
Lantai 5 m3 325.89 Slump 12 ± 2
Lantai 6 m3 325.89 Slump 12 ± 2
Lantai 7 m3 325.89 Slump 12 ± 2
Lantai 8 m3 337.98 Slump 12 ± 2
Beton mutu - Fc' 25 Mpa (Material Supply By Owner)
I Plat
Basement 3 m3 753.10 Slump 12 ± 2
Basement 2 m3 976.88 Slump 12 ± 2
Basement 1 m3 1,212.94 Slump 12 ± 2
Lantai 1/ Dasar m3 1,046.48 Slump 12 ± 2
Lantai 2 m3 784.86 Slump 12 ± 2
Lantai 3 m3 910.44 Slump 12 ± 2
Lantai 4 m3 1,654.78 Slump 12 ± 2
Lantai 5 m3 1,631.59 Slump 12 ± 2
Lantai 6 m3 864.79 Slump 12 ± 2
Lantai 7 m3 790.28 Slump 12 ± 2
Lantai 8 m3 955.27 Slump 12 ± 2
PEKERJAAN LAIN-LAIN :
A Beton Dinding Basement 3 :
(Shear Wall GWT, STP B-3)
Beton m³ 1,416.72 Slump 12 ± 2
B Beton Dinding Basement 2 :
(Capping Beam by Others)
Beton m³ 1,108.52 Slump 12 ± 2
C Beton Dinding Basement 1 :
Beton m³ 1,106.57 Slump 12 ± 2
D Grease Trap Podium :
Beton m³ 32.87 Slump 12 ± 2
E Grease Trap Office :
Beton m³ 22.01 Slump 12 ± 2
F Grease Trap Apartment :
Beton m³ 29.65 Slump 12 ± 2
G Planter Box :
Beton m³ 65.96 Slump 12 ± 2
H Tunnel Intake 1,2 dan 3 :
Beton m³ 109.00 Slump 12 ± 2
OFFICE
A Kolom Satuan Renc. Volume Slump
Beton mutu - Fc' 45 Mpa (Material Supply By Owner)
Lantai 9 m3 54.73 Slump 12 ± 2
Lantai 10 m3 54.73 Slump 12 ± 2
Lantai 11 m3 54.73 Slump 12 ± 2
Lantai 12 m3 54.73 Slump 12 ± 2
Lantai 13 m3 54.73 Slump 12 ± 2
Lantai 14 m3 48.99 Slump 12 ± 2
Lantai 15 m3 48.99 Slump 12 ± 2
Lantai 16 m3 43.70 Slump 12 ± 2
Lantai 17 m3 43.70 Slump 12 ± 2
Lantai 18 m3 43.70 Slump 12 ± 2
Beton mutu - Fc' 40 Mpa (Material Supply By Owner)
Lantai 19 m3 43.70 Slump 12 ± 2
Lantai 20 m3 43.70 Slump 12 ± 2
Beton mutu - Fc' 35 Mpa (Material Supply By Owner)
Lantai 21 m3 43.70 Slump 12 ± 2
Lantai 22 m3 43.70 Slump 12 ± 2
Lantai 23 m3 43.70 Slump 12 ± 2
Lantai 24 m3 43.70 Slump 12 ± 2
Beton mutu - Fc' 25 Mpa (Material Supply By Owner)
Lantai 25 m3 43.70 Slump 12 ± 2
Lantai 26 m3 43.70 Slump 12 ± 2
Lantai 27 m3 43.70 Slump 12 ± 2
Lantai 28 m3 43.70 Slump 12 ± 2
Lantai 29 m3 43.70 Slump 12 ± 2
Lantai 30 m3 43.70 Slump 12 ± 2
Lantai 31 m3 43.70 Slump 12 ± 2
Lantai 32 m3 43.70 Slump 12 ± 2
Lantai 33 m3 43.70 Slump 12 ± 2
Lantai 34 m3 43.70 Slump 12 ± 2
Lantai 35 m3 43.70 Slump 12 ± 2
Lantai Atap m3 1.49 Slump 12 ± 2
B Shearwall
Beton mutu - Fc' 45 Mpa (Material Supply By Owner)
Lantai 9 m3 154.12 Slump 12 ± 2
Lantai 10 m3 154.12 Slump 12 ± 2
Lantai 11 m3 154.12 Slump 12 ± 2
Lantai 12 m3 154.12 Slump 12 ± 2
Lantai 13 m3 154.12 Slump 12 ± 2
Lantai 14 m3 154.12 Slump 12 ± 2
Lantai 15 m3 154.12 Slump 12 ± 2
Lantai 16 m3 154.12 Slump 12 ± 2
Lantai 17 m3 154.12 Slump 12 ± 2
Lantai 18 m3 154.12 Slump 12 ± 2
Beton mutu - Fc' 40 Mpa (Material Supply By Owner)
Lantai 19 m3 154.12 Slump 12 ± 2
Lantai 20 m3 151.98 Slump 12 ± 2
Beton mutu - Fc' 35 Mpa (Material Supply By Owner)
Lantai 21 m3 154.12 Slump 12 ± 2
Lantai 22 m3 154.12 Slump 12 ± 2
Lantai 23 m3 154.12 Slump 12 ± 2
Lantai 24 m3 154.12 Slump 12 ± 2
Beton mutu - Fc' 25 Mpa (Material Supply By Owner)
Lantai 25 m3 154.12 Slump 12 ± 2
Lantai 26 m3 154.12 Slump 12 ± 2
Lantai 27 m3 154.12 Slump 12 ± 2
Lantai 28 m3 154.12 Slump 12 ± 2
Lantai 29 m3 154.12 Slump 12 ± 2
Lantai 30 m3 154.12 Slump 12 ± 2
Lantai 31 m3 154.12 Slump 12 ± 2
Lantai 32 m3 154.12 Slump 12 ± 2
Lantai 33 m3 154.12 Slump 12 ± 2
Lantai 34 m3 154.12 Slump 12 ± 2
Lantai 35 m3 154.12 Slump 12 ± 2
Lantai Atap m3 106.70 Slump 12 ± 2
Lantai LMR m3 115.78 Slump 12 ± 2
D Plat
Lantai 9 m3 182.66 Slump 12 ± 2
Lantai 10 m3 182.66 Slump 12 ± 2
Lantai 11 m3 182.66 Slump 12 ± 2
Lantai 12 m3 182.66 Slump 12 ± 2
Lantai 13 m3 182.66 Slump 12 ± 2
Lantai 14 m3 182.66 Slump 12 ± 2
Lantai 15 m3 182.66 Slump 12 ± 2
Lantai 16 m3 182.66 Slump 12 ± 2
Lantai 17 m3 182.66 Slump 12 ± 2
Lantai 18 m3 182.66 Slump 12 ± 2
Lantai 19 m3 182.66 Slump 12 ± 2
Lantai 20 m3 182.66 Slump 12 ± 2
Lantai 21 m3 182.66 Slump 12 ± 2
Lantai 22 m3 182.66 Slump 12 ± 2
Lantai 23 m3 182.66 Slump 12 ± 2
Lantai 24 m3 177.00 Slump 12 ± 2
Lantai 25 m3 177.00 Slump 12 ± 2
Lantai 26 m3 161.22 Slump 12 ± 2
Lantai 27 m3 161.22 Slump 12 ± 2
Lantai 28 m3 161.22 Slump 12 ± 2
Lantai 29 m3 161.22 Slump 12 ± 2
Lantai 30 m3 161.22 Slump 12 ± 2
Lantai 31 m3 161.22 Slump 12 ± 2
Lantai 32 m3 161.22 Slump 12 ± 2
Lantai 33 m3 161.22 Slump 12 ± 2
Lantai 34 m3 161.22 Slump 12 ± 2
Lantai 35 m3 161.22 Slump 12 ± 2
Lantai Atap m3 197.12 Slump 12 ± 2
Lantai Office LMR m3 16.97 Slump 12 ± 2
Lantai Office LMR Roof m3 21.58 Slump 12 ± 2
E Tangga ST1 : ( Plat, Balok, Trap tangga, dan Kolom )
Lt. 9 - Lt. 10 m3 3.69 Slump 12 ± 2
Lt. 10 - Lt. 11 m3 3.69 Slump 12 ± 2
Lt. 11 - Lt. 12 m3 3.69 Slump 12 ± 2
Lt. 12 - Lt. 13 m3 3.69 Slump 12 ± 2
Lt. 13 - Lt. 14 m3 3.69 Slump 12 ± 2
Lt. 14 - Lt. 15 m3 3.69 Slump 12 ± 2
Lt. 15 - Lt. 16 m3 3.69 Slump 12 ± 2
Lt. 16 - Lt. 17 m3 3.69 Slump 12 ± 2
Lt. 17 - Lt. 18 m3 3.69 Slump 12 ± 2
Lt. 18 - Lt. 19 m3 3.69 Slump 12 ± 2
Lt. 19 - Lt. 20 m3 3.58 Slump 12 ± 2
Lt. 20 - Lt. 21 m3 3.62 Slump 12 ± 2
Lt. 21 - Lt. 22 m3 3.62 Slump 12 ± 2
Lt. 22 - Lt. 23 m3 3.62 Slump 12 ± 2
Lt. 23 - Lt. 24 m3 3.62 Slump 12 ± 2
Lt. 24 - Lt. 25 m3 3.62 Slump 12 ± 2
Lt. 25 - Lt. 26 m3 3.62 Slump 12 ± 2
Lt. 26 - Lt. 27 m3 3.62 Slump 12 ± 2
Lt. 27 - Lt. 28 m3 3.62 Slump 12 ± 2
Lt. 28 - Lt. 29 m3 3.62 Slump 12 ± 2
Lt. 29 - Lt. 30 m3 3.62 Slump 12 ± 2
Lt. 30 - Lt. 31 m3 3.62 Slump 12 ± 2
Lt. 31 - Lt. 32 m3 3.62 Slump 12 ± 2
Lt. 32 - Lt. 33 m3 3.62 Slump 12 ± 2
Lt. 33 - Lt. 34 m3 3.68 Slump 12 ± 2
Lt. 34 - Lt. 35 m3 3.69 Slump 12 ± 2
Lt. 35 - Lt. Atap m3 3.41 Slump 12 ± 2
Lt. Atap - Lt. LMR m3 2.72 Slump 12 ± 2
B Shearwall
Beton mutu - Fc' 45 Mpa (Material Supply By Owner)
Lantai 9 m3 93.52 Slump 12 ± 2
Lantai 10 m3 93.52 Slump 12 ± 2
Lantai 11 m3 93.52 Slump 12 ± 2
Lantai 12 m3 93.52 Slump 12 ± 2
Lantai 13 m3 93.52 Slump 12 ± 2
Lantai 14 m3 82.55 Slump 12 ± 2
Beton mutu - Fc' 40 Mpa (Material Supply By Owner)
Lantai 15 m3 82.55 Slump 12 ± 2
Lantai 16 m3 82.55 Slump 12 ± 2
Lantai 17 m3 82.55 Slump 12 ± 2
Lantai 18 m3 82.55 Slump 12 ± 2
Lantai 19 m3 82.55 Slump 12 ± 2
Beton mutu - Fc' 35 Mpa (Material Supply By Owner)
Lantai 20 m3 82.55 Slump 12 ± 2
Lantai 21 m3 82.55 Slump 12 ± 2
Lantai 22 m3 82.55 Slump 12 ± 2
Lantai 23 m3 82.55 Slump 12 ± 2
Lantai 24 m3 82.55 Slump 12 ± 2
Beton mutu - Fc' 25 Mpa (Material Supply By Owner)
Lantai 25 m3 82.55 Slump 12 ± 2
Lantai 26 m3 82.55 Slump 12 ± 2
Lantai 27 m3 82.55 Slump 12 ± 2
Lantai 28 m3 82.55 Slump 12 ± 2
Lantai 29 m3 82.55 Slump 12 ± 2
Lantai 30 m3 82.55 Slump 12 ± 2
Lantai 31 m3 82.55 Slump 12 ± 2
Lantai 32 m3 82.55 Slump 12 ± 2
Lantai 33 m3 82.55 Slump 12 ± 2
Lantai 34 m3 82.55 Slump 12 ± 2
Lantai 35 m3 82.55 Slump 12 ± 2
Lantai 36 m3 82.55 Slump 12 ± 2
Lantai Roof m3 82.55 Slump 12 ± 2
Lantai Lower Roof m3 82.55 Slump 12 ± 2
Lantai LMR m3 57.15 Slump 12 ± 2
Pekerjaan Lain-lain
A Pedestal Gondola track Lower Roof
Beton m³ 6.50 Slump 12 ± 2
B Parapet Roof
Beton m³ 43.09 Slump 12 ± 2
C Planter Box Lantai Refuge
Beton m³ 13.54 Slump 12 ± 2
PEKERJAAN BETON APARTMENT
B Shearwall
Lantai 9 m3 90.34 Slump 12 ± 2
Lantai 10 m3 90.34 Slump 12 ± 2
Lantai 11 m3 90.34 Slump 12 ± 2
Lantai 12 m3 90.34 Slump 12 ± 2
Lantai 13 m3 90.34 Slump 12 ± 2
Lantai 14 m3 90.34 Slump 12 ± 2
Beton mutu - Fc' 40 Mpa (Material Supply By Owner)
Lantai 15 m3 90.34 Slump 12 ± 2
Lantai 16 m3 90.34 Slump 12 ± 2
Lantai 17 m3 90.34 Slump 12 ± 2
Lantai 18 m3 90.34 Slump 12 ± 2
Lantai 19 m3 90.34 Slump 12 ± 2
Lantai 20 m3 90.34 Slump 12 ± 2
Beton mutu - Fc' 35 Mpa (Material Supply By Owner)
Lantai 21 m3 90.34 Slump 12 ± 2
Lantai 22 m3 90.34 Slump 12 ± 2
Lantai 23 m3 90.34 Slump 12 ± 2
Lantai 24 m3 90.34 Slump 12 ± 2
Lantai 25 m3 90.34 Slump 12 ± 2
Beton mutu - Fc' 25 Mpa (Material Supply By Owner)
Lantai 26 m3 90.34 Slump 12 ± 2
Lantai 27 m3 90.34 Slump 12 ± 2
Lantai 28 m3 90.34 Slump 12 ± 2
Lantai 29 m3 90.34 Slump 12 ± 2
Lantai 30 m3 90.34 Slump 12 ± 2
Lantai 31 m3 90.34 Slump 12 ± 2
Lantai 32 m3 90.34 Slump 12 ± 2
Lantai 33 m3 90.34 Slump 12 ± 2
Lantai 34 m3 90.34 Slump 12 ± 2
Lantai 35 m3 90.34 Slump 12 ± 2
Lantai 36 m3 90.34 Slump 12 ± 2
Lantai 37 m3 90.34 Slump 12 ± 2
Lantai 38 m3 90.34 Slump 12 ± 2
Lantai Lower Atap m3 62.54 Slump 12 ± 2
Lantai LMR m3 42.42 Slump 12 ± 2
D Plat
Lantai 9 m3 209.43 Slump 12 ± 2
Lantai 10 m3 209.43 Slump 12 ± 2
Lantai 11 m3 209.43 Slump 12 ± 2
Lantai 12 m3 209.43 Slump 12 ± 2
Lantai 13 m3 209.43 Slump 12 ± 2
Lantai 14 m3 209.43 Slump 12 ± 2
Lantai 15 m3 209.43 Slump 12 ± 2
Lantai 16 m3 209.43 Slump 12 ± 2
Lantai 17 m3 209.43 Slump 12 ± 2
Lantai 18 m3 209.43 Slump 12 ± 2
Lantai 19 m3 209.43 Slump 12 ± 2
Lantai 20 m3 207.76 Slump 12 ± 2
Lantai 21 m3 208.82 Slump 12 ± 2
Lantai 22 m3 208.82 Slump 12 ± 2
Lantai 23 m3 208.63 Slump 12 ± 2
Lantai 24 m3 208.63 Slump 12 ± 2
Lantai 25 m3 208.63 Slump 12 ± 2
Lantai 26 m3 208.63 Slump 12 ± 2
Lantai 27 m3 208.63 Slump 12 ± 2
Lantai 28 m3 208.38 Slump 12 ± 2
Lantai 29 m3 208.38 Slump 12 ± 2
Lantai 30 m3 208.38 Slump 12 ± 2
Lantai 31 m3 208.38 Slump 12 ± 2
Lantai 32 m3 208.38 Slump 12 ± 2
Lantai 33 m3 205.98 Slump 12 ± 2
Lantai 34 m3 205.98 Slump 12 ± 2
Lantai 35 m3 205.98 Slump 12 ± 2
Lantai 36 m3 205.98 Slump 12 ± 2
Lantai 37 m3 205.98 Slump 12 ± 2
Lantai 38 m3 205.98 Slump 12 ± 2
Lantai Lower Atap m3 257.38 Slump 12 ± 2
Lantai LMR m3 17.38 Slump 12 ± 2
Lantai Atap LMR m3 16.76 Slump 12 ± 2