ARE RUNNING 1. ACW PUMP START : BACK CHARGE CONDENSER & CW PUMP DISCHARGE PIPE LINES. 2. VENT OUT CONDENSER & CW LINES TO RELEASE AIR PROPERLY ( 15 – 30 minutes each) 3. START CW PUMP : Normalise CW & ACW FLOW 4. Take Water in CONDENSATE STORAGE TANK 5. Start DM MU Pump to take water in DM MU Tank AND HOTWELL UPTO NORMAL LEVEL. 6. DMCW PUMP TO START AFTER TANK LVL OK 7. START INSTRUMENT & SERVICE AIR COMPRESSORS . 8. START BOILER FILL PUMP FOR TAKING WATER IN BOILER DRUM UPTO LIGHT UP LEVEL AND DEAERATOR STORAGE TANK UPTO NORMAL LEVEL. ( DRUM FILLING TAKES 75-90 MIN. ) 9. START CEP ON WHEN HOTWELL LEVEL NORMAL AND KEEP IT RUNNING ON RECIRCULATION. • GENERATOR SEAL IS TO BE ESTABLISHED & FEED GAS.
• PUT TURBINE ON BARRING
GEAR. BOILER LIGHT UP.
Carry out pre-checking of Boiler Light Up.
10. START APH ID FAN FD FAN. (BEFORE STARTING ID FAN FLUE PATH SHOULD BE THRU) 11. ESTABLISH AIR FLOW 30% to 40% MAINTAINING FURNACE PRESS. (-5 TO -10 mm WC) 12. START SCANNER AIR FAN 13. PURGE BOILER LIGHTUP WITH LDO 2 GUNS ( Say AB 1-3 ) & AFTER 15 MIN TAKE OTHER PAIR ( AB 2- 4 ). 14. AT DRUM PRE AT 2 KSC CLOSE DRUM VENT(s). 15. MAY START DEA. INITIAL HEATING TAKING AUX. STM FROM SIDE UNIT . 16. CLOSE STEAM SIDE DRAINS AND VENTS WHEN BOILER DRUM PRESS. 6 – 8 KSC. 17. WARM UP MAIN STM LINES AND AFTER WARM UP OPEN MAIN STEAM STOP VALVES. 18.RISE DRUM PRESS TO 25 KSC. AND PUT SELF APRDS INTO SERVICE. 19.START VACUUM PULLING AND ACHIEVE RATED VACUUM. 20. HP-LP BYEPASS CHARGE--! CLOSE START UP VENT 21. PUT 2 MORE GUNS IN CD ELE , AND ACHIEVE MATCHING STEAM PARAMETER FOR TURBINE ROLLING. ( For cold machine STEAM PRESS. 35KSC, TEMP. 3500 C. APPROX. ) TURBINE STEAM ROLLING (Cold Start up) : 22.START ROLLING AND ACHIEVE SOAKING SPEED (600 rpm). 23. SATRT ONE PA FAN AND KEEP ONE MILL RUNNING WITHOUT FEEDER. 24.AFTER COMPLETION OF SOAKING INCREASE TURBINE SPEED TO 3000 RPM. 25. SYNCHRONISE GENERATOR – LOAD WILL BE 5% 26. START FEEDER & INCREASE COAL FEEDING. MONITOR STM PRESS. & TEMP. 27.CUT-IN 2ND MILL & RAISE FEEDING. MONITOR STM PRESS. & TEMP. AT 20% LOAD
28.PUT LPH INTO SERVICE
29.UNIT AUX TRANSFORMER SERVICE 30.DEAERATER PEGGING FROM CRH STEAM 31.CHECK HPLP BYPASS CLOSED. 32.STOP ALL GUNS 33.FCS FROM LOW LOAD (30%) TO HIGH LOAD (100%) RANGE VALVE 34.CUT IN THIRD COAL MILL AND INCREASE LOAD. AT 40% OF LOAD IN MW 35.HPH IN SERVICE 36.PUT EHG GOV LOAD TO PRESS. CONTROL ( TURBINE FOLLOW MODE ) 37.CHARGE DEA PEGGING STEAM FROM CRH TO EXTRN. LINE 38.CUT-IN 3RD MILL & RAISE FEEDING. MONITOR STM PRE & TEMP. 39.PUT ATTEMP. CONTROLLERS & BURNER TILT INTO SERVICE TO CONTROL MS & HR STM. TEMP. AT 50-55% LOAD 39.START 2ND BFP 40.START 2ND. SET ID , FD & PA FAN 41.TAKE 4TH MILL & INCREASE LOAD 42.PUT BOILER MASTER IN AUTO. 43.PUT UNIT LOAD CONTROL ON CMC. 44.ACHIEVE 100% LOAD. • OBSERVE TSE MARGINS CAREFULLY