Professional Documents
Culture Documents
U District Station Area Mobility Plan - Final
U District Station Area Mobility Plan - Final
U District Station Area Mobility Plan - Final
INTRODUCTION ....................................................................................................................................................9
Background .................................................................................................................................................................................................... 9
Project Purpose ........................................................................................................................................................................................ 11
Report Contents ....................................................................................................................................................................................... 12
APPENDICES ....................................................................................................................................................... 61
ExECUTIVE SUMMARY 1
Give top priority to Design for pedestrian access Configure an efficient,
pedestrian movement. to the station flexible bus route network.
While transit, auto, and bike NE 43rd Street from 15th The District’s accessibility
transportation are important, Avenue NE to Brooklyn depends on the maintenance
it is pedestrian circulation Avenue NE will see dramatic and expansion of its
that connects destinations increases in pedestrian currently excellent bus
and other modes. Current volumes between the light service. Convenient transfers
sidewalks will not be sufficient rail station, the Ave, and the between bus and light rail
to provide comfortable walking University. Additionally, buses are a community priority.
along University Way NE and may be routed westbound Local route planning will
NE 43rd Street. Among those in the short-term. Therefore, begin in 2019 and may
participating on the project, a curbless street section is consider substantially more
there was overwhelming public recommended that allows for bus trips. This engagement
support for transforming greater pedestrian space and process by Metro should
University Way NE (the Ave) the flexibility to adapt to mode include all members of the
into a pedestrian street from changes over time. Pedestrian community and stakeholders,
NE 42nd Street to NE 45th improvements across NE 45th including, but not limited
Street in the long-term. This Street at Brooklyn Avenue to: residents, community
does not mean that there were NE will be needed to provide councils, small businesses,
not concerns with various better access to the light rail social service organizations,
levels of pedestrianization. station from the north. students, property owners,
This will require a strategic and developers. At the same
sequence of actions, but time, buses can bring negative
incremental improvements can impacts such as noise and
be phased to provide benefits fumes that hinder street life
when they are implemented on the Ave, and the need for
and adjustments made to layover space that diminishes
support local businesses, parking and pedestrian
achieve the optimal balance activity. It is important that
between pedestrian and the U District community have
vehicle movement, and a strong voice in bus transit
produce a safe and inviting planning and that any route
public realm. The U District configuration minimizes these
Small Businesses Association is impacts while enhancing route
but one organization that will speed and reliability. For this
participate in the process. reason, this plan recommends
that Brooklyn Avenue NE be
considered as part of a future
bus route network in order to
provide greater bus routing
flexibility and access to the
light rail station.
ExECUTIVE SUMMARY 3
The following map illustrates how the individual principles previously
described are integrated into a functional concept to be pursued over
the long-term.
11th Ave
12th Ave
Pedestrian-priority
(service and emergency
vehicles only)
Bicycles
NE 45th St
Buses Near Term
9th Ave NE
Buses Long Term
Private Vehciles
NE 43rd St NE 43rd St
Roosevelt Way NE
Other Elements
University Way NE
Brooklyn Ave NE
Development coordinated
UNIVERSITY OF
WASHINGTON
to provide access and
NE 42nd St internal circulation
Parking Reservoir
8th Ave NE
NE 41st St
NE Campus Pkwy
NE 40th St
ExECUTIVE SUMMARY 5
8. Begin a comprehensive parking management strategy to identify
means to ensure that there will be adequate on-street and off-
street short-term parking for businesses and those who require
vehicles for access (e.g.: people with limited mobility).
9. Maintain and strengthen homelessness and crisis intervention
programs to ensure that the needs of individuals experiencing
homelessness are addressed compassionately.
10. Continue to support and provide resources to a public realm
maintenance and management program to keep pedestrian areas
safe and attractive.
11. Use the U District as one of the pilot areas for upcoming SDOT
wayfinding plan.
12. Continue alley activation efforts as outlined in the U District
Alley Activation Plan and implement development provisions for
internal building service and mid-block passageways.
13. Begin collaborative planning of private development between
NE 45th Street, 15th Avenue NE, NE 42nd Street, and Brooklyn
Avenue NE to improve circulation, infrastructure, services, and
development opportunities. Consider collaborative access and
parking, alley reconfiguration, east-west pass-throughs, etc. (Note:
recent development in Pike/Pine provides a model.)
14. Monitor and address impacts to businesses from transportation
changes. (Ongoing throughout all phases.)
ExECUTIVE SUMMARY 7
Phase 3: Long-Term Vision (2028+)
23. Remove buses and private vehicles from the Ave and complete
substantial pedestrian improvements between NE 45th Street
and NE 42nd Street.
24. Route buses onto Brooklyn Avenue NE to improve transit
reliability, transfers, and pedestrian movement on NE 43rd Street
and/or University Way NE.
25. Complete Brooklyn Avenue Green Street improvements with
northbound protected bike lane south of NE 43rd Street and
north of NE 45th Street, extensive landscaping, and compatibility
with buses.
Background
As home to the University of Washington, the second largest business
district in the City, and several important museums, performance
venues, and an active residential community, the U District is a
critically important part of Seattle’s “innovation economy”, ethnic
diversity, small business opportunities, and cultural life. With the
possible exception of Downtown, the U District also features the
most complex and challenging multimodal network of transportation
systems in the City. This complexity is magnified by the uncertain
effects of projected growth, evolving human behavior patterns, and
technological advances.
extension of the light rail line will transform how people get around
the surrounding neighborhood, is projected to serve between 22,000
and 26,000 riders daily by 2042, and spur the restructuring of the
area’s bus service. Additionally, with recent zoning updates, the
area’s residential population is expected to add 5,000 new housing
units in the next 10 years, and the University of Washington plans
its student and staff population to grow by about 20% in 20 years.
These trends will add substantially to the District’s already high
pedestrian volumes, numerous transit routes, and congested streets.
Faced with these projections, the U District Mobility Group (UDMG),
consisting of a volunteer group of residents, small business owners,
and representatives from institutions in the neighborhood including
the University of Washington and Seattle Children's, initiated this
study to improve access and circulation within the station area.
With funds raised by UDMG members supplementing a Seattle Figure 4. Job growth figures in the U
Department of Neighborhoods' Neighborhood Matching Fund grant District excluding UW increases.
to provide outreach materials, press releases, news stories and Source: U District Rezone Proposal EIS.
project related activities, the plan emphasized extensive community
outreach and engagement with residents, businesses, and the
INTRODUCTION 9
University of Washington. The UDMG hired a consultant team to
provide technical support and guidance, as well as assist with the
public engagement effort. The project’s geographic focus is indicated
in Figure 6, but recognizes that changes in transit systems outside the
study area will influence conditions in the District. The work builds
upon existing plans, frameworks, and investigations, such as the U
District Urban Design Framework, U District Parks Plan Update, U
District Alley Activation Plan, Sound Transit’s U District Station permit
set, and recently adopted City and county modal plans, among others.
The UDMG/consultant team (planning team) actively collaborated
with the City and transit agencies through a series of “Strategy
Group” work sessions that included representatives from the Seattle
Department of Transportation, King County Metro, and Sound Transit,
among other participants. Although the project schedule and budget
limited the amount of technical and analytical work that could be
performed, the planning team was able to explore potential solutions
to pressing challenges in the project area.
Project Purpose
This study’s overarching purpose is to identify the University District
community’s vision, goals, and preferences regarding mobility
improvements that will occur in the near-term and long-term future.
The plan recognizes that decisions regarding street design, transit
routing, and other transportation improvements will be made over
time and will be influenced by a number of technical, institutional,
and political concerns. However, the results of this project will
assist the community in playing a stronger and more meaningful
role in making those decisions. Additionally, the study describes a
comprehensive circulation vision for the District with a rational and
flexible strategy for achieving the community’s goals. This strategy
will enable community members to continue to work collaboratively
with the City and transit agencies as the District and its supporting
infrastructure change dramatically over time.
Report Contents
This document includes:
• A summary of existing conditions to orient the reader and present
information useful in understanding the District’s mobility
challenges as well as the plan’s concept and recommendations.
• A description of the planning process with a summary of public
engagement activities and their results.
• A brief summary of the project’s background and objectives.
• The long-term circulation concept that describes the desired
long-term outcomes, the interrelationships between the
individual mobility improvement actions, and the implementation
strategies to achieve community objectives.
• Descriptions of conceptual street designs and other mobility
proposals.
• A compiled list of recommendations.
• Appendices containing more detailed results of public
engagement activities and existing conditions analyses.
INTRODUCTION 11
This page intentionally left blank
Pedestrian Circulation
The U District features some of the heaviest
walking traffic in the City. Pedestrian circulation in
the study area is supported by a well-connected
street grid with mostly adequate sidewalks,
crosswalks, and traffic signals. Important
destinations include the UW campus, residences to
the north, west, south, and north east of campus,
and the shopping district of the Ave. Important
barriers to pedestrian movement are arterial
streets, especially NE 45th Street, which bisects the
District, and I-5.
• University Way NE (“the Ave”) is the principal Figure 5. Typical conditions on University Way NE (the Ave).
OPCD/OngoingInitiatives/UDistrictUrbanDesign/PedestrianCountsinUDistrict.pdf
Safety
Despite the high pedestrian volumes on the Ave, most collisions
involving pedestrians occur on other streets, especially NE 45th Figure 8. Pedestrian-oriented volumes
Street. counted by UW urban design and
planning class in Spring 2018.
• Traffic collisions involving pedestrians are a regular occurrence
on 45th Street at intersections with Roosevelt Way NE, 15th
Avenue NE, and Brooklyn Avenue NE where large numbers of
turning vehicles, driveways, and short crossing intervals increase
the potential for conflicts between motorists and people walking.
The Bicycle and Pedestrian Safety Analysis (BPSA) completed in
2016 identified these three intersections among the top 20 most
challenging for pedestrians in the entire city.
• Traffic safety is also an issue in the south-west edge of the
study area where Roosevelt Way, 11th Avenue, and NE Campus
Parkway converge near the University Bridge. Complicated street Figure 7. Looking west at NE 45th
Street and Brooklyn Avenue.
configurations and high-speed traffic increase risk for pedestrians
and cyclists. The latest data analyzed in the BPSA was from 2015.
Since that time design modifications have been made to Campus
Parkway.
Bus Transit
The U District is well served by bus transit. Intra-city, local, and
peak-only regional commuter express buses provide connections for
students, workers, residents, and shoppers to and from the U District.
Fifteenth Avenue NE and NE 45th Street support the heaviest bus
traffic, both with several thousand daily boardings at stops within the
study area.
• Fifteenth Avenue supports ten routes running northbound and
southbound. These include five intra-city routes with up to 60
buses per hour and five eastside commuter routes with 95 buses
per hour during the evening peak.
• Route 44 is the key east-west route serving the U District via NE
45th Street. It provides frequent, all-day connections to Ballard
and Wallingford. However, congestion causes major delays on this
route on 45th Street. Plans to upgrade Route 44 to a RapidRide
line seek to mitigate delays and increase ridership along this
route, providing the primary transfer to the future light rail station
from the west. Eighteen buses per hour currently use 45th Street
during peak periods.
• All day frequent routes such as Route 45 provide service on the
University Way NE, creating a secondary transit street in the U
District with 23 buses per hour during peak periods. While direct
bus access to the Ave is convenient for riders, the noise and
exhaust of diesel coaches serving these routes discourage street
activity.
• Roosevelt Way NE and 11th Avenue NE form a transit couplet
for north-south routes crossing University Bridge. These routes
will provide a direct transfer to the light rail at the Northgate and
Roosevelt light rail stations when they open in 2021 and will
likely not need to serve U District Station directly.
Upon the opening of the U District station in 2021, bus to light rail
University Way NE
45, 71, 73, 373 23 N/A N/A
(the Ave)
The buses-per-hour volumes noted above represent a general average. Bus frequencies can fluctuate.
Trains will arrive every six minutes from both directions during peak
periods, at which time approximately 50-75 passengers will exit the
station onto 43rd Street and Brooklyn Avenue roughly every three
minutes.
Vehicle Traffic
The heart of the U District neighborhood is surrounded by arterial
streets. (Figure 6 graphically depicts average weekday traffic counts.)
• The most heavily traveled street is NE 45th Street which
carries more than 33,000 vehicles per day and connects to I-5,
Wallingford, University Village, and Sand Point Way.
• Roosevelt Way and 11th Avenue combine to carry 20,000
vehicles north-south.
• 15th Avenue supports 17,000 vehicles daily in addition to heavy
bus traffic.
• Pacific Street, on the southern edge of the U District, carries
approximately 20,000 vehicles per day.
Bicycle Facilities
Several different types of bicycle facilities are present on U District
streets:
• A one-way protected bike lane is in place on Roosevelt Way NE
(southbound), NE Campus Parkway between Brooklyn Avenue NE
and Roosevelt Way, and on one block of Brooklyn Avenue south
of Campus Parkway.
• There are traditional painted bike lanes on 11th Avenue NE,
University Way NE south of Campus Parkway, and on Brooklyn
Parking
On-street and off-street parking in the U District serves several
distinct types of users, including:
• People visiting the District for food, shopping, appointments, or
entertainment use hourly parking. Typically, these spaces are
provided by on-street metered parking and in privately operated
surface lots. Many of the District’s signature businesses and
attractions draw on, and in some cases depend on, a regional
clientele who arrive by car.
• UW employees and other workers who drive require long-term parking
The arrival of the light rail and new development are likely to
transform parking conditions in the U District in several ways:
• Privately owned surface lots that provide short-term parking for
shoppers and the Ave patrons will redevelop into residential and
commercial buildings.
• Residents of surrounding neighborhoods will wish to park near
the light rail station to travel elsewhere using the light rail,
increasing demand for daily and hourly parking, potentially
raising prices and/or decreasing availability.
• As new light rail lines open (Bellevue in 2023 and Lynnwood in
2024), increasing numbers of workers who currently drive will
have the ability to commute to the U District by rail.
• New residential development will increase the need for long-
term, overnight parking even as a smaller proportion of residents
rely on personal cars for transportation.
Figure 11. The U District includes many regional attractions including businesses
such as the University Bookstore, theaters, the Farmers Market, the Burke and Henry
Museums, and University of Washington performance venues. While transit may
improve access for some, many people will still rely on automobiles to reach the
District. Likewise, regionally based businesses will still rely on parking, at least for
the foreseeable future.
Development Context
In February 2017, Seattle City Council passed a major upzone of the
U District to increase development capacity in anticipation of light
rail service.
Development
Capacity Pre- 11,300 9,900
Rezone
2035 Projection
12,900 31,000 11,000
with Rezone5
Development
Capacity with 17,700 17,800
Rezone
3
Development capacity represents a theoretical maximum level of development
possible if all buildable parcels were redeveloped to the legally allowable limit. This
figure should not be construed as a likely outcome.
3
Estimated based on housing unit quantity. The average size of households in
the University Community Urban Center was 2.32 according to the 2015 Seattle
Comprehensive Plan Land Use Appendix.
4
City of Seattle Urban Center/Village Growth Report, 1st Quarter 2018.
5
City of Seattle Final Environmental Impact Statement for the U District Urban
Design Alternatives, 2015.
Overview
This plan is the result of a six-month process with the goal of
coordinating major investments in public infrastructure with the
broad desires of the community. Much of the work was accomplished
through work sessions with the UDMG community volunteers and the
consultants in a “Working Group”, also referred to as the “planning
team”. During each step, the team met with SDOT and transit agency
staff among other stakeholders, referred to as the “Strategy Group”.
PLANNING PROCESS 23
This engagement provided a range of opportunities for public
participation with outreach to reach a broad and diverse audience,
ensuring that the plan outcomes reflect the values and desires of the
U District neighborhood.
Early outreach
meetings UW briefing
Figure 14. Diagram of engagement activities illustrating those that reached a broad
spectrum of participating and those that encouraged more focused involvement.
PLANNING PROCESS 25
An initial online survey with 311 respondents and the first
Community Workshop with 36 participants revealed strong
support for transit, walking, and biking as transportation modes in
the neighborhood with an emphasis on the importance of quick,
convenient transfers between bus and light rail, safe and comfortable
walking environments for pedestrians, a pedestrian oriented Ave,
emphasis on NE 43rd Street, and alleys and buffering between
cyclists and cars.
Figure 16. Community Workshop 1.
The UDMG received more than 1,760 responses during this phase.
Overall, the public expressed broad support for Scenario 2 that
envisioned a pedestrianized Ave with transit service along Brooklyn.
Support for the bold changes laid out in Scenario 2 are indicative of
the strong desire for a safe, comfortable walking environment and
convenient bus-to-train transfers expressed during the first phase of
Figure 15. Part of the results from the project.
Public Workshop #2.
The planning team also briefed the City’s Transit and Pedestrian
Advisory boards, who provided general support for the plan and
approach. However, the Transit Advisory Board expressed concern
about the construction time penalty associated with changes
to existing street designs for Brooklyn and instead supported a
pedestrian and transit mall along the Ave.
After this technical vetting, the street design concepts were refined
and discussed further with SDOT staff. The resulting planning
concept described in this plan includes recommendations and
implementation steps for a pedestrianized Ave and 43rd Street,
transit routing on Brooklyn Ave, and optimized east-west connections Figure 19. Community Workshop 3
for bicycles and transit to the station area. These were presented
to the public in Community Workshop 3 which drew more than
85 participants and online survey. In both venues, participants
expressed support for the vision and submitted additional ideas
for clearer communication and more effective implementation of
plan elements. Two areas that most concerned survey participants
were station accessibility for people with limited mobility and the
quality and ease-of-use of bicycle facilities. Feedback from survey
participants and a final round of strategy group meetings refined,
clarified, and strengthened the final recommendations which are
presented in this report.
PLANNING PROCESS 27
This page intentionally left blank
PLANNING PROCESS 29
Throughout the public engagement process, community participants
voiced a clear desire for more public space. Since the City has
substantially upzoned the District without providing adequate
park or public realm facilities, it is critical for the life of the District
that the streets, particularly the Ave and NE 43rd Street, partially
fulfill that need. Therefore, the Concept envisions these streets to
feature less vehicle traffic and increased pedestrian amenity over
time. Because the District’s many small businesses are essential to
its vitality, care must be taken to ensure that circulation changes
enhance, rather than diminish, business viability. Finally, conditions
will change dramatically and the circulation system will need to be
adaptable over time, the Concept emphasizes flexibility in terms of
street design, bus routing, and vehicle access.
Private Vehciles
NE 43rd St NE 43rd St
Roosevelt Way NE
Other Elements
University Way NE
Brooklyn Ave NE
Development coordinated
UNIVERSITY OF
WASHINGTON
Parking Reservoir
NE 41st St
NE Campus Pkwy
PLANNING PROCESS 31
through signal timing, improved crosswalks, turn restrictions, and
other measures. (SDOT)
• Explore opportunities to increase speed and reliability on an
east-west transit route on NE 45th Street when RapidRide
planning begins in 2019-2020.
• Begin collaborative planning of development between NE 45th
Street, 15th Ave NE, NE 42nd Street, and Brooklyn Avenue NE to
capitalize on circulation, provision of infrastructure and services
(utilities, etc.), and development opportunities. (Property owners,
City, community)
OUTCOMES
• Light rail station opens.
• Bus route and layover changes are made to facilitate bus/light rail
transfers.
• Northbound protected bike lane on 11th Ave NE provides safe
bicycle route through the U District.
• Improved wayfinding throughout U District.
• Improved safety, security, and street civility in the U District.
OUTCOMES
• The Ave becomes more pedestrian friendly with some
improvements.
• NE 43rd Street becomes a lively pedestrian route with the
potential for westbound transit connections.
OUTCOMES
• The Ave becomes a pedestrian street and a regional attraction,
celebrated for its lively and engaging walking environment.
• Improvements on the District’s periphery (e.g.: University Way
north of NE 50th Street and near the University Bridge) enhance
connections to neighboring communities.
PLANNING PROCESS 33
This page intentionally left blank
NE 43rd Street — 42
Brooklyn Avenue NE — 46
OTHER PROJECTS
Improve Pedestrian and Transit Conditions on NE 45th Street — 51
CURRENT SDOT
CLASSIFICATIONS
• Street Type: Urban Village
Neighborhood
• Street Classification:
Collector Arterial
• Transit Classification: Major
Transit Route
OBJECTIVES
• Maintain the Ave as the District’s primary pedestrian and business
focus.
• Provide for the needs of businesses.
• Create an attractive and welcoming setting for activity.
• Maintain a safe, civil, and inviting street culture.
• Remove unnecessary vehicle traffic.
PLANNING PROCESS 37
expressed concern that loss of buses on the Ave would hurt their
businesses. Another transit routing option to consider is a one way
loop system with buses heading north on Brooklyn and south on the
Ave.
ACTIONS:
• Continue to address street dependency and homeless concerns.
ACTIONS:
• Restrict private vehicles on the Ave.
• Reroute buses to adjacent streets.
• Construct street improvements to complete pedestrianization.
The design should minimize the need for pavement replacement
and expensive drainage and utility modifications.
• Establish a partnership to manage and maintain the space.
PLANNING PROCESS 39
Figure 25. Long-term vision for the Ave.
Figure 26. Long-term vision for fully pedestrianized Ave – conceptual section.
PLANNING PROCESS 41
NE 43RD STREET
Summary Overview
NE 43rd Street from Brooklyn Avenue NE to 15th Avenue NE will
connect the new light rail station to the Ave, most bus lines, and the
University campus, making it a primary pedestrian connection with
Figure 28. NE 43rd Street. pedestrian volumes of likely over 20,000 people per day. (As noted
earlier, rail transit will produce between 100 and 150 boardings and
alightings per train at peak times. See the Existing Conditions and
Projections section). Based on conservative figures, it appears that
SDOT STREET these pulses in pedestrian traffic, accompanied by general increases
CLASSIFICATION in pedestrian movement due to future development, will require a
combined effective walkway width of at least 40’ on NE 43rd Street
• Street Type: Urban village
for comfortable pedestrian movement.
neighborhood.
• Street Classification: Although King County Metro will not begin route planning in the
Collector arterial. U District until 2019, there is an informal proposal to potentially
route the number 44, 48, and 49 bus lines from northbound 15th
• Transit Classification: Not
Avenue NE, westbound along NE 43rd Street with a stop at the light
designated.
rail station, and then northbound on 12th Avenue NE with layover
in front of the UW garage. The community has expressed a strong
preference for NE 43rd Street to be pedestrian priority. However,
routing a maximum of two electrified bus lines along NE 43 may be
compatible with a robust and attractive pedestrian environment.
However, there may be difficulties with routing buses along NE 43rd
Street. For example, the intersection at NE 43rd and 15th will also
need to accommodate the University Bookstore parking entrance
and high pedestrian volumes. Similarly, the intersection at University
Way NE and NE 43rd may become a barrier because autos exiting
the Bookstore turning onto the Ave will often be obstructed by high
pedestrian volumes. Therefore, in the long-term, bus circulation
along NE 43rd may be undesirable from a transit speed and reliability
perspective.
OBJECTIVES
• Accommodate the high volume of pedestrians from the light rail
station and create an attractive pedestrian environment with
ample pedestrian space.
• Accommodate limited bus traffic (in the short-term) and service
vehicles on the street.
• Create an attractive visual and spatial connection between the
UW campus, the ST station, and the community.
• Provide for service vehicles and access to the University
Bookstore parking lot.
PLANNING PROCESS 43
Short-Term Directions (2021-2025)
PRIMARY TRANSPORTATION MODES:
• Priority: Pedestrians.
• Also: Buses, service vehicles, and west bound University
Bookstore patrons and bicycles.
ACTIONS:
• Analyze intersections at NE 43rd/University Way and 43rd/15th
Avenue NE.
• Design street 2018-19. (SDOT)
• Reconstruct street when Metro strain poles are installed for
electrification.
CONCEPT:
• Similar to short-term but with additional streetscape amenities.
• The University Bookstore vehicle entrance may move to 15th
ACTIONS:
• Review access and modal circulation when the Bookstore
property redevelops.
• Ideally, reroute buses to Brooklyn Avenue NE to facilitate
movement.
Figure 32. Conceptual illustration of NE 43rd Street looking east toward the campus.
PLANNING PROCESS 45
BROOKLYN AVENUE NE
Summary Overview
Brooklyn Avenue NE (Brooklyn) is currently much quieter than the
Ave, both in terms of pedestrian traffic and commercial activity.
But with the new light rail station and projected development, its
complexion is likely to change. From NE 43rd Street to NE 45th Street,
Figure 33. Recent improvements on
station improvements will reconfigure the roadway to encourage
Brooklyn Avenue NE.
private vehicle pick-up and drop-off but will not allow bus circulation
along the station’s most prominent side.
OBJECTIVES
• Provide excellent access to the light rail station, especially for
pedestrians, bus transfers, and cyclists.
• Accommodate multiple modes including buses, pedestrians,
bicycles, and private vehicles.
• Create an accessible pedestrian environment and positive
development by providing an attractive streetscape setting.
• Support a “Green Street” connection to new waterfront park at
the south of Brooklyn.
ACTIONS:
• South of NE 43rd Street, complete bicycle
lane between 41st Street and 43rd Street and
increase landscaping to support Green Street
concept. Street improvements will be constructed
with private development and should not limit
potential for buses in travel lanes.
• Improve intersection at Brooklyn and NE 45th
Street to support pedestrian and bicycles.
• Make adjustments to right-of-way facilities
(including, but not limited to, ramps, sidewalks, Figure 35. Bus layover spaces on Brooklyn Avenue NE.
and signals) to comply with Americans with
Disabilities Act.
• Provide for bicycle parking including dockless bike share or other
short-term uses.
PLANNING PROCESS 47
Long-Term Directions (2021+)
The recommended design for Brooklyn Avenue NE south of NE 43rd
Street includes a bicycle lane and ample landscaping in support
of the street’s “Green Street” designation. Because Brooklyn has a
70’ right-of-way, there is space for vehicular and bicycle movement
along with ample landscaping. The configuration of planting strip and
landscape area can vary according to locally specific conditions.
Between NE 43rd and NE 45th Streets, the street design should allow
for direct bus to rail transfers. The bicycle lane is not continued on
this block to reduce pedestrian/bicycle collisions. While the station
will be an important destination for cyclists, those traveling through
the area will likely choose the protected bicycle lanes on 11th
Avenue NE and Roosevelt Way NE. The following diagram illustrates
Figure 37. Long-term vision for Brooklyn Ave NE south of NE 43rd Street. The
cross section is very similar to recent improvements except there are sharrows
southbound.
Figure 36. Envisioned street section for Brooklyn Avenue NE between NE 43rd and
NE 45th Streets.
ACTIONS:
• Reroute appropriate buses to Brooklyn Avenue NE and make
necessary infrastructure improvements.
• Reconstruct streetscape in front of the light rail station to
facilitate transfers and pedestrian access. (This may be done
when the UW develops site over transit stations if the UW tower
is not completed by 2021.)
PLANNING PROCESS 49
This page intentionally left blank
OBJECTIVES
• Improve pedestrian crossings across NE 45th
Street. Figure 39. NE 45th Street at the I-5 overpass.
Figure 41. Proposed pedestrian and bicycle route from Wallingford to the light rail
station and UW.
OBJECTIVES
• Better utilize alleys for circulation and other activities as well
as solid waste removal and service delivery. This should be
accomplished by requiring new development to locate service
areas for solid waste and deliveries within the building shell and
to provide “eyes on the alley” by including windows facing the
alley and, where feasible, adding building entries from alleys and
making use of alley spaces for outdoor dining and other activities.
• Improve the cleanliness and attractiveness of alleys.
• Provide better east-west pedestrian circulation through mid-block
passages through new development.
ACTIONS
• Continue to implement the District’s Alley Activation program.
• Implement the design guidelines for alleys that call for internal
waste storage and upper level windows for “passive surveillance”
that make alley activities more visible.
• Continue to assertively implement design guidelines/
requirements for new development to provide mid-block
connections and improved alleys.
• Continue to explore ways for businesses to use the alleys more
effectively.
OBJECTIVE
• Facilitate movement of all travel modes in this area which
includes several complex intersections.
ACTION
• Initiate a transportation planning study for this area.
ACTION
• Initiate a community-led study to identify a preferred concept for
this stretch of University Way NE.
The U District Station Area Mobility Plan will identify the community’s
vision, goals, and preferences regarding mobility improvements
that will occur in the near- and long-term future. The plan describes
a holistic, comprehensive circulation vision for the District with
a rational and flexible strategy for achieving the community’s
goals. This adaptive management approach will enable community
stakeholders to continue to work collaboratively with the City and
transit agencies as the U District and its supporting infrastructure
change dramatically over time.
SUMMARY OF RECOMMENDATIONS 57
PARTICIPANTS
1. Prepare a U District Shared Mobility Hub Plan that builds on Seattle Community,
GENERAL TRANSPORTATION
this plan, analyzes key intersections, informs the Metro Transit Department of Metro
route planning (to be initiated in 2019), provides the necessary Transportation
information for street design, includes a parking strategy, provides (SDOT)
for pedestrian needs, incorporates bicycle facilities’ objectives,
and identifies measures to provide access to the station and key
activities (e.g.: small businesses, the UW, the University Bookstore,
etc.).
2. Begin Metro bus route planning (2019). Address community Metro SDOT,
concerns including diesel bus impacts to the Ave, congestion at Community
key intersections, adequate street pavements for buses where
needed, impacts of bus layovers, options to layover buses at other
TRANSIT
4. Design and construct NE 43rd Street from Brooklyn Avenue SDOT Community,
to 15th Avenue NE improvements to support future pedestrian Businesses
volumes. If necessary, accommodate transit routing as a
temporary measure. Congestion may make this route problematic
and a pedestrian orientation is preferred. Work with adjacent
property owners (especially the University Bookstore) to ensure
access and integrate development with the streetscape. Construct
STREET IMPROVEMENTS
10. Continue to support and provide resources to a public realm SDOT, Businesses,
COMMUNITY DEVELOPMENT
11. Use the U District as one of the pilot areas for upcoming SDOT SDOT Community
wayfinding plan.
12. Use the U District as one of the pilot areas for upcoming SDOT Businesses, SDOT, SDCI
wayfinding plan. (Community businesses for the alley activation Community
and SDOT, Office of Planning and Community Development,
and Seattle Department of Construction and Inspections for the
development provisions.)
SUMMARY OF RECOMMENDATIONS 59
PARTICIPANTS
15. Operate buses on the Ave with battery power only or remove Metro
from this street.
TRANSIT
17. Construct first phase of the Ave improvements between NE Community, SDOT
42nd Street and NE 45th Street. Businesses
18. Improve pedestrian and bicycle crossing of I-5 with east-west SDOT
bike routes on NE 45th Street.
PHASE 2 - 2021-2028
19. Plan and construct pedestrian improvements to the Ave north Community, Farmers
STREET IMPROVEMENTS
22. Conduct planning process for future mid-week Farmers Community OPCD
OTHER
Market.
23. Remove buses and private vehicles from the Ave and Metro, Businesses
complete substantial pedestrian improvements between NE 45th Community,
STREET IMPROVEMENTS
25. Complete Brooklyn Avenue Green Street improvements with SDOT Property
northbound protected bike lane south of NE 43rd Street and north owners
of new 45th Street, extensive landscaping, and compatibility with
buses.
NE 53rd St to Ravenna,
SAFETY ISSUES
Mapleleaf, & Bicycle and Pedestrian Safety
Northgate Analysis challenging intersections
NE 52nd St (top 20 in Seattle)
UNIVERSITY
HEIGHTS Pedestrian
11th Ave NE
12th Ave NE
Bicycle
Brooklyn Ave NE
NE 50th St
7th Ave NE
20,800
UNIVERSITY HIGH VOLUME AREAS
5th Ave NE
PLAYGROUND
Daily Bus Boardings
0 - 68
10,200 11,500
16th Ave NE
15th Ave NE
69 - 239
¦
¨
§ 5 NE 47th St 714 | 2,398 240 - 564
8th Ave NE
9th Ave NE
123 | 237
565 - 1,167
University Way NE
1,168 - 1,876
to Ballard &
Wallingford Pedestrian Volumes
33,600 NE 45th St Width indicates relative #
27,300 of pedestrians in a day.
Potential route Counts only taken on some
9th Ave NE
Bicycle Volumes
UNIVERSITY OF
Pasadena Pl NE
George Washington Ln
Vehicular Volumes
NE Campus Pkwy
NE 40th St NE Pacifi Major arterials. All but 15th
c St Ave NE are freight routes.
NE 40th St Width indicates relative
E
502 | 691
NE 40th St
N
to Eastlake volume.
NE N & downtown Burk 172 | 295
ve
orth e Gi Grant L
lake Average annual weekday
th A
11th Ave NE
12th Ave NE
RR ROOSEVELT
Transit assumptions
“Fixed” route
Brooklyn Ave NE
NE 50th St
7th Ave NE
15th Ave NE
“Fixed” route option for
16th Ave NE
UNIVERSITY more direct transfer
5th Ave NE
PLAYGROUND
“Flexible” route; direct
University Way NE
transfer desired. These
routings are explored in
the scenarios and
¦
¨
§ 5 NE 47th St influence designs of:
8th Ave NE
9th Ave NE
• NE 43rd St,
• The Ave, and
• Brooklyn Ave NE.
EASTSIDE/RR 23RD
FUTURE and will have additional
U DISTRICT construction impacts.
STATION
NE 43rd St Other proposals
NE 43rd St
CHRISTIE Activate and utilize alleys
Roosevelt Way NE
PARK
Through-block passages
with redevelopment
NE 42nd St
NE 45th St traffic flow
UNIVERSITY OF options
Pasadena Pl NE
NE 42nd St WASHINGTON
Safe and comfortable
5th Ave NE
intersection crossings
8th Ave NE
George Washington Ln
for transfers
NE 41st St
U DISTRICT Safe and comfortable I-5
P-PATCH crossing for pedestrian/bike
NE Campus Pkwy
NE 40th St NE Pacifi
c St East-west bike route
RR BOTHELL
NE 40th St
N
orth e Gi Grant L
lake
th A
* “Fixed” is used loosely to indicate routes that do not need a Feet Farmers Market and
direct transfer at the station or already have one on NE 45th St. 0 150 300 600 n promenade to Cowen Park
Metro and SDOT are in various planning stages, with much to
be determined in 2019.
** “Flexible” routes benefit greatly from having a direct
transfer at the station and are shifted into various
APPENDICES 63
64 U DISTRICT STATION AREA MOBILITY PLAN
APPENDICES 65
66 U DISTRICT STATION AREA MOBILITY PLAN
Appendix B. Results From Public Engagement Activities
Walking Tour 9/7/17 - General public 40+ Neighborhood walking tour of key Familiarity with neighborhood
- Working Group sites in the core U District where concerns, announcement of the
- Transit agencies station area mobility is a concern. project, introduction to the Working
- Elected leaders: Methods: narrative from several Group.
- - Rob Johnson speakers, questions & answers, 12-
- - Mike O'Brien page tour handout.
- - Larry Gossett aide
- Local Media
U District BIA 1/18/18 - Business 35+ Presentation to the BIA with Update funding partner on status of
Improvement project details, status of grant project, garner support, and invite
Association application. Methods: presentation, participation.
- Coalition partner questions & answers, handout.
- Local businesses
Northeast 2/1/18 - Community group 15+ Presentation to regional district Update regional neighborhoods on
District Council - Adjacent councils about the project and status of project, garner support, and
neighborhoods invite to participate. Methods: slide invite participation.
presentation, project handout,
narrative, questions & answers.
U District Small 2/12/18 - Local businesses 10+ Presentation to local business Update key small businesses on status
Businesses & association's steering committee of project, garner support, and invite
Nonprofits about the project and invite to participation.
participate. Methods: slide
presentation, project handout,
narrative, questions & answers.
Online Survey 1 2/14/18 - - General Public 311 25-question online survey to ask Baseline data on how participants
4/10/18 how participants get around the U move around the district and how they
District currently and their plans in would expect to in the future:
the future. Methods: online survey - Strong support for direct transfers
with 25 questions. from buses to station
- Pedestrian safety and comfort
- Buffering between cyclists and cars
U District 2/14/18 - Community group 13+ Presentation to local community Update key community council on
Community - Coalition partner council about the project and status of project, garner support, and
Council invite to participate. Methods: slide invite participation.
presentation, project handout,
narrative, questions & answers.
Strategy Group 2/16/18 - Strategy Group 18+ Presentation of draft outreach plan Received feedback and answered
Meeting and survey for feedback. Methods: questions regarding draft outreach
agenda, draft plan and survey, plan and online survey from Strategy
timeline, questions & answers. Group members.
U District 2/20/18 - Coalition partner 24+ Presentation to local program Update community group of property
Partnership manager board about the project owners on status of project, garner
Board Meeting and invite to participate. Methods: support, and invite participation.
slide presentation, project
handout, narrative, questions &
answers.
APPENDICES 67
Event Name Date Groups Reached Participants Methods Outcomes
(estimated)
Community 3/7/18 - General Public 35+ Community workshop with - Walking, transit, biking are priority;
Workshop 1 - Strategy Group preliminary informal sharing of - Quick and easy transfers, quality
- UW Students information and a mapping walking environment, separated
exercise, followed by a bikeways;
presentation, large-group - Good design needed for seniors,
brainstorming, small-group disabled;
mapping exercise and report out.
Methods: mapping, question
boards, slide presentation, group
brainstorming, small group table
exercise, and report out.
UW Real Estate 3/13/18 - Coalition partner 15+ Meeting to discuss progress on Feedback from UW on developing plan
& Capital - Institutional leaders community outreach and and community priorities.
Planning & developing plan priorities.
Development Methods: Questions and answers,
feedback.
Strategy Group 3/26/18 - Strategy Group 19+ Review of workshop 1 and survey Update on transit agency timelines,
Meeting 1 results, presentation of status of suggestions for improved outreach,
project. Methods: presentation, feedback on workshop and survey 1.
agenda, handouts, brainstorming,
questions and answers.
U District Small 3/27/18 - Local businesses 8+ Presentation to local small Update key small businesses on status
Businesses & business association steering of project, garner support, and invite
Nonprofits committee about the status of the participation.
project and an invitation to
participate. Methods: Presentation,
questions & answers, handout.
Also a presentation by U District
Let's Go.
Ravenna-Bryant 4/2/18 - Community group 75+ Table to update citizens on status Familiarize adjacent neighbors with the
Community - Adjacent of project with maps and handouts. project and invite to participate.
Council Annual neighborhoods Methods: poster, maps, handouts,
Meeting questions & answers.
Community 4/3/18 - General public 70+ Community workshop with update - Strong support for pedestrianized Ave
Workshop 2 - Strategy Group on project and call for feedback - Attractive public realm
- UW Students with priority setting. Methods: - Pedestrian-friendly NE 43rd Street
- Local Media open house to answer questions, - Direct transfers between buses and
slide presentation, small group station
discussions, report out, handouts, - Brooklyn green street received 1 vote
maps.
Presentation at 4/4/18 - UW students 22+ Presentation to college course Familiarity with project among
Pedestrian focused on pedestrian mobility. students and invitation to participate in
Travel, Land Use Methods: presentation, handouts, the process.
and Urban Form questions and answers.
(UW Course)
Meeting with 4/10/18 - Elected leaders 11+ Presentation of project status and Networking suggestions for success of
Councilmembers introduction to three scenarios, project, next steps, request for support
Johnson & summary of community feedback of project for implementation.
O’Brien and requests for support. Methods:
presentation, questions & answers,
brainstorming.
Online Survey 2 4/10/18 - - General public 308 Multi-question online survey to ask - Strong support for Scenario 2 -
5/30/18 for feedback on proposed pedestrianized Ave
scenarios, community priorities, - Efficient & reliable bus routing
and street preferences. Methods: - Direct bus to station transfers
online survey with several - Attractive and safe public realm
questions. - Pedestrian-friendly NE 43rd Street
University Park 4/18/18 - Community group 20+ Presentation to neighborhood Familiarization with the project and
Community Club - Adjacent community group about the invitation to participate.
neighborhoods project. Methods: slide
presentation, questions & answers,
and brainstorming.
The Doorway 4/22/18 - General public 50-200 Table to update citizens on status Familiarity with the project.
Project Pop-Up - Homeless youth of project. Methods: questions &
Café answers.
Transit Advisory 4/25/18 Official City- 20-40 Methods: presentation to group - Generally supportive of plan;
Board sponsored Advisory with handouts, questions & - Prefer transit mall on the Ave
Board answers.
U District 5/2/18 - Local businesses 5-10 Presentation on status of project - Street civility chief concern;
Property and and request for feedback on major - Short-term parking a major concern
Small Business concerns and ideas. Methods:
Owners – narrative, questions & answers.
meeting 1
U District 5/3/18 - Local businesses 10+ Presentation on status of project - Street civility chief concern;
Property and and request for feedback on major - Short-term parking a major concern
Small Business concerns and ideas. Methods:
Owners – narrative, questions & answers.
meeting 2
UW Real Estate 5/3/18 - Coalition partner 8+ Status update on project. Methods: - Generally supportive of long-term
& Capital - Institutional leaders presentation, questions & answers, vision for the Ave, 43rd;
Planning & invitation to participate. - Priority on great transit service to UW
Development
Design Charrette 5/8/18 - City staff 50+ Stakeholder design charrette Familiarization with project,
- Transit agencies (focused working session). coordinated strategy concepts and
- Strategy Group Methods: presentation, charrette networking, brainstorming ideas and
- Elected leaders: (small groups), brainstorming, feasibility concerns.
- - Rob Johnson prioritization of next steps.
- - Larry Gossett aide
Pedestrian 5/9/18 Official City- 20-40 Methods: presentation to group - Generally supportive of plan
Advisory Board sponsored Advisory with handouts, questions &
Board answers.
U District 5/19/18 - General public 1,700+ Presentation to community Overwhelming support for scenario 2,
Streetfair Booth & - Coalition partners members and general public at to pedestrianize the Ave and NE 43rd
5/20/18 annual U District Streetfair over Street. Familiarization with the project
two days. Methods: two voting by citizens at Streetfair.
exercises to prioritize community Encouragement to attend the final
goals and evaluate and select community workshop.
preferred mobility scenario,
questions & answers, invitation to
final community workshop. Multi-
language support.
APPENDICES 69
Event Name Date Groups Reached Participants Methods Outcomes
(estimated)
Community 5/30/18 - General public 85+ Community workshop with update - Support for long term vision;
Workshop 3 - Strategy Group on project and call for feedback - Featured a presentation of new Ave
- UW students with priority setting. Methods: pedestrian count research by Dr.
- Media open house to answer questions, Berney’s class
slide presentation, small group
discussions, report out, handouts,
maps.
Online Survey 3 6/20/18 - - General public 263 Multi-question online survey to ask - Support for long term vision and
7/31/18 for feedback on proposed implementation steps.;
scenarios, community priorities, - Concern about accessibility and bike
and street preferences. Methods: routing
online survey with several
questions.
Meeting with 8/16/18 - Elected leaders: 9+ Status update on project and - Legislative Aides offered advice for
Councilmember - - Rob Johnson aide leading community priorities. rollout strategy
Staff (Amy Gore) Methods: Presentation, questions - discussion of legislative and political
- - Lisa Herbold Aide & answers. processes that will have a role in
(Newell Aldrich) implementation
Meeting with 8/17/18 - Elected leaders: 9+ Status update on project and - Recommendations for follow-up
Mayor's Office - - Mayor Durkan aide leading community priorities. strategies to speed implementation
(Ahmed Durrat) Methods: Presentation, questions - Recommendations for funding
& answers. programs and planning initiatives to
pursue
- Overall positive reaction to plan;
many of the plan implementation steps
can be funded with existing
programs/projects if there is good
coordination
U District Small 8/29/18 - Local businesses 8+ Presentation on status update of Update key small businesses on status
Businesses & project and pending release of of project, acknowledge their
Nonprofits final plan. Methods: narrative, participation and support, announce
questions & answers. pending release of plan.
U District 9/6/18 - Coalition partner 8+ Presentation on status update of Specific requests for revisions to draft
Partnership Staff project, feedback on suggested plan, exploration of future
revisions to draft plan, invitation to collaboration on project.
collaborate. Methods: narrative,
questions & answers,
brainstorming.
APPENDICES 71
TRANSIT ADVISORY BOARD
700 Fifth Avenue, Suite 3800 | PO Box 34996 | Seattle, WA 98124-4996 | T 206.684.ROAD (7623) | www.seattle.gov/transportation
72 U DISTRICT STATION AREA MOBILITY PLAN
APPENDICES 73
KING COUNTY METRO
Department of Transportation
Metro Transit Division
Service Development
201 South Jackson Street
KSC-TR-0413
Seattle, WA 98104-3856
ing ounty Metro Metro fixed route service and route facilities play a key role in the future of
rd
transportation in the U-District with the introduction of Link light rail at rooklyn ve and
treet in .
Metro appreciates the active role it played in the U-District trategy group with representatives from
the oute acilities and ervice lanning workgroups attending planning meetings, design charrettes,
and community workshops. he dialogue and discussions in these meetings and workshops will
contribute to future outreach for Metro pro ects in the U-District Link light rail station area.
uture pro ects within the U-District tation rea include the orthgate Link service restructure, Metro
apid ide speed and reliability improvements, and trolley bus infrastructure to connect ad acent trolley
routes to the station and layover. n addition, Metro is coordinating with the eattle Department of
rd
ransportation D to redesign treet, improving the connection from the University of
Washington ampus to the U-District station, and on intersection spot improvements to improve safety,
and the speed and reliability of transit operations. Metro also has set a goal of having an all-electric bus
fleet by . How this goal would be achieved and implemented in the ity of eattle along routes
travelling to and through the U-District is still in development.
ach of these pro ects has its own internal and external process for outreach, approval, design, and
construction. s these pro ects are further defined, Metro will review existing city and agency plans and
polices, to insure they are feasible and consistent with community feedback and goals. n addition,
Metro will review the work of the U-District mobility group, the University of Washington and other U-
District stakeholders to ensure all prior planning efforts in the area are considered.
APPENDICES 75
U DISTRICT PARTNERSHIP STAFF
Subject: Re: U District Mobility – Executive Summary and Recommendations DRAFT Comments
As a major funder of and participant in the U District Station Area Mobility planning effort, the U District
Partnership staff appreciates the opportunity to provide comments on the draft Executive Summary and
Summary of Recommendations for the U District Station Area Mobility Plan. These summaries reflect an
exciting and dynamic set of opportunities for the further improvement of our neighborhood for the
benefit of the entire community. We applaud the diligent hard work of the team of volunteers who led
this initiative and carried the project from an idea, through community and stakeholder meetings, to the
current draft report. With that said, we would like to draw your attention to a few recommendations for
changes to the document before its final publishing.
First, we acknowledge the exemplary effort of the U District Mobility Group to invite members of
the U District community to participate in the planning process and we strongly support the
emphasis in the document to continue to include the community in both the further discussion
and implementation of the recommendations within. However, we have major concerns with
two aspects of how the community voice is represented in the document. The document both
overstates the breadth of the community which participated during the planning process and
the level of their support for several of the recommendations. In particular the wording of,
“There was overwhelming public support for transforming University Way NE (the Ave) into a
pedestrian street from NE 42nd Street to NE 45th Street in the long term” does not properly
account for the dissenting opinions which have been expressed by U District community
members against this proposal. We believe that this comment should be amended to say that
there was, “strong support amongst the participants in the planning process for…”. Similarly, the
description in the first paragraph of the makeup of the U District Mobility Group leads the
reader to believe that several U District small business owners were a part of the working group
and that their recommendations could therefore be assumed to be representative of the entire
small business community.
In the paragraph titled “Configure an efficient, flexible bus route network” we recommend that the
fifth sentence, concerning the conditions to take into account during future bus transit planning,
be expanded. It is vitally important that engagement also specifically mentions property owners
and developers in this section, especially considering the multiple properties currently being
developed on Brooklyn and the other streets surrounding the future light rail station. To not
proactively engage this community could cause unnecessary barriers in the implementation of
the community’s preferred route changes and other street level improvements.
The paragraph titled, “Create a safe and attractive street environment” should make sure to
mention that these plans must accommodate people of all abilities. This could also be expressed
earlier in the document, if the authors believe it better fits there.
Point 9. More context is needed around this point and how it fits into the mobility plan. The
connections may have been obvious to participants in the planning process but are probably not
clear to a first time reader.
Point 10. The U District Partnership has established and currently runs a robust public realm
maintenance and management program for the U District through its critically important Clean
and Safe work. There is no need to initiate a new program, but a recommendation for
community support to continue and expand the program would be welcomed.
Point 14. This should be written that businesses should be thoroughly engaged and aggressively
recruited to expand their involvement in future planning around transportations changes that
are likely to impact them.
Point 18. This point needs to be more specific. Is this sentence implying support for an additional
bike and pedestrian bridge over I-5 or improvements to the current infrastructure at 45th?
Point 22. This sentence should be expanded to recommend that the community, “Conduct planning
process for future mid-week Farmers Market which will ensure adequate space and
accommodations”.
Point 23. While we observed strong support among participants in the planning process to prioritize
pedestrian traffic and access to amenities on the Ave, we do not necessarily believe that this
represented a direct support for the exclusion of buses and private vehicles.
The second paragraph of the Summary of Recommendations should include an explanation of the
extent of the roles that the agencies and organizations in the Lead and Other Participant
columns are expected to take and the reasoning for their selection. It is not clear whether these
assignments are recommendations based upon the Mobility Group’s view of which one is best
situated to carry out the particular Actions or if they represent commitments by these groups.
We ask you to strongly consider our recommendations in the remainder of your editing process. We
look forward to the release of the final version of the Mobility Plan and when it is available, we plan to
send it to the appropriate U District Partnership board committee for them to comment upon as
necessary.
APPENDICES 77
SEATTLE NEIGHBORHOOD GREENWAYS
To: The U District Mobility Group
From: Seattle Neighborhood Greenways
Date: August 3, 2018
Subject: Re: U District Mobility – Executive Summary and Recommendations DRAFT Comments
Hello,
Big moves: We urge the consultants to capitalize on of people's willingness to re-envision how they get
around and interact with the University District just after the light rail station opens. To that end, we
believe we should do as much as possible to bring about the final vision of a pedestrian only Ave and
43rd with buses on Brooklyn as soon as possible after the station opens. Therefore, we recommend the
report strike recommendations 14 and 17 from the "mid term" recommendations, and move 23 and 24
from the "long term" to the "mid term" section. Perhaps a more appropriate "long term" element would
be final hardscape construction of the Ave and 43rd as pedestrian only streets (whereas earlier
improvements could simply leave the existing curb and gutter in place while adding tables, benches,
planters, etc).
The risk of not moving the pedestrianization elements earlier is very high. I was just talking to the
mayor's office today and they were commenting how a five year old transportation plan was hopelessly
out of date. Ten years from now most, if not all, of the community members, advocates, and elected
leaders who helped craft this vision will have moved on. Now is the time to push for a bold
implementation despite the hurdles that we face. There will always be hurdles, but we risk loosing
momentum and missing the key window of opportunity of the rail station opening to change hearts and
minds. Let's not miss this opportunity and have to wait another 50 years.
I-5 pedestrian/bike crossing improvement: Market rapid ride is set to open in 2022 but still in pre-
concept. We should make sure the planning for this happens early enough that if there are possible
smaller cost improvements to crossing I-5 that contribute to the rapid ride vision that we can go after
funding to make those small quick changes happen.
Thank you,
-Gordon Padelford
(206) 963-8547
Executive Director
Seattle Neighborhood Greenways
Website - Twitter - Facebook