R057-Ac-It-001 (C) - Inspection and Test Plan For Instrument Air Compressor Package
R057-Ac-It-001 (C) - Inspection and Test Plan For Instrument Air Compressor Package
Approved
: as Noted
Not Approved
SH
HH
HH
HH
PM
APPROVED
ORBIDDEN
NSORTIUM
VENDOR : CONTRACTOR :
CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES CONSORTIUM
CAPACITY 4000 BBL/DAY
AT RASHIDPUR, BAHUBOL, HABIGANJ, BANGLADESH PT. ISTANA KARANG LAUT
1 X X 41
2 X X 42
3 X X X 43
4 X X 44
5 X X 45
6 46
7 47
8 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80 Sheet Number :
Employer Document Number : Contractor Document Number: Fabricator Document Number: 2 Sheet
OF Number
2 :
222-Q-PL-3000-01 R057-AC-IT-001 2 of 5
NSORTIUM
RANG LAUT
eet Number :
2 Sheet
OF Number
2 :
2 of 5
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-00
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. :C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -
1.2 Piping & Instrumentation Diagram (P&ID) PO & User's Specifications P&ID Approved P&ID H R
GA Air Compressor
1.3 General Arrangement of Instrument Air Compressor Package PO & User's Specifications Approved GA Package H R
Package
1.6 Approval of FAT Procedure PO & User's Specifications FAT Procedure FAT Procedure H R/A C
2.1 Review of Instrument Calibration Certificates and/or CoC User's Specifications Certificates Certificates H R
Page 3 of 5
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-00
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. :C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -
Approved
3.1 Air Compressor Package Assembly - - H M
Construction GA Drawing
Calibration Calibration
6.1 IMTE Review Approved FAT Procedure H R
Certificates Certificates
6.2 Factory Acceptance Test (FAT) Approved FAT Procedure FAT Report FAT Report H W
Page 4 of 5
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-00
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. :C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -
6.3 Records Approved FAT Procedure FAT Report FAT Report H R/A C
Inspection Release
7.1 Final Inspection Before Shipment Packing & Preservation Inspection Note H H
Note
8.1 Final Review and Certification of MDR Agreed MDR TOC MDR MDR H R/A C
Legend:
Hold Point ( H ) : An inspection, test, non-destructive examination or fabrication operation that must be witnessed by a specified party prior to subsequent fabrication. Operation sequences at the requ
hold point shall not be continued prior to having been examined and released by a specified party
Witness Point ( W ) : An inspection, test, non destructive examination or fabrication operation that is designated to be witnessed by a specified party unless otherwise permitted in writing by the specified party to p
the activity. The specified party must be notified sufficiently in advance prior to performing the designated operation
Monitor Point ( M ) : Monitor the Inspection which on random/sampling nature. Notification may not be required
Review Point ( R ) : An inspection which is conducted by reviewing as system or document related to i.e. reviewing RT films, reviewing ITP or reviewing of quality system
Page 5 of 5
: R057-AC-IT-001
: 30-Dec-16
Page 6 of 5
: R057-AC-IT-001
: 30-Dec-16
Page 7 of 5
: R057-AC-IT-001
: 30-Dec-16
must be witnessed by a specified party prior to subsequent fabrication. Operation sequences at the required
sed by a specified party
s designated to be witnessed by a specified party unless otherwise permitted in writing by the specified party to proceed
o performing the designated operation
ay not be required
Page 8 of 5