Professional Documents
Culture Documents
CVS Superflexible Eaf
CVS Superflexible Eaf
-From Roll Stands and water quenching system to complete Rolling Mill
Train,
The main target of training on the customer’s site is to familiarise their personel
with hands-on operation ofthe supplied machines and equipment.
The operators and maintenance personel are trained step by step to prepare
them for successful operation of the equipment.
Area of Activities – CONSULTANCY
Steel Structure:
Shop drawings
Supervision of fabrication
• TTT : 40 – 45 min.
• Charging : 3 min.
• Tapping : 3 min.
• Preparation : 4 min.
(EBT filling, gunning, etc.)
Power - off Time : 10 min.
Power - on Time : 30 min.
TTT : 40 min.
Plant layout concepts
The EAF is of “Full Platform” type i.e. with electrode lifting column
support and the roof lifting and turning machinery mounted on the
tilting platform.
Shell upper part of cage type and water-cooled panels with cover
plates in order to minimise air inlet.
Mechanical Design Features
Split-shell design
High-impedance furnace
The lance manipulator for the Electric Arc Furnace is primarily designed for
safe oxygen injection. Same manipulator is used for carbon injection as
well.
• Optimum size
• Essential part of the
secondary metallurgy
treatment
LF Advantages
• Saving of ferroalloy
• Saving of energy
• Increase productivity
• Decreasing refining time of EAF
• Decreasing tapping temperature at EAF
• Precise temperature control
• Improved of inclusions, cleanliness of the
steel
• Possibilities of wrong analysis limited
LF Design Advantages
• In the last few years, CVS has supplied nr. 3 same size
EAF’s.
• One of those projects was also a complete “turn-key”
green-field project and it has been completed in 16
months.
• The three EAF’s are using in the range of 90t to 150t
liquid steel without modifications. Since many
restrictions at their beginning stage of start-up. 160t is
expected in the near future either with high bulk
density scrap or with 3 charges.
• These superflexible approach to steel making practise
is giving significant advantages to investers in terms
of their present and future’s plans.
CVS - AUTOMATION
EAF & LF– Arc Regulation System
Arc Regulation system (ARS) for
EAF applications is the latest stage
of development which using PC
based Windows XP operating
system.
Start-up in 18 months
from signing of the contract
CVS -
TOSCELIK PROJECT
TOSYALI holding was one of the leader company in Turkey especially in pipe
production. They decided to make new meltshop and rolling mill investment for
long production and slab production. They awarded CVS for comple turnkey
solution.
• Steel Structure
• SVC Unit
• 130 - 160 ton AC Arc Furnace
• Ladle Furnace
• 6 strand CCM with 9 meter radius
• 2 Strand Slab Caster (Not Suplied by CVS)
• Hot strip mill (Not Supplied by CVS)
• Fume Treatment Plant
• Water Treatment Plant
• Oxygen Plant (Not Supplied by CVS)
• Other steel plant facilities
Thank You For Your Patience
www.cvs.com.tr