DELTA SYSTECH INDONESIA Page: 2 / 15
I. KETENTUAN UMUM
40.800 m.
40.000 m.
II. BAHAN-BAHAN
2.1. Beton
Balok Pelat
* Mutu beton : 500 [kg/cm2] 350 [kg/cm2]
fc' : 415 [kg/cm2] 290.5 [kg/cm2]
* Modulus elastisitas : 356502.1038 [kg/cm2] 2.98E+5 [kg/cm2]
* Berat Jenis : 2500 [kg/m3]
* Tegangan ijin
- Keadaan awal (Kondisi Transfer)
Mutu beton saat penarikan : 80 % fc'.
fc'i = 332.0 [kg/cm2] 232.4 [kg/cm2]
Tegangan tekan : 0.55 fc'i
= 182.6 [kg/cm2] 127.8 [kg/cm2]
Tegangan tarik : -0.80 SQR(fc'i)
= -14.6 [kg/cm2] -12.2 [kg/cm2]
- Keadaan akhir (Kondisi Servis)
fc' = 415.0 [kg/cm2] 290.5 [kg/cm2]
Tegangan tekan : 0.40 fc'
= 166.0 [kg/cm2] 116.2 [kg/cm2]
Tegangan tarik : -1.60 SQR(fc')
= -32.6 [kg/cm2] -27.3 [kg/cm2]
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 3 / 15
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 4 / 15
155
20.0
64 7.0 64 7.0
80 13.0 80 13.0
12.0 12.0
20 20
128.0 128.0
20 20
25.0 25.0
70 70
25.0 25.0
70 70
Precast Komposit
bef : - 155 [cm]
H : 210 [cm] 230 [cm]
Ac : 7523 [cm2] 10619 [cm2]
Y top : 108.8 [cm] 94.2 [cm]
Y bottom : 101.2 [cm] 135.8 [cm]
Ix : 41398803 [cm4] 72457783 [cm4]
W top composite : - [cm3] 769437 [cm3]
W top precast : 380486 [cm3] 976917 [cm3]
W bottom : 409099 [cm3] 533444 [cm3]
V. PEMBEBANAN
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 5 / 15
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 6 / 15
VI. ANALISA
6.1. Gaya Prategang
Y1 : ^ ^
11.774 101.195 cm.
jarak cgs ke serat bawah beton terluar , = 11.774 cm.
Eksentrisitas, e= 89.421 cm.
Serat atas :
σa = Pi/Ac - Pi.e/Wa + Mbs/Wa => -14.6
Pi <= 1111.130 ton. ..... (1)
Serat bawah:
σb = Pi/Ac + Pi.e/Wb - Mbs/Wb <= 182.6
Pi <= 781.057 ton. ..... (2)
Dari (1) dan (2) diperoleh Pi <= 781.057 ton. ..... (3)
6.1.2. Keadaan Akhir di tengah bentang
Serat atas :
σa = Pe/Acp - (Pe.e-Mbp)/Wap + Mbh/Wac => 166.0
Pe => 465.116 ton. ..... (4)
Serat bawah:
σb = Pe/Acp + (Pe.e-Mbp)/Wbp - Mbh/Wac => -32.6
Pe => 586.530 ton. ..... (5)
Dari (4) dan (5) diperoleh Pe => 586.530 ton. ..... (6)
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 7 / 15
6.2.1.3. Draw-in
Jarak pengaruh draw-in pada kabel,
xd = SQR(dr . Ep . Ap / m)
di mana :
dr = draw-in yang terjadi pada sistem yang dipakai,
pada sistem DSI, besar draw-in = 0.004 m.
Ep = modulus elastisitas baja prategang,
untuk strand yang dipakai, Ep = 1.95E+6 kg/cm2.
Ap = luas penampang baja prategang yang dipakai,
yaitu = 61.200 cm2.
m = penurunan gaya yang terjadi pada diagram gaya,
= 2(Pa - P2)/Lb = 2698.3 kg/m.
Sehingga diperoleh
xd = 13.301 m.
Maka,
P1 = 784.439 ton.
P2 = 801.172 ton.
P3 = 749.666 ton.
Prata = 781.087 ton.
T2pi = 12762.8 kg/cm2.
6.2.1.4. Perpendekan Elastis Beton
dTpe = n.Tst/2
i = (I/Ac)^0.5
= 74.182 cm.
Ke = (Ap/Ac) (1+e^2/i^2)
= 0.020
n= Ep/Ec
= 5.581
dTpe' = n.Ke.Tpi/(1+n.Ke)
= 1279.1 kg/cm2.
Akibat berat sendiri balok;
M= 376.150 ton-m.
dTpe = ((dTpe')-(n.M.y/I))/2
= 412.8 kg/cm2.
P2i = P2 - Ap.(dTpe)
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 8 / 15
= 775.909 ton.
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 9 / 15
dTsh = Ep.Eb.ke.kh.kp
Tebal teoritis balok = 200 mm.
Dari Australian Standard 1481-1978 didapat;
Ep = 1.99E+6 kg/cm2.
Eb = 4.00E-4 untuk kelembaban = 70.0 %.
ke = 0.800
kh = 0.868 untuk penarikan = 14.0 hari
kp = 100/(100+20.p) di mana p = persentase tulangan.
pakai tulangan diameter
D = 13 mm.
sebanyak = 30 pcs
maka, p = 0.53 %.
= 0.904
dTsh = 499.8 kg/cm2.
dTc = kc.kd.ke.kh.Ep.Tci/Ec
di mana;
kc = 1.10 untuk kelembaban = 70.0 %.
kd = 1.200 untuk penarikan = 14.0 hari
ke = 0.800
kh = 0.868
Ep = 1.99E+6 kg/cm2.
Ec = 3.57E+5 kg/cm2.
Tci = 149.9 kg/cm2.
dTr = Fr.R.Tpi.[1-2.(dTsh+dTc)/Tpi]
Pi = 775.909 ton.
66.8 % UTS --> Fr = 1.840
Untuk jenis strand Low-Relaxation, relaksasi murni
R= 2.5 %.
Tpi = 12678.2 kg/cm2.
dTsh+dTc = 1266.5 kg/cm2.
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 10 / 15
σ pu = fp*(1-k1*k2/j)
k1 = 0.400
k2 = 1/(bef*dp*fc')*{Apt*fp + (Ast - Asc)/fsy}
= 0.116
0.85 - 0.007*(fc'-28) = 0.843
j = 0.843
s= 17951.499 kg/cm2.
T = 1098.635 ton.
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 11 / 15
bv = 17.50 cm.
0.8 h = 168.00 cm.
bw = 20.00 cm
Geser Momen
[ton] [ton-m]
Vc = 1/6 * (fc')0.5 * bv * d + Pv
Pv = dy/dx * Pe = 52028.54 kg.
Vc = 64994.86 kg.
Vc = Vt + Pv
Vt = 0.3*((fc')^0.5 + fpc)*bv*d = 146076.60 kg.
Vc = 198105.14 kg.
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 12 / 15
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 13 / 15
40.0 m.
16.0 4.0 5.0 15.0 (m).
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 14 / 15
IX. Resume
KETENTUAN UMUM
Jenis balok : Balok - I
Komposit / Non Komposit Komposit
Panjang balok : Lb = 40.800
Bentang balok : L = 40.000
Bentang bersih : Ln = 40.000
Jarak balok : s = 1.850
BAHAN-BAHAN
Beton Balok Pelat
Mutu beton : 500.0 [kg/cm2] 350.0 [kg/cm2]
fc' : 415.0 [kg/cm2] 290.5 [kg/cm2]
Modulus elastisitas : 356502.1 [kg/cm2] 298271.1 [kg/cm2]
Berat Jenis : 2500.0 [kg/m3]
Tegangan ijin
Keadaan awal (Kondisi Transfer)
Mutu beton saat penarikan : 80.00 % fc'.
fc'i = 332.00 [kg/cm2] 232.40 [kg/cm2]
Tegangan tekan : 0.55 fc'i
= 182.60 [kg/cm2] 127.82 [kg/cm2]
Tegangan tarik : -0.80 SQR(fc'i)
= -14.58 [kg/cm2] -12.20 [kg/cm2]
Keadaan akhir (Kondisi Servis)
fc' = 415.00 [kg/cm2] 290.50 [kg/cm2]
Tegangan tekan : 0.40 fc'
= 166.00 [kg/cm2] 116.20 [kg/cm2]
Tegangan tarik : -1.60 SQR(fc')
= -32.59 [kg/cm2] -27.27 [kg/cm2]
398859770.xls fath
DELTA SYSTECH INDONESIA Page: 15 / 15
Gaya Prestress :
Pi = 775.91 ton, or 66.81 % UTS.
Pe = 669.83 ton, or 57.67 % UTS.
P JF = 882.70 ton, or 76.00 % UTS.
Perpanjangan strand saat ditarik = 274.2 mm.
Tegangan transver :
Serat atas : 19.65 kg/cm2. Ok! >=tegangan ijin = -14.6
Serat bawah : 180.79 kg/cm2. Ok! <=tegangan ijin = 182.6
Tegangan service :
Serat pelat : 56.64 kg/cm2. Ok! <=tegangan ijin = 166.0
Serat atas : 145.10 kg/cm2. Ok! <=tegangan ijin = 166.0
Serat bawah : -3.31 kg/cm2. Ok! >=tegangan ijin = -32.6
Lendutan :
short term Long term
Lendutan (SW+PS) = 2.516 cm.
Lendutan (SW+SDL+PS) = 1.519 -3.726 cm.
Lendutan (SW+SDL+PS+T) = 0.026 -5.220 cm.
Lendutan (SW+SDL+PS+LL) = -0.736 -5.981 cm.
Lendutan akibat beban hidup saja -2.254 O.K.! cm.
Lendutan ijin akibat beban hidup saja
L / 800 = -5.000 cm.