Lay Out - SLD App MLG 2016-1
Lay Out - SLD App MLG 2016-1
GIS. WARU
D1
D2
D3
D5
D6
D4
214 A,
Wilayah APP Madiun 214 B
GI ALTA PRIMA GITET GITET
ACSR AW 2X330MM2
KARANGPILANG GI SAWAHAN
23.3 KMS
1480 A,
16.08 KMS
Surabaya BULUKANDANG T 169
20.5 KMS
116 A
T2
AREVA ABB
T 30 IBT-2 REAKTOR 7R1
IBT-3
100 MVAR GI BABADAN MIWON Wilayah APP Probolinggo
14.069 KMS
2 x 50 MVA SURABAYA BRT PURWOSARI
1.464 KMS
SHANDONG Trf 2 T 01 T 01
1 x 60 MVA 150kV ACCC LISBON 310 MM2
1200 A, 13.07 KMS HYOSUNG
Trf kons.
ACSR AW 2X330MM2 1480 A, 6.85 KMS 1 x 20 MVA
ACCC LISBON 310 MM2 1200 A,
31.29 KMS
ACSR AW 2X330 MM2 1480 A 11.89KMS
HITACHI IBT-2 50 MVA BANGUN
9.22 KMS
T 71 ACSR AW 2X330 MM2 1480 A 12.21 KMS
Wilayah APP Madiun
1 x 30 MVA
GI
ASEA Trf-2
1 x 60 MVA POWER Trf 3
24.05 KMS
2 x 60 MVA (RENCANA ) TELK Trf 4 ;
BANARAN PAUWELS Trf 10
1 x 60 MVA
PAUWELS Trf 9
1 x 60 MVA
Trf. KTT
Surya kertas (Trafo T 01
T 01 SC
25 MVAR
UNINDO Trf 1&Trf2, SHANDONG Trf-1
ACSR AW 330 MM2 740 A, 21.78 KMS tidak operasi)
PAUWELS Trf 3 1 x 60 MVA
ACSR AW 330 MM2 3 x 60 MVA TARIK 70kV
T 136
T 02 T 03
740 A, 48.17 KMS
ACSR AW 330 MM2 740 A, 21.822 KMS
T 01
SEKARPUTIH T 133
T 01 T 38 T 17
150 kV Trf kons.
SEKARPUTIH 70kV AJINOMOTO 1 x 20 MVA
MOJOAGUNG 70kV
6.7 KMS
,1 KMS
4.07 KMS
XIAN Trf 2
44
T 60 1 x 15, 1 x 10 MVA
CIWIKIMIA TELK Trf 1 PAUWELS
Trf 2
1 x 30 MVA
70kV ACSR AW 330 MM2 740 A, 31.56 KMS
1 x 60 MVA
T 75
PLOSO 70kV
ACSR OSTRICH 152 MM2 425A , 48.6 KMS
T 57 T 58
2 X 10 MVAR
2 T 522
ACSR PIGEON 85 MM2 295 A, 12.18 KMS T 13 T 01
ACS PIGEON 85MM2 295A , 29.59KMS ACCC HELSINKI 160 MM2 750 A, 8.6 KMS
SC
1 1
T 66
TAKAOKA Trf-2
Trf 3 30 MVA
3 x 60 MVA PASTI Trf 1 & 70kV
Trf 1 30 MVA
PAUWELS IBT-1 60 MVA
SENGKALING
UNINDO
UNINDO Trf 2
UNINDO
20 MVA
XIAN IBT-2 30 MVA
T 06 2 x 30 MVA T 49 SC UNINDO PASTI Trf 2 &
70kV
UNINDO Trf 3
T 03
T 74 1 x 20 MVA 2 x 30 MVA
Trf 4
PLTA KEBONAGUNG
3 X 3,6 MW
G
ACSR AW 330 MM2 740 A,
1 x 20 MVA
3 X 5,8 MW
1 X 5,6 MW
PLTA AMPEL
Trf 6 60 MVA
Trf 5 30 MVA
SHANDONG
1 x 30 MVA
UNINDO
TAKAOKA
WLINGI
T 01
PLTA GAMPINGAN PT. PLN (PERSERO) TJBTB
Trf 2 70kV PLTA SENGGURUH PAUWELS SCHNEIDER AREA PELAKSANA PEMELIHARAAN MALANG
1 x 10 MVA G 70kV Trf 3 Trf 1
2 X 14,5 MW
UNINDO
UNINDO-AREVA 2 X 27 MW
SUTAMI 70kV 1 x 30 MVA 1x 30 MVA
SINGLE LINE 500, 150 & 70 KV
3 X 35 MW