Professional Documents
Culture Documents
Hot Gas Path Inspection-LOTO
Hot Gas Path Inspection-LOTO
Hot Gas Path Inspection-LOTO
Starting System
Steam Start- Steam supply to starter turbine main supply valve closed and locked
or tagged
Gas Expander- Fuel gas supply valve closed and locked or tagged
Gas Expander- Vent open and locked or tagged
Starting system
Turning gear motor breaker open and locked or tagged
Starting motor breaker open and locked or tagged
LCI (Load Commutated Inverter) System Breaker de-energized and racked open
and locked or tagged and properly grounded
Static start motor driven disconnect De-energize motor power in panelboard
Neutral disconnect motor driven disconnect De-energize motor power in
panelboard
Roll out/ lockout Excitation Transformer Breaker
Diesel Start- Disconnect and remove lead from Starter
Direct Current Ratchet Pump Breaker open and locked or tagged
Jogging motor Breaker open and locked or tagged
Ignition Source
Spark plug coil breaker open and locked or tagged
Remove Spark plugs cables from the combustion cans on turbine.
Remove J-Plug Supply jumper in control cabinet (If unit has no isolation for Coil)
Hydraulic System
Primary hydraulic pump breaker open and locked or tagged
Aux. hydraulic pump breaker open and locked or tagged
Lift oil pump breaker open and locked or tagged
Please list other systems checked that are not listed above
This should be used as a guide and may not include all systems. Verify this checklist against the actual P&ID and/or the electrical
Schematic for local configuration and the proper isolation methods of all systems.
FE Name (Print)_______________________________________
Signature: _____________________ Shift: ________ Date: _______