Arky Construction and Supply provided a report on work accomplished from September 16 to September 30 on a road rehabilitation project. They completed 87.7% of the planned work valued at $52 million, leaving 12.3% or $7.3 million remaining. Major tasks completed included earthworks, paving of asphalt and concrete surfaces, drainage structures, guardrails, road markings, and street lighting installation. Some items such as pavement markers and removal of existing structures were finished as planned while other works like guardrails and reflective studs were 87-90% complete.
A Hierarchy of Turing Degrees: A Transfinite Hierarchy of Lowness Notions in the Computably Enumerable Degrees, Unifying Classes, and Natural Definability (AMS-206)
Arky Construction and Supply provided a report on work accomplished from September 16 to September 30 on a road rehabilitation project. They completed 87.7% of the planned work valued at $52 million, leaving 12.3% or $7.3 million remaining. Major tasks completed included earthworks, paving of asphalt and concrete surfaces, drainage structures, guardrails, road markings, and street lighting installation. Some items such as pavement markers and removal of existing structures were finished as planned while other works like guardrails and reflective studs were 87-90% complete.
Arky Construction and Supply provided a report on work accomplished from September 16 to September 30 on a road rehabilitation project. They completed 87.7% of the planned work valued at $52 million, leaving 12.3% or $7.3 million remaining. Major tasks completed included earthworks, paving of asphalt and concrete surfaces, drainage structures, guardrails, road markings, and street lighting installation. Some items such as pavement markers and removal of existing structures were finished as planned while other works like guardrails and reflective studs were 87-90% complete.
Arky Construction and Supply provided a report on work accomplished from September 16 to September 30 on a road rehabilitation project. They completed 87.7% of the planned work valued at $52 million, leaving 12.3% or $7.3 million remaining. Major tasks completed included earthworks, paving of asphalt and concrete surfaces, drainage structures, guardrails, road markings, and street lighting installation. Some items such as pavement markers and removal of existing structures were finished as planned while other works like guardrails and reflective studs were 87-90% complete.
CONTRACTOR : ARKY CONSTRUCTION AND SUPPLY DATE COVERED: 16-Sep-18
PROJECT: Rehabilitation/Reconstruction/Upgrading of Damage Paved National Roads including Drainage based on Pavement Management - 4 (HDM-4) Masbate-Milagros Road 30-Sep-18 CONTRACT ID.:
ITEM NO. DESCRIPTION ORIGINAL ACCOMPLISHED BALANCE OF WORK
QUANTITY UNIT UNIT COST AMOUNT QUANTITY AMOUNT % QUANTITY AMOUNT % PART A Facilities for the Engineers A.1 Engineer's Facilities and Others 5.00 mos. 6,577.00 32,885.00 5.00 32,885.00 0.06 - - - PART B Other General Requirements - B.5 Project Billboard 2.00 each 6,178.00 12,356.00 2.00 12,356.00 0.02 - - - B.7(1) Construction Safety & Health 5.00 mos. 46,494.00 232,470.00 5.00 232,470.00 0.39 - - - B.6 Traffic Control & Management 5.00 mos. 46,494.00 232,470.00 5.00 232,470.00 0.39 - - - B.9 Mobilization/Demobilization 1.00 l.s. 233,100.00 233,100.00 0.98 228,438.00 0.38 0.02 4,662.00 0.01 PART C Earthworks 105 Subgrade Preparation (Common Materials) 2,026.00 sq.m. 16.00 32,416.00 2,026.00 32,416.00 0.05 - - - PART D Sub-base & Base Course - - 200 Aggregate Sub-base Course 140.00 cu.m. 720.00 100,800.00 140.00 100,800.00 0.17 - - - 201 Aggregate Base Course 145.00 cu.m. 978.00 141,810.00 145.00 141,810.00 0.24 - - - PART E Surface Course - 302-2 Bit. Tack Coat (Emulsified Asphalt (SS-1) 26.20 m.t. 79,500.00 2,082,979.50 25.73 2,045,535.00 3.45 0.47 37,444.50 0.06 310(1)a.1 Bit. Conc. Surface Course (30mm thk)-Wearing Course 13,100.00 sq.m. 678.00 8,881,800.00 12,865.00 8,722,470.00 14.70 235.00 159,330.00 0.27 310(1)a.3 Bit. Conc. Surface Course (50mm thk)-Binder Course 13,100.00 sq.m. 1,127.00 14,763,700.00 12,865.00 14,498,855.00 24.43 235.00 264,845.00 0.45 311-1a.5 PCCP Pavement (Plain) Conventional Method, 280mm thk. 719.00 sq.m. 1,570.00 1,128,830.00 719.00 1,128,830.00 1.90 - - - PART G Drainage & Slope Protection Structures - 103(3) Foundation Fill 4.00 Cu.m. 750.00 3,000.00 4.00 3,000.00 0.01 - - - 103(6) Pipe Culvert & Drainage Excavation 23.00 Cu.m. 270.00 6,210.00 23.00 6,210.00 0.01 - - - 404 Reinf. Steel Bars, Grade 40 (minor structure) 5,358.00 kg. 57.00 305,406.00 5,358.00 305,406.00 0.51 - - - 405 Structural Concrete, Class A (minor structure) 48.00 Cu.m. 7,398.00 355,104.00 48.00 355,104.00 0.60 - - - 500(1)C RCPC (0.91m dia.) 4.00 l.m. 4,800.00 19,200.00 4.00 19,200.00 0.03 - - - 506(1) Stone Masonry 8.00 Cu.m. 5,042.00 40,336.00 8.00 40,336.00 0.07 - - - PART H Miscellaneous Structures 603(3a) Metal Guardrail (Metal Beam) INC. POST 704.85 l.m. 3,180.00 2,241,423.00 598.17 1,902,180.60 3.20 106.68 339,242.40 0.57 603(3b) Metal Beam End Piece 16.00 ea. 1,985.00 31,760.00 12.00 23,820.00 0.04 4.00 7,940.00 0.01 607-1 Reflectorized Pavement Studs (Flush Type), 1,912.00 ea. 8,740.00 16,710,880.00 1,170.00 10,225,800.00 17.23 742.00 6,485,080.00 10.93 612(1) Solar Powered Pavement Reflectorized Thermoplastic Leveled Markers 534.00 sq.m. 795.00 424,530.00 534.00 424,530.00 0.72 - - - 612(2) Marking(white) Reflectorized Thermoplastic Pavement 419.00 sq.m. 887.00 371,653.00 419.00 371,653.00 0.63 - - - 620(a) Marking(yellow) Chevron Signs (HM-1A-450mmx600mm) 141.00 ea. 12,987.00 1,831,167.00 141.00 1,831,167.00 3.09 - - - PART I Extraworks 101(3)c2 Removal of Actual Structure 610.00 sq.m. 117.00 71,370.00 610.00 71,370.00 0.12 - - - 102(2) Surplus Common Excavation 292.00 cu.m 173.00 50,516.00 292.00 50,516.00 0.09 - - - 624(1)a1 Single Arm Post, with Street Light, 8m, LED, 130w 65.00 ea. 138,712.70 9,016,325.50 65.00 9,016,325.50 15.19 - - - TOTAL 59,354,497.00 52,055,953.10 87.70 7,298,543.90 12.30