Project : SAFI Independent Power Project (MOROCCO)

Supplied by : Amitech Maroc


Package : GRP Pipe and Fittings 5/12/2015

DISCIPLINE
SUPPLIER'S DOCUMENT REVIEW SHEET Mech
Doc. No. Rev. Title DW Comments Supplier's Reply Remarks

page 18/34 TM-06 3-Requirements


Recommended to ad the verification and acceptance
M1 criteria . In the ASTM you can find a description of defects
with there acceptance criteria.

page 20/34 TM-07 Dimensions control


to be add

M2 7 Registration
-take notes of the measurements
-takes notes of the reference of the apparatus

Page 21/34 Test 02 pipe od ....

M3 recommended to make also note of reference of apparatus


to related document

page 22/34 6-procedure


M4 recommended to take also note of the references
measurement tools

page 23/34 Test 04 Chamfering ....


6-procedure
M5 recommended to take also note of the references
measurement tools

page 24/34 6-procedure


recommended to take also note of the references
M6 measurement tools

page 27/34
add a point at the end of 7-procedure:
M7 recommended to register the measurements and the related
references of the tool on a document

SIPP-VP-GA-90- Inspection & Test Procedure


1 page 28/34 Test 02-Failure....
0900 for GRP Pipe and Fittings
3-Requerements
M8 Recommended to ad the verification and acceptance
criteria for the two inspection possibilities.

page 29/34 Test 03-Longitudinal....


Results:
M9 recommended to register the measurements and the related
references of the tool on a document

page 31/34 Procedure


M10 recommended to register the measurements and the related
references of the tool on a document

page 32/34 8-procedure:


M11 recommended to register the measurements and the related
references of the tool on a document

page 33/34

M12
3-Requirements:
Recommended to ad the verification and acceptance
criteria for the test

page 33/34
7-procedure:
M13 the prosed time of 30 sec is to short to do a correct visual
inspection of the surface of the pipe. Replace the 30 sec by
the time necessary to inspect the surface of the pipe.

page 34/34 test07-Lamination....


recommended to take also note of the measurement and
M14 the references measurement tools