DISCIPLINE
SUPPLIER'S DOCUMENT REVIEW SHEET Mech
Doc. No. Rev. Title DW Comments Supplier's Reply Remarks
M2 7 Registration
-take notes of the measurements
-takes notes of the reference of the apparatus
page 27/34
add a point at the end of 7-procedure:
M7 recommended to register the measurements and the related
references of the tool on a document
page 33/34
M12
3-Requirements:
Recommended to ad the verification and acceptance
criteria for the test
page 33/34
7-procedure:
M13 the prosed time of 30 sec is to short to do a correct visual
inspection of the surface of the pipe. Replace the 30 sec by
the time necessary to inspect the surface of the pipe.