Dpr-Oct 4.10
Dpr-Oct 4.10
Rajapushpa
SUMMIT
Sealant
byte
&
spacer
approval
email
Awaiting
Comments
&
sent
to
dow
corning Approval
Given
to
global
for
Die
preparation
Pending
Rajapushpa Material
order
for
Aluminium received
5th
oct
SUMMIT Tentiative
Material
order
given
for
Payment
to
collect
from
curtain
wall,Bull
Nose
&
Louvers
are
Rajapushpa
for
142
tons
to
Hardcopy
submitted
placed,
Handover
Global
Fasteners/Screws/GI
panels/Gaskets/sealants
to
place
the
order
Material
delivery
for
UTZ
brackets
released
,Curtain
wall
to
follow
for
delivery
of
MS
Bracket
for
UTZ
&
curtain
wall Ramu
(Rejected
&
New
brackets
to
be
released. 100
brackets
from
Ramu
Material
to
get
Today)
Materials
for
Brackets
delivered
to
Fabrication
schedule
to
be
Ramu
&
Rafiq followed
Store
setup Dharamveer
to
complete
gate Anand
7 Dharamveer
to
start
the
Office
set
up GI
sheet
&
screws
delivered work
WCA
&
CAR
policy To
co-‐ordinate
with
GM
sir
Test
certificates
for
Glazing
to
be
Unitized
Checklist
Test
certificates
submitted To
be
discussed prepared
Work
flow
chart,sequence
of
works
to
Flow
Chart be
submitted Submission
on
Oct
1st
Site
Team Subcon
WO
issued Assigned Only
ACP
WO
to
issue
UTZ
Fab-‐
prasanjah
UTZ
Instaln
-‐
Mahesh
team
Fabrication/Installation
team
Curtain
wall
instal
-‐
Ashok
Team
Finalisation ACP
by
Munna
/
Shiv
finalised team
Spider
Glazing
-‐
1
team
Acp
Cladding
-‐
3
Team
Anand
to
Start
Today
New
Mock
up
Pending
Mockup
works
Glazing Mock-‐up
installation
done Glass
size
by
Surender
Mockup
works
Railing Mtl
ordered
with
Seshu Yet
to
install Materials
Today
Work
schedule
to
client Project
work
Schedule
revised
&
sent Sent
by
email
Shop
drawings
for
UTZ
curtain
wall
,Glass
production
&
requirements
Client
requirements schedule
with
qty,cash
flow
to
be
sent Pending
statement,Bracket
design,structural
report,
Site
area
provided
Bracket
works
going
Steel
works
for
Mezanine
floorby
on,Frame
works
completed
Nazim
khan To
plan
for
all
M/c
for
external
fencing
area
Factory
setup dispatch
&
Setup
Factory
setup
with
Land
extension GM
sir Under
progress
Glazing
m/c,Jib
crane,Copy
Silicone
machine
advance
Machinery
tools
router,Notching
m/c,Air
compressor, paid
Materials
Order
A-‐
frames,Trollies,Assemly
Glazing
Machine
tables,Power
tools,Electric
power
Rectification
pending
Tools
links,pneumatic
hose,Lifting
Mail
sent
Repair
by
belts,Racks,safety
belts 10th
Building
ONE Drawings
received Architectural
drawings
received Quote
sent
Sy
ni.
89 Drawing
review Surender
to
study
dwgs
Under
Review
Structural
report
to
prepare
by
santosh
Revised
Quote
&
Costing To
prepare
&
Submit Today
-‐
Ready
AIG Automatic
door
testing
&
Automatic
door
testing
&
upto
9th
floor
Mahesh
on
work
Hospital commisioning commisioning completed
Pending
Payment Madhu
sir
discussing
with
Chandu
Installation
to
be
Automatic
door
Material
delivered
completed
GAR
T-‐2 PO
released
to
Global
for
Balane
Need
to
follow
for
delivery
by
4th
-‐
Under
Packing
Material aluminium for
Sep
30th
Floor
mounted,Corner,hook
on
brackets
delivery
schedule
to
be
Check
with
Ramu Recon
by
Sukant
100
set
Brackets
will
be
Hook
on
brackets
delivered
Kick
Bracket Rectification
by
Ramu
Ramu
&
Seshu
delivery
to
1200nos
delivery
Seshu
T
bolt
for
bull
nose
be
followed on
today
Back
Panel New
order
placed
to
gowri Delivery
date
to
check
Curtain
Soffit
by
Acp
team
finalization
for
Refuge
by
50%
area
by
new
team
Bimlesh
ACP
Team
finalizing Dharamveer
&
Terrace
Coping
by
Anand
to
confirm
today &
Refuge
Soffit
by
Anand
&
T2
Soffits
by
Bimlesh
50%
Ashok
October
30th
despatching
Glazing
total
297m2
is
pending
from
Corner
Glasses
Pending
Glazing to
be
confirmed
with
saint
gobain Delivery
by
5th
Evening
Raghu
East
elevation
fall
protection
&
Site
clearences to
be
followed East
side
after
10th
platforms
to
be
removed
Openable
Fixing Hardware
by
6th
Gar
T2
Kt
series
un
ordered
atick
SKN
230
SQM
stock
30
glasses
to
order
by
Mahesh
CORNER
13
Nos.
& Ordered
All
T-‐2
Pending
Glasses today KT
30
Glasses
Gar
VMZ
&
Louver
Boq
to
submit
with
Drawings
Approved/DGF
MTO
(Sarfaraz
to
confirm
Surender
Site
Height
shaft
area
dwgs
by
design)
&
DG
shaft
louvers
sent
for
Suresh
to
confirm
surender
oct
05th
Dwg
approval
Jupiter
team
to
be
monitored
by
Completion
on
Octobet
Smoke
seal
&
flashing
work
Suresh
&
Bheemsen 15th
Necessary Hardware for Spider to
Spider
Glazing Today
delivery Mtls
to
order
deliver today
T2
MS
Bracket
/
Alum
Bracket
&
Broken
glass
to
check
&
order
immediately
by
Lingam
&
Sukanth
bheemsen
to
start
handing
Smoke
seal
&
Openable
checklist
over
with
Mahesh
from
provided
today
Work
order
qty
for
Amendment
mail
by
Kotaiah
to
send
today
to
workorder
Amendment for
Steel
&
Glazing
/
Spandrel
/
Awaiting
Mail
Naveen
Smoke
seal
to
send
a
credit
note
for
CW
scrap
handed
over
-‐
Sgf
scrap
SCRAP scrap
material
for
Removed
Rs
2,13,000/-‐
to
be
given
by
Lingam
/
Broken
Glass Broken
&
shortage
glass
for
T2
Kapil
&
Surender
for
Lingam
to
confirm
immediate
order
Acp
team
finalization
for
Refuge
by
Acp
to
reach
by
ACP
works Dharamveer
&
Terrace
Coping
by
Hardware,
Alum
Ordered
Saturday
Anand
&
T2
Soffits
by
Bimlesh for
A pprox
Q ty
T3
-‐
Re-‐concillation
&
retention/
T2
Bill
Prepared
Today
Billing Forwarded
to
Client
RA
Bills/T2
MS
bills GM
sir
to
Submit
Bill
for
T2
As
on
date
works
to
submitted
Sukanth
to
re-‐check
for
Material
Prepared
Aluminium
Comsumption wastage yet
to
submit
T2
&
T3
dwg
total
areas
to
be
cross
Santosh by
3rd
GAR
T2
&
T3
Area checked
with
actual
&
workorder
Bill
for
T2
As
on
date
works
to
certified
by
Mahesh
submitted
-‐ handed
over
to
Kotaiah
Completion schedule to provide for
VMZ, Louvers, Spider at Pre Anand
to
check
&
VMZ
sizes
as
per
site
Function, T2 Soffit & T3 Terrace confirm given
to
Surender
Coping acp cladding works
Gar Pending issues given by Mahesh &
Kotaiah - Surender to close by EOD
statement for delivered Glass &
installed area in & value to be prepared
& submitted