1. LOAD CALCULATION.......................................................................................................................... 3
1.A SOIL BEARING CAPACITY ............................................................................................................. 3
1.B ALLOWABLE AXIAL LOAD PERMITTED AS PER ULTIMATE BEARING CAPACITY............................ 3
1.C WEIGHT OF TOWER CRANE (BALLAST TYPE) ............................................................................... 3
2. Concrete Pad ..................................................................................................................................... 4
2.A Design Strength .......................................................................................................................... 4
2.B Load Calculation.......................................................................................................................... 4
2.B.1 Gravity Loads ....................................................................................................................... 4
2.C Design Loads ............................................................................................................................... 4
2.C.1 Design Axial Force, Pu .......................................................................................................... 4
2.C.2 Shear and Moment Acting on the concrete base ................................................................. 5
2.D Section Strength ......................................................................................................................... 6
2.D.1 Shear Strength (Two way).................................................................................................... 6
2.D.2 Moment capacity, ∅ Mn ...................................................................................................... 6
2.D.3 Design Ratio ......................................................................................................................... 6
2.E Concrete Base Detail ................................................................................................................... 7
1|P a g e
MAYNILAD WATER SERVICES, INC
DESIGN AND CONSTRUCTION OF LA MESA WATER TREATMENT PLANT 1
PROCESS IMPROVEMENT WORKS
DESIGN CALCULATION
2|P a g e
MAYNILAD WATER SERVICES, INC
DESIGN AND CONSTRUCTION OF LA MESA WATER TREATMENT PLANT 1
PROCESS IMPROVEMENT WORKS
1. LOAD CALCULATION
1.A SOIL BEARING CAPACITY
Since the location of the tower crane is located near on the Sludge Dewatering facility it is assumed
that the soil properties to be considered on this investigation is exactly the same to the soil parameters
that are being used on the design of sludge dewatering facility.
F.S = 3
q ult = 2664.54 kPa
q all = q ult / F.S = 2664.54 / 3 = 888.18 kPa (gross allowable bearing)
P = q all x area of footing = 888.18 kPa x 6 x 6 = 31,974.48 kN
Since the allowable axial force permitted on the soil based on the computation above by (terezaghi
equation) is 3,260 T (31,974.48 kN) is greater than the total gravity loads of the crane, we can say
that upon compaction and treatment of the existing soil it is safe to install the ballast type crane in
the area.
3|P a g e
MAYNILAD WATER SERVICES, INC
DESIGN AND CONSTRUCTION OF LA MESA WATER TREATMENT PLANT 1
PROCESS IMPROVEMENT WORKS
2. Concrete Pad
Parameters
fc’ = 27.57 MPa
fy = 414 MPa
Es = 200 GPa
4|P a g e
MAYNILAD WATER SERVICES, INC
DESIGN AND CONSTRUCTION OF LA MESA WATER TREATMENT PLANT 1
PROCESS IMPROVEMENT WORKS
5|P a g e
MAYNILAD WATER SERVICES, INC
DESIGN AND CONSTRUCTION OF LA MESA WATER TREATMENT PLANT 1
PROCESS IMPROVEMENT WORKS
𝑀𝑢
= 0.14 safe!
∅ 𝑀𝑛
𝑉𝑢
= 0.16 safe!
∅ 𝑉𝑛
6|P a g e
MAYNILAD WATER SERVICES, INC
DESIGN AND CONSTRUCTION OF LA MESA WATER TREATMENT PLANT 1
PROCESS IMPROVEMENT WORKS
7|P a g e
MAYNILAD WATER SERVICES, INC
DESIGN AND CONSTRUCTION OF LA MESA WATER TREATMENT PLANT 1
PROCESS IMPROVEMENT WORKS
8|P a g e
MAYNILAD WATER SERVICES, INC
DESIGN AND CONSTRUCTION OF LA MESA WATER TREATMENT PLANT 1
PROCESS IMPROVEMENT WORKS
9|P a g e