Project: Singapore Linde Upgrade project

Summary for SI Report

1) Duration: 15th May – 24th Jul 2018


2) Nos of borehole:
Section A: No info

Section B: 26 nos (depth upto apprx. 30m-60m)

Section C: 29 nos (depth upto apprx. 30m)

Section E: 4 nos (depth upto apprx. 30m)

3) Code: Eurocode 7 & BS 5930: 2015


4) Company: Soil Investigation Pte Ltd
5) Section A: West left; Section B: West right; Section C: East; Section E; Interconnecting
piperack
6) Soil Layers: Made Ground + Jurong Formation + Kallang Formation (Upto approx. 30m)
7) Soil Type: Silty Sand + Sand + Clay + (Seldomly) >> Gravel Sandy + Sandstone