DSLNG Project Job No.

: 0-5151-20
Doc. No. : S-900-1670-561 <Rev.1>
INSPECTION AND TEST PLAN FOR HOT OIL HEATER ERECTION SHEET 10 OF 38

FORM-5000-701
INSPECTION REPORT REPORT No.

HOT OIL HEATER (VERTICAL ON GROUND) Job Code


Date
ITEM NO. (Service)
ERECTION TOLERANCES (1) POSITION Refer to FDN Report:
A. Distance between centre lines of column at base ( ± 4 mm) INSTALLED HEIGHT
B. Vertical in both plans of main column assembly ( ±1 mm/m max. 20 mm) MEASURE
C. Elevation of top of steel furnace box floor beams (± 3 mm) SPECIFIED D
D. Diagonal (in plan) for furnace box section (4 column) at base (± 5 mm) DIRECTIO DIMENSIO DIMENSIO DIFFERENC
E. Elevation of top of steel furnace box arch beams ( ± 6 mm) N N N E
ERECTION TOLERANCES FOR STACK
F. Maximum deviation from a straight edge applied to the stack shall not
exceed ( 3 mm/3 m)
G. Stack shall not be out of plumb by more than 5 mm for 15 m height.

(2) VERTICALITY
DIRECTIO
N BOTTOM REFERENCE POINT
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-561 <Rev.1>
INSPECTION AND TEST PLAN FOR HOT OIL HEATER ERECTION SHEET 11 OF 38

(1) POSITION & ELEVATION (2) VERTICALITY


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (SW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by  Witnessed  Witnessed by Inspected by  Witnessed  Witnessed
by  Reviewed by by by
 Reviewed by  Reviewed by  Reviewed by
Name Name
Signature Signature
Date Date