1 OF 4
- CDCC : Original
PMR-001-Form 01
ITP NO. : I-T-3122-QAQC-
WI for FIELD INSPECTION AND TEST PLAN (F-ITP) Rev. No. : 0
LEGENDS, ABBREVIATIONS, REMARKS OF ITP Date :
PROJECT NAME : Tanjung Jati "B" Coal Fired Power Station Unit 3&4 (2x660 MW)
OWNER : PT. Central Java Power
CLIENT : SCJO-Erection Division (SCED)
TJE JOB NO. : T-3122
DESCRIPTION :
NOTIFICATION = Inspection Request in writing and require a minimum of 24 hours notice of impending inspection / test.
H - HOLD POINT = As notification point, however work may not proceed beyond this point without acceptance or formal waiver from Inspection
Authority ( Client / Owner )
W - WITNESS = Witness of inspection by Client / Owner and Sub-Contractor may proceed if Client / Owner not appearance at the pointed time.
Witness point shall be given by Notification
SW - SPOT WITNESS = Witness of inspection by Client / Owner and to be done at spot or random ( random sample )
R - REVIEW = Review of verifying certificate / Review a document to ensure compliance with specification/Review of inspection report or proc.
A - APPROVAL = Approval documentation ( Procedure, Work instruction, Inspection report, etc. ) or Control document required to be approved
IR = Issued report or documents required (i.e Inspection Report, Mill Certificate, Fabrication Completed Certificate, Etc.)
Note;
1. Inspection and test items covered by this list and applicable requisition and specifications are TJE's general requirements. If any conflict arise
between this list and individual requisition and specifications, the requirements in individual requisition and specification shall govern.
2. The legend used throughout this list shall have the meaning denoted and can be changed to suit with Client or Owner Comments.
II ABBREVIATIONS
AWS = AMERICAN WELDING SOCIETY NCR = NON CONFORMANCE REPORT RT = RADIOGRAPHY TEST
ASTM = AMERICAN SOCIETY TESTING OF MATERIAL RFI = REQUEST FOR INFORMATION UT = ULTRASONIC TEST
DIN = DEUTCHES INSTITUT FUR NORMUNG MDR = MANUFACTURER'S DATA REPORT PT = PENETRANT TEST
WPS = WELD PROCEDURE SPECIFICATION NDT = NON DESTRUCTIVE TESTING MT = MAGNETIC PART. TEST
PQR = PROCEDURE QUALIFICATION RECORD PWHT = POST WELD HEAT TREATMENT
WQTR = WELDER QUALIFICATION TEST RECORD Proc. = PROCEDURE
N/A = NOT APPLICABLE
III REMARKS
1) Ref. Approval Section of Document.
a : Where there is a Subcontractor element, the Subcontractor involved will sign the approval of the activity.
b : Where there is no Subcontractor element, TJE will sign approval of activity and present to the Client.
if required
2.0 RECEIVING MATERIALS & EQUIPMENTS
2.1 Check the tagging and identification are correct as per supporting document Doc. No. IM0401-3.4.1-1 (Stacker Reclaimer Erection Material Receiving Inspect.
2.2 Ensure that the materials are ready and accepted for erected . & Commisioning Manual/Mechanical),
Dwg No. SR0707.ERC.00 (General Arrangement Report , OSD (Over, Shortage, W&R SW & R SW & R SW & R
2.3 Check shipping documents for corelation with the conforming materials Drawing) Damage) Report
3.0 WELDING QUALIFICATION
3.1 Welding Procedure Specification (WPS) & Qualification (PQR)
Generate new WPS / PQR if required ASME Sec. IX WPS/PQR W&R W&R W&R W&R
3.2 Welder Performance Qualification Test
3.2.1 Visual Check ASME Sec. V, AWS D1.1 WPQTR W&R W&R W&R W&R
3.2.2 Non Destructive Test (RT)
4.0 BOLT ASSEMBLY QUALIFICATION Manufactures Instructions Inspection Report (F2-4) H H W&R SW & R
5.0 INSTALLATION
5.1 FOUNDATION PREPARATION
5.1.1 Area handover between Civil/Mechanical Contractor - H H W&R SW & R
5.1.2 Check foundation, packer plate and elevation Inspection Report (F2-2) W&R W SW & R SW & R
5.1.3 Check foundation concrete surface finish for roughness Installation Procedure of W SW SW SW
-
Stacker & Reclaimer (A-CHB-
5.1.4 Check anchor bolt elevation, dimension and alignment Inspection Report (F1-10) W&R W SW & R SW & R
M-TP6-3524)
5.1.4 Grouting as per manufacture recommendation Inspection Report (F2-3) W&R SW & R SW & R SW & R
5.2 LONG TRAVEL INSTALLATION
5.2.1 Check centre marking of rail travelling device location . Installation Procedure of W&R SW & R SW & R SW & R
Inspection Report (F-5 & F-6)
5.2.2 Check the wheels vertically and horizontally skew Stacker & Reclaimer (A-CHB- W&R W SW & R SW & R
5.2.3 Check for Wheel gauge, rail gauge, Bogie center point and parallelism M-TP6-3524) Inspection Report (F-1 &F-2) W&R SW & R SW & R SW & R
Page 7 of 77
if required
2.0 RECEIVING MATERIALS & EQUIPMENTS
2.1 Check the tagging and identification are correct as per supporting document Doc. No. IM0401-3.4.1-1 (Stacker Reclaimer Erection Material Receiving Inspect.
2.2 Ensure that the materials are ready and accepted for erected . & Commisioning Manual/Mechanical),
Dwg No. SR0707.ERC.00 (General Arrangement Report , OSD (Over, Shortage, W&R SW & R SW & R SW & R
2.3 Check shipping documents for corelation with the conforming materials Drawing) Damage) Report
3.0 WELDING QUALIFICATION
3.1 Welding Procedure Specification (WPS) & Qualification (PQR)
Generate new WPS / PQR if required ASME Sec. IX WPS/PQR W&R W&R W&R W&R
3.2 Welder Performance Qualification Test
3.2.1 Visual Check ASME Sec. V, AWS D1.1 WPQTR W&R W&R W&R W&R
3.2.2 Non Destructive Test (RT)
4.0 BOLT ASSEMBLY QUALIFICATION Manufactures Instructions Inspection Report (F2-4) H H W&R SW & R
5.0 INSTALLATION
5.1 FOUNDATION PREPARATION
5.1.1 Area handover between Civil/Mechanical Contractor - H H W&R SW & R
5.1.2 Check foundation, packer plate and elevation Inspection Report (F2-2) W&R W SW & R SW & R
5.1.3 Check foundation concrete surface finish for roughness Installation Procedure of W SW SW SW
-
Stacker & Reclaimer (A-CHB-
5.1.4 Check anchor bolt elevation, dimension and alignment Inspection Report (F1-10) W&R W SW & R SW & R
M-TP6-3524)
5.1.4 Grouting as per manufacture recommendation Inspection Report (F2-3) W&R SW & R SW & R SW & R
5.2 LONG TRAVEL INSTALLATION
5.2.1 Check centre marking of rail travelling device location . Installation Procedure of W&R SW & R SW & R SW & R
Inspection Report (F-5 & F-6)
5.2.2 Check the wheels vertically and horizontally skew Stacker & Reclaimer (A-CHB- W&R W SW & R SW & R
5.2.3 Check for Wheel gauge, rail gauge, Bogie center point and parallelism M-TP6-3524) Inspection Report (F-1 &F-2) W&R SW & R SW & R SW & R
if required
2.0 RECEIVING MATERIALS & EQUIPMENTS
2.1 Check the tagging and identification are correct as per supporting document Doc. No. IM0401-3.4.1-1 (Stacker Reclaimer Erection Material Receiving Inspect.
2.2 Ensure that the materials are ready and accepted for erected . & Commisioning Manual/Mechanical),
Dwg No. SR0707.ERC.00 (General Arrangement Report , OSD (Over, Shortage, W&R SW & R SW & R SW & R
2.3 Check shipping documents for corelation with the conforming materials Drawing) Damage) Report
3.0 WELDING QUALIFICATION
3.1 Welding Procedure Specification (WPS) & Qualification (PQR)
Generate new WPS / PQR if required ASME Sec. IX WPS/PQR W&R W&R W&R W&R
3.2 Welder Performance Qualification Test
3.2.1 Visual Check ASME Sec. V, AWS D1.1 WPQTR W&R W&R W&R W&R
3.2.2 Non Destructive Test (RT)
4.0 BOLT ASSEMBLY QUALIFICATION Manufactures Instructions Inspection Report (F2-4) H H W&R SW & R
5.0 INSTALLATION
5.1 FOUNDATION PREPARATION
5.1.1 Area handover between Civil/Mechanical Contractor - H H W&R SW & R
5.1.2 Check foundation, packer plate and elevation Inspection Report (F2-2) W&R W SW & R SW & R
5.1.3 Check foundation concrete surface finish for roughness Installation Procedure of W SW SW SW
-
Stacker & Reclaimer (A-CHB-
5.1.4 Check anchor bolt elevation, dimension and alignment Inspection Report (F1-10) W&R W SW & R SW & R
M-TP6-3524)
5.1.4 Grouting as per manufacture recommendation Inspection Report (F2-3) W&R SW & R SW & R SW & R
5.2 LONG TRAVEL INSTALLATION
5.2.1 Check centre marking of rail travelling device location . Installation Procedure of W&R SW & R SW & R SW & R
Inspection Report (F-5 & F-6)
5.2.2 Check the wheels vertically and horizontally skew Stacker & Reclaimer (A-CHB- W&R W SW & R SW & R
5.2.3 Check for Wheel gauge, rail gauge, Bogie center point and parallelism M-TP6-3524) Inspection Report (F-1 &F-2) W&R SW & R SW & R SW & R
Page 13 of 77
if required
2.0 RECEIVING MATERIALS & EQUIPMENTS
2.1 Check the tagging and identification are correct as per supporting document Doc. No. IM0401-3.4.1-1 (Stacker Reclaimer Erection Material Receiving Inspect.
2.2 Ensure that the materials are ready and accepted for erected . & Commisioning Manual/Mechanical),
Dwg No. SR0707.ERC.00 (General Arrangement Report , OSD (Over, Shortage, W&R SW & R SW & R SW & R
2.3 Check shipping documents for corelation with the conforming materials Drawing) Damage) Report
3.0 WELDING QUALIFICATION
3.1 Welding Procedure Specification (WPS) & Qualification (PQR)
Generate new WPS / PQR if required ASME Sec. IX WPS/PQR W&R W&R W&R W&R
3.2 Welder Performance Qualification Test
3.2.1 Visual Check ASME Sec. V, AWS D1.1 WPQTR W&R W&R W&R W&R
3.2.2 Non Destructive Test (RT)
4.0 BOLT ASSEMBLY QUALIFICATION Manufactures Instructions Inspection Report (F2-4) H H W&R SW & R
5.0 INSTALLATION
5.1 FOUNDATION PREPARATION
5.1.1 Area handover between Civil/Mechanical Contractor - H H W&R SW & R
5.1.2 Check foundation, packer plate and elevation Inspection Report (F2-2) W&R W SW & R SW & R
5.1.3 Check foundation concrete surface finish for roughness Installation Procedure of W SW SW SW
-
Stacker & Reclaimer (A-CHB-
5.1.4 Check anchor bolt elevation, dimension and alignment Inspection Report (F1-10) W&R W SW & R SW & R
M-TP6-3524)
5.1.4 Grouting as per manufacture recommendation Inspection Report (F2-3) W&R SW & R SW & R SW & R
5.2 LONG TRAVEL INSTALLATION
5.2.1 Check centre marking of rail travelling device location . Installation Procedure of W&R SW & R SW & R SW & R
Inspection Report (F-5 & F-6)
5.2.2 Check the wheels vertically and horizontally skew Stacker & Reclaimer (A-CHB- W&R W SW & R SW & R
5.2.3 Check for Wheel gauge, rail gauge, Bogie center point and parallelism M-TP6-3524) Inspection Report (F-1 &F-2) W&R SW & R SW & R SW & R
SKETCH :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
SKETCH
:
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
SKETCH
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Inspection Item:
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Diagonal (12117)
1
Deviation (12117) ‹ 14 m
Diagonal (12117)
2
Deviation (12117) ‹ 14 m
Base Distance (9100)
3
Deviation (9100) ‹5m
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Inspection Item :
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Inspection Item :
Sketch :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Inspection Item :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Applicable Code :
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Location to be Grout :
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
SKETCH
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
SKETCH
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
1 0 0 0
EAST SITE
196 5130 5130 5130.5 0 0.5 196 120 119.5 120 -0.5 0
197 5130 5130 5130 0 0 197 120 120.5 120.5 0.5 0.5
198 5130 5130 5130.5 0 0.5 198 120 120 120.5 0 0.5
199 5130 5131 5131 1 1 199 120 120 121 0 1
200 5130 5130 5130 0 0 200 120 120 120 0 0
201 5130 5130 5130 0 0 201 120 120 121 0 1
202 5130 5131 5130 1 0 202 120 119 120.5 -1 0.5
203 5130 5131 5129.5 1 -0.5 203 120 120.5 120 0.5 0
204 5130 5129 5131 -1 1 204 120 120 120.5 0 0.5
205 5130 5131 5128.5 1 -1.5 205 120 120.5 120 0.5 0
206 5130 5131 5130 1 0 206 120 119 120 -1 0
207 5130 5130 5130 0 0 207 120 120.5 120 0.5 0
208 5130 5131 5130 1 0 208 120 120 120 0 0
209 5130 5130 5130 0 0 209 120 121 120 1 0
210 5130 5131 5131.5 1 1.5 210 120 120 121 0 1
211 5130 5130 5130 0 0 211 120 120.5 121 0.5 1
212 5130 5130 5130 0 0 212 120 120 120 0 0
213 5130 5130 5131.5 0 1.5 213 120 121 120 1 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
WEST SITE
0 0.5 1 1
148 5130 5131 5131 1 1 148 120 120 120 0 0
149 5130 5130.5 5130.5 0.5 0.5 149 120 119.5 121 -0.5 1
150 5130 5131 5130.5 1 0.5 150 120 119.5 120 -0.5 0
151 5130 5131 5131 1 1 151 120 120 119 0 -1
152 5130 5131 5131 1 1 152 120 120 119.5 0 -0.5
153 5130 5131 5130 1 0 153 120 120 120 0 0
154 5130 5131.5 5131 1.5 1 154 120 119 120 -1 0
155 5130 5131 5130 1 0 155 120 120 120.5 0 0.5
156 5130 5130 5130 0 0 156 120 120 121 0 1
157 5130 5129.5 5130 -0.5 0 157 120 120.5 119 0.5 -1
158 5130 5130.5 5129.5 0.5 -0.5 158 120 119 120 -1 0
159 5130 5129 5129 -1 -1 159 120 119.5 120 -0.5 0
160 5130 5131 5130 1 0 160 120 119.5 119.5 -0.5 -0.5
161 5130 5131 5132 1 2 161 120 120 121 0 1
162 5130 5131.5 5132 1.5 2 162 120 121 120 1 0
163 5130 5131 5132.5 1 2.5 163 120 120 120 0 0
164 5130 5131.5 5130 1.5 0 164 120 119.5 120 -0.5 0
165 5130 5131.5 5131 1.5 1 165 120 120 120 0 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
WEST SITE
2 1 0 0
169 5130 5132 5130.5 2 0.5 169 120 121 121 1 1
170 5130 5132 5131 2 1 170 120 119.5 121 -0.5 1
171 5130 5132 5131 2 1 171 120 120 119 0 -1
172 5130 5131 5131 1 1 172 120 120 119.5 0 -0.5
173 5130 5131 5130 1 0 173 120 120 120 0 0
174 5130 5130.5 5131 0.5 1 174 120 121 120 1 0
175 5130 5131 5130.5 1 0.5 175 120 119.5 121 -0.5 1
176 5130 5130 5131.5 0 1.5 176 120 120 120.5 0 0.5
177 5130 5130 5131 0 1 177 120 120 120.5 0 0.5
178 5130 5129.5 5130.5 -0.5 0.5 178 120 120.5 120 0.5 0
179 5130 5131 5131 1 1 179 120 120.5 120 0.5 0
180 5130 5129.5 5130 -0.5 0 180 120 120 121 0 1
181 5130 5130 5129.5 0 -0.5 181 120 119 121 -1 1
182 5130 5129.5 5130.5 -0.5 0.5 182 120 119.5 120 -0.5 0
183 5130 5131 5130 1 0 183 120 120 120 0 0
184 5130 5130 5130 0 0 184 120 121 120 1 0
185 5130 5130.5 5130 0.5 0 185 120 120 120 0 0
186 5130 5130 5130 0 0 186 120 120 121 0 1
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
WEST SITE
0 0 1 0
190 5130 5130 5130 0 0 190 120 120.5 120 0.5 0
191 5130 5130 5130.5 0 0.5 191 120 120 120 0 0
192 5130 5130 5129.5 0 -0.5 192 120 120 119 0 -1
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH:
951
1165
330
DETAIL I
50◦
2
2
fit-up area I
FW-01 12 mm ACC -
FW-02 12 mm ACC -
FW-03 12 mm ACC -
FW-04 12 mm ACC -
REMARKS:
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Applicable Code :
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Applicable Code :
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
J 03 SF smaw 25 mm - Accepted -
J 03 SF smaw 25 mm - Accepted -
J 03 SF smaw 25 mm - Accepted -
J 03 SF smaw 25 mm - Accepted -
J 03 SF smaw 25 mm - Accepted -
J 03 SF smaw 25 mm - Accepted -
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
SKETCH:
951
1165
330
DETAIL I
50◦
2
2
fit-up area I
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
REMARKS:
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
Applicable Code :
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
J 03 EF smaw 25 mm - Accepted -
J 03 EF smaw 25 mm - Accepted -
J 03 EF smaw 20 mm - Accepted -
J 03 EF smaw 20 mm - Accepted -
J 03 EF smaw 20 mm - Accepted -
J 03 EF smaw 20 mm - Accepted -
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
WEST SITE
1 -0.5 1 0.5
244 5130 5131 5129.5 1 -0.5 244 120 120 120 0 0
245 5130 5130 5130 0 0 245 120 120 119.5 0 -0.5
246 5130 5130 5130 0 0 246 120 120 120 0 0
247 5130 5131 5129.5 1 -0.5 247 120 120 119.5 0 -0.5
248 5130 5130 5131 0 1 248 120 119.5 119.5 -0.5 -0.5
249 5130 5131.5 5130 1.5 0 249 120 119.5 120.5 -0.5 0.5
250 5130 5131.5 5130 1.5 0 250 120 120 119.5 0 -0.5
251 5130 5132 5131 2 1 251 120 120 120 0 0
252 5130 5131 5131 1 1 252 120 120 120 0 0
253 5130 5131.5 5132 1.5 2 253 120 119.5 120 -0.5 0
254 5130 5132 5131 2 1 254 120 120 121 0 1
255 5130 5131.5 5130.5 1.5 0.5 255 120 119 119.5 -1 -0.5
256 5130 5131 5130.5 1 0.5 256 120 119.5 119.5 -0.5 -0.5
257 5130 5131 5131 1 1 257 120 120 119.5 0 -0.5
258 5130 5131.5 5130 1.5 0 258 120 120 121 0 1
259 5130 5130 5129 0 -1 259 120 120 120 0 0
260 5130 5131 5130 1 0 260 120 120 120.5 0 0.5
261 5130 5129 5129.5 -1 -0.5 261 120 120.5 120 0.5 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
WEST SITE
1.5 0 1 -0.5
265 5130 5132 5130 2 0 265 120 120 119.5 0 -0.5
266 5130 5130.5 5130.5 0.5 0.5 266 120 120 119 0 -1
267 5130 5130.5 5130 0.5 0 267 120 120.5 119.5 0.5 -0.5
268 5130 5129 5130 -1 0 268 120 120 120 0 0
269 5130 5128.5 5129.5 -1.5 -0.5 269 120 121 119.5 1 -0.5
270 5130 5129.5 5131 -0.5 1 270 120 120 120 0 0
271 5130 5129 5129.5 -1 -0.5 271 120 120 119.5 0 -0.5
272 5130 5130 5130 0 0 272 120 119.5 119 -0.5 -1
273 5130 5129.5 5130.5 -0.5 0.5 273 120 120 119.5 0 -0.5
274 5130 5129 5129 -1 -1 274 120 120 120 0 0
275 5130 5129.5 5130 -0.5 0 275 120 120 119.5 0 -0.5
276 5130 5129.5 5129.5 -0.5 -0.5 276 120 120 120 0 0
277 5130 5130 5130.5 0 0.5 277 120 120 120 0 0
278 5130 5129.5 5129.5 -0.5 -0.5 278 120 121 120 1 0
279 5130 5130 5130 0 0 279 120 120 120 0 0
280 5130 5130.5 5130 0.5 0 280 120 120 120 0 0
281 5130 5130 5130 0 0 281 120 120 120 0 0
282 5130 5130 5130 0 0 282 120 120 120 0 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
WEST SITE
0 0 0 0
286 5130 5129.5 5129.5 -0.5 -0.5 286 120 121 119.5 1 -0.5
287 5130 5130 5130 0 0 287 120 121 120 1 0
288 5130 5129 5130 -1 0 288 120 120 119 0 -1
289 5130 5129 5130 -1 0 289 120 120 120 0 0
290 5130 5129 5130 -1 0 290 120 120.5 119 0.5 -1
291 5130 5130 5130 0 0 291 120 120 120 0 0
292 5130 5130.5 5129 0.5 -1 292 120 120 120 0 0
293 5130 5129 5129 -1 -1 293 120 120 120 0 0
294 5130 5131 5128.5 1 -1.5 294 120 120 120 0 0
295 5130 5130 5130 0 0 295 120 120 119.5 0 -0.5
296 5130 5129 5130 -1 0 296 120 120 120 0 0
297 5130 5129.5 5128 -0.5 -2 297 120 120 120 0 0
298 5130 5130 5133 0 3 298 120 120 120 0 0
299 5130 5131 5130 1 0 299 120 120 120 0 0
300 5130 5130 5130 0 0 300 120 120 120 0 0
301 5130 5131 5131 1 1 301 120 119.5 120 -0.5 0
302 5130 5131 5130 1 0 302 120 120.5 120 0.5 0
303 5130 5130 5130 0 0 303 120 120.5 120 0.5 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
WEST SITE
0 0 -0.5 0
307 5130 5130.5 5130 0.5 0 307 120 121 120 1 0
308 5130 5131 5130 1 0 308 120 120 120 0 0
309 5130 5130 5129.5 0 -0.5 309 120 120 120 0 0
310 5130 5130 5129.5 0 -0.5 310 120 119 120 -1 0
311 5130 5131 5130 1 0 311 120 120 120 0 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
EAST SITE
0 0 0 0
290 5130 5130.5 5130.5 0.5 0.5 290 120 119.5 120 -0.5 0
291 5130 5130 5131 0 1 291 120 120 120 0 0
292 5130 5131.5 5130.5 1.5 0.5 292 120 120 119.5 0 -0.5
293 5130 5130.5 5130 0.5 0 293 120 120.5 120.5 0.5 0.5
294 5130 5130.5 5130.5 0.5 0.5 294 120 120 119.5 0 -0.5
295 5130 5130 5132 0 2 295 120 120 119.5 0 -0.5
296 5130 5130 5130.5 0 0.5 296 120 120 120 0 0
297 5130 5130 5130.5 0 0.5 297 120 121 119.5 1 -0.5
298 5130 5130 5130.5 0 0.5 298 120 120.5 119.5 0.5 -0.5
299 5130 5130.5 5129 0.5 -1 299 120 120 120 0 0
300 5130 5130 5130 0 0 300 120 119.5 120.5 -0.5 0.5
301 5130 5129.5 5129.5 -0.5 -0.5 301 120 120 120 0 0
302 5130 5129 5130 -1 0 302 120 121 120 1 0
303 5130 5130 5130 0 0 303 120 120 119.5 0 -0.5
304 5130 5130 5130.5 0 0.5 304 120 119.5 119.5 -0.5 -0.5
305 5130 5129 5130 -1 0 305 120 120 119.5 0 -0.5
306 5130 5128.5 5131 -1.5 1 306 120 120 120 0 0
307 5130 5130 5130 0 0 307 120 120 120 0 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
EAST SITE
1 0 0 0
311 5130 5131 5131 1 1 311 120 120.5 121 0.5 1
312 5130 5128.5 5131.5 -1.5 1.5 312 120 120 119.5 0 -0.5
313 5130 5130 5131.5 0 1.5 313 120 119 120 -1 0
314 5130 5130 5132 0 2 314 120 119 120 -1 0
315 5130 5130 5130 0 0 315 120 119 120 -1 0
316 5130 5129 5129.5 -1 -0.5 316 120 119.5 120 -0.5 0
317 5130 5129 5130 -1 0 317 120 120 119.5 0 -0.5
318 5130 5130 5131 0 1 318 120 120 120 0 0
319 5130 5131 5130 1 0 319 120 120.5 120 0.5 0
320 5130 5130 5130 0 0 320 120 120.5 119 0.5 -1
321 5130 5128.5 5130.5 -1.5 0.5 321 120 120 120 0 0
322 5130 5128.5 5129 -1.5 -1 322 120 120 120 0 0
323 5130 5130 5129 0 -1 323 120 119.5 119 -0.5 -1
324 5130 5130 5128.5 0 -1.5 324 120 119 120 -1 0
325 5130 5128.5 5128.5 -1.5 -1.5 325 120 120 119 0 -1
326 5130 5130 5129 0 -1 326 120 119.5 120 -0.5 0
327 5130 5128.5 5129 -1.5 -1 327 120 120 120 0 0
328 5130 5129 5128.5 -1 -1.5 328 120 119 119 -1 -1
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
EAST SITE
-1 -1 -1 -1
332 5130 5130 5129 0 -1 332 120 120.5 120 0.5 0
333 5130 5129.5 5129 -0.5 -1 333 120 120 118.5 0 -1.5
334 5130 5129 5129.5 -1 -0.5 334 120 120 119 0 -1
335 5130 5129 5130 -1 0 335 120 119 119 -1 -1
336 5130 5128.5 5130 -1.5 0 336 120 120 120 0 0
337 5130 5129 5129 -1 -1 337 120 120 120 0 0
338 5130 5129.5 5130 -0.5 0 338 120 119 120 -1 0
339 5130 5129 5129 -1 -1 339 120 119.5 119 -0.5 -1
340 5130 5130 5130 0 0 340 120 119.5 120 -0.5 0
341 5130 5130 5130 0 0 341 120 120 120 0 0
342 5130 5130 5130 0 0 342 120 119 120 -1 0
343 5130 5131.5 5130 1.5 0 343 120 120 120 0 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
Inspection Result :
VALUE (NM)
NO STRUCTURAL PART NAME SPEC SIZE METHOD RESULT
PLAN ACT
Sketch :
N
INSPECTION 100% FOR ALL OF THE BOLT...!
Notes.
CHECK THE DRAWING...!!!
Prepared & Inspected by, Witnessed / Approved by, Witnessed Reviewed / Approved by,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
EAST SITE
0 1 0.5 0
515 5130 5130 5130.5 0 0.5 515 120 120 120 0 0
516 5130 5130.5 5130.5 0.5 0.5 516 120 120 120 0 0
517 5130 5130 5130.5 0 0.5 517 120 120 120.5 0 0.5
518 5130 5130 5130 0 0 518 120 119.5 120.5 -0.5 0.5
519 5130 5130 5130 0 0 519 120 120.5 120 0.5 0
520 5130 5130 5131 0 1 520 120 121 120 1 0
521 5130 5130 5130 0 0 521 120 119.5 120 -0.5 0
522 5130 5131.5 5130 1.5 0 522 120 119 120 -1 0
523 5130 5130 5130 0 0 523 120 119 120 -1 0
524 5130 5131.5 5130 1.5 0 524 120 119.5 120 -0.5 0
525 5130 5131 5130 1 0 525 120 119 120.5 -1 0.5
526 5130 5130.5 5130.5 0.5 0.5 526 120 119 120 -1 0
527 5130 5130 5130.5 0 0.5 527 120 119 119.5 -1 -0.5
528 5130 5131 5130 1 0 528 120 119 121 -1 1
529 5130 5131.5 5131 1.5 1 529 120 119 120 -1 0
530 5130 5131 5130 1 0 530 120 119.5 120 -0.5 0
531 5130 5130 5130.5 0 0.5 531 120 120 119.5 0 -0.5
532 5130 5130.5 5131.5 0.5 1.5 532 120 120 120.5 0 0.5
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
EAST SITE
0 1 0 -1
536 5130 5130.5 5131.5 0.5 1.5 536 120 119 120 -1 0
537 5130 5130.5 5131 0.5 1 537 120 119 120.5 -1 0.5
538 5130 5130 5130 0 0 538 120 120 120 0 0
539 5130 5131 5130.5 1 0.5 539 120 120 120.5 0 0.5
540 5130 5130.5 5130.5 0.5 0.5 540 120 120 120.5 0 0.5
541 5130 5130 5131 0 1 541 120 120 120.5 0 0.5
542 5130 5131 5131 1 1 542 120 120 120.5 0 0.5
543 5130 5131 5130 1 0 543 120 120 120 0 0
544 5130 5131 5131 1 1 544 120 120 121 0 1
545 5130 5131 5129.5 1 -0.5 545 120 120.5 120 0.5 0
546 5130 5130.5 5131.5 0.5 1.5 546 120 119 119.5 -1 -0.5
547 5130 5131 5131 1 1 547 120 120 120 0 0
548 5130 5130 5130.5 0 0.5 548 120 119.5 120 -0.5 0
549 5130 5131 5130 1 0 549 120 120 119.5 0 -0.5
550 5130 5130 5130.5 0 0.5 550 120 119.5 120.5 -0.5 0.5
551 5130 5130 5131 0 1 551 120 119.5 120 -0.5 0
552 5130 5130 5129.5 0 -0.5 552 120 119.5 120 -0.5 0
553 5130 5130 5130 0 0 553 120 120.5 120 0.5 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,
SKETCH
EAST SITE
A
N a b
5130
N
B
WEST SITE
120 120
EAST SITE
0 1 0.5 0
557 5130 5130 5130 0 0 557 120 119.5 120.5 -0.5 0.5
558 5130 5131 5131 1 1 558 120 120.5 120 0.5 0
559 5130 5129.5 5131 -0.5 1 559 120 119.5 120.5 -0.5 0.5
560 5130 5130.5 5132 0.5 2 560 120 120 120.5 0 0.5
561 5130 5130.5 5130.5 0.5 0.5 561 120 119.5 119.5 -0.5 -0.5
562 5130 5130 5130 0 0 562 120 119.5 119.5 -0.5 -0.5
563 5130 5130 5130 0 0 563 120 119.5 120 -0.5 0
564 5130 5131 5130 1 0 564 120 120 120.5 0 0.5
565 5130 5130.5 5130 0.5 0 565 120 120 119.5 0 -0.5
566 5130 5131 5130 1 0 566 120 119.5 120 -0.5 0
567 5130 5130 5130 0 0 567 120 121 120.5 1 0.5
568 5130 5130 5130 0 0 568 120 120 120 0 0
569 5130 5131 5130 1 0 569 120 119.5 120.5 -0.5 0.5
570 5130 5130 5130.5 0 0.5 570 120 120 120.5 0 0.5
571 5130 5130 5130 0 0 571 120 119.5 120 -0.5 0
NOTES
Prepared & Inspected By, Witnessed / Approved By, Witnessed / Approved By, Reviewed / Approved By,