PEMERINTAH KOTA BANDAR LAMPUNG

BADAN PENANGGULANGAN BENCANA DAERAH (BPBD)


Jalan Kapten Pier Tendean No. 02 Telp. 0721 252741 Bandar Lampung

BACK UP DATA

RATA-
P LUAS VOLUME
P A T B C D RATA
KUMULATIF (M2) (M3)
LUAS

TYPE 1
Segmen 2 (kiri)
0 0 0.45 1.35 0.85 0.4 0.9 1.2375
1.24675 6.23375
5 5 0.44 1.4 0.84 0.4 0.9 1.256
1.24675 6.23375
5 10 0.45 1.35 0.85 0.4 0.9 1.2375
1.250075 6.250375
5 15 0.445 1.4 0.8445 0.4 0.9 1.26265
1.273325 5.729963
4.5 19.5 0.46 1.4 0.86 0.4 0.9 1.284

VOLUME TERPASANG 24.44784

SEGMEN 2 (Kanan)
0 0 0.45 2.78 0.95 0.5 1 2.446
2.43555 12.17775
5 5 0.44 2.79 0.94 0.5 1 2.4251
2.43555 12.17775
5 10 0.445 2.8 0.945 0.5 1 2.446
2.4495 12.2475
5 15 0.45 2.79 0.95 0.5 1 2.453
2.4565 12.2825
5 20 0.45 2.8 0.95 0.5 1 2.46
2.453 12.265
5 25 0.45 2.78 0.95 0.5 1 2.446
2.446 12.23
5 30 0.44 2.8 0.95 0.5 1 2.446
2.446 12.23
5 35 0.45 2.78 0.95 0.5 1 2.446
2.43555 12.17775
5 40 0.44 2.79 0.94 0.5 1 2.4251
2.43555 12.17775
5 45 0.445 2.8 0.945 0.5 1 2.446
2.4495 12.2475
5 50 0.45 2.79 0.95 0.5 1 2.453
2.4565 12.2825
5 55 0.45 2.8 0.95 0.5 1 2.46
2.453 12.265
5 60 0.45 2.78 0.95 0.5 1 2.446
2.446 7.338
3 63 0.44 2.8 0.95 0.5 1 2.446

VOLUME TERPASANG 154.099


SEGMEN 1 (Kiri)
0 0 0.45 1.4 0.75 0.3 0.65 1.035
1.03325 5.16625
5 5 0.445 1.4 0.75 0.3 0.65 1.0315
1.03325 3.92635
3.8 8.8 0.45 1.4 0.75 0.3 0.65 1.035
9.0926
SEGMEN 1 (kanan)
0 0 0.44 1.69 0.94 0.5 1 1.6661
1.67805 8.39025
5 5 0.45 1.7 0.95 0.5 1 1.69
1.69 8.45
5 10 0.45 1.7 0.95 0.5 1 1.69
1.67805 8.39025
5 15 0.44 1.69 0.94 0.5 1 1.6661
1.67805 8.39025
5 20 0.45 1.7 0.95 0.5 1 1.69
1.69 8.45
5 25 0.45 1.7 0.95 0.5 1 1.69
1.69 4.394
2.6 27.6 0.45 1.7 0.95 0.5 1 1.69

VOLUME TERPASANG 46.46475


RATA-
P LUAS VOLUME
P A B C-D D E F RATA
KUMULATIF (M2) (M3)
LUAS

1
Segmen 2 (kiri)
0 0 0.3 0.4 1 0.25 0.8 0.1 0.98
0.975 4.875
5 5 0.29 0.4 1 0.25 0.8 0.1 0.97
0.975 4.875
5 10 0.3 0.4 1 0.25 0.8 0.1 0.98
0.975 4.875
5 15 0.29 0.4 1 0.25 0.8 0.1 0.97
0.975 4.875
5 20 0.3 0.4 1 0.25 0.8 0.1 0.98
0.98 4.9
5 25 0.3 0.4 1 0.25 0.8 0.1 0.98

0.98 3.43
3.5 28.5 0.3 0.4 1 0.25 0.8 0.1 0.98

VOLUME TERPASANG 27.83

Pekerjaan Tambahan
panjang tinggi lebar
Pemasangan pasangan batu diarea yang jebol
1.5 1.5 1.5 3.375

TOTAL VOLUME TERPASANG 265.3091875


TOTAL VOLUME KONTRAK 263.97

Diperiksa Oleh Dibuat Oleh,


Pengaw as Lapangan Dinas Pekerjaan Umum Kota Bandar Lampung Konsultan Supervisi CV. ABDI PRIMA JAY A

MUHADI, ST SUDJIANTO, ST ABDUL ROHIM


NIP. 19770803 200801 1 016 Inspector