Professional Documents
Culture Documents
Hospital Building (Phase II)
Hospital Building (Phase II)
CARLITO C. JOSE
Engineer II Engineer V
CHECKED BY: District Engineer
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section BONIFACIO O. SEGUIT - CESO IV
SUBMITTED BY: Director V
Regional Director
NESS S. VILLANUEVA
Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region IV - A
CAVITE SUB-DISTRICT ENGINEERING OFFICE
Tagaytay City
NOEL R. PEREY
Engineer II CARLITO C. JOSE
SUBMITTED BY: Engineer V
District Engineer
PRESCILA R. RAMOS
OIC-Chief, Maintenance Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region IV - A
CAVITE SUB-DISTRICT ENGINEERING OFFICE
Tagaytay City
NOEL R. PEREY
OIC, Chief -Maintenance Section CARLITO C. JOSE
Engineer V
District Engineer
PRESCILA R. RAMOS
Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region IV - A
CAVITE SUB-DISTRICT ENGINEERING OFFICE
Tagaytay City
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region IV - A
CAVITE SUB-DISTRICT ENGINEERING OFFICE
Tagaytay City
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section BONIFACIO O. SEGUIT - CESO IV
SUBMITTED BY: Director V
Regional Director
NESS S. VILLANUEVA
Assistant District Engineer
ANTONINO C. ERNI
Engineering Assistant NESS S. VILLANUEVA
CHECKED BY: Engineer IV
Assistant District Engineer
WENCESLAO R. ROBLEDO
Engineer II
SUBMITTED BY: APPROVED:
ESMERALDO B. BAYOT
Engineer II NESS S. VILLANUEVA
Engineer IV
CHECKED & SUBMITTED BY: Assistant District Engineer
APPROVED:
PRESCILA R. RAMOS
OIC-Chief, Maintenance Section CARLITO C. JOSE
Engineer V
District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region IV - A
CAVITE SUB-DISTRICT ENGINEERING OFFICE
Tagaytay City
CARLITO C. JOSE
PRESCILA R. RAMOS Engineer V
OIC-Chief, Maintenance Section District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region IV - A
CAVITE SUB-DISTRICT ENGINEERING OFFICE
Tagaytay City
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section BONIFACIO O. SEGUIT - CESO IV
SUBMITTED BY: Director V
Regional Director
NESS S. VILLANUEVA
Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region IV - A
CAVITE SUB-DISTRICT ENGINEERING OFFICE
Tagaytay City
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section BONIFACIO O. SEGUIT - CESO IV
SUBMITTED BY: Director V
Regional Director
NESS S. VILLANUEVA
Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region IV - A
CAVITE SUB-DISTRICT ENGINEERING OFFICE
Tagaytay City
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section BONIFACIO O. SEGUIT - CESO IV
SUBMITTED BY: Director V
Regional Director
NESS S. VILLANUEVA
Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region IV - A
CAVITE SUB-DISTRICT ENGINEERING OFFICE
Tagaytay City
APPROVED:
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section
CARLITO C. JOSE
Engineer V
District Engineer
WENCESLAO R. ROBLEDO
Engineer II CARLITO C. JOSE
Engineer V
CHECKED BY: District Engineer
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section
BONIFACIO O. SEGUIT - CESO IV
SUBMITTED BY: Director V
Regional Director
NESS S. VILLANUEVA
Assistant District Engineer
PRESCILA R. RAMOS
OIC-Chief, Maint. Section CARLITO C. JOSE
Engineer V
District Engineer
ANTONINO C. ERNI
Engineering Assistant NESS S. VILLANUEVA
CHECKED BY: Engineer IV
Assistant District Engineer
WENCESLAO R. ROBLEDO
Engineer II
SUBMITTED BY: APPROVED:
ANTONINO C. ERNI
Engineering Assistant NESS S. VILLANUEVA
CHECKED BY: Engineer IV
Assistant District Engineer
WENCESLAO R. ROBLEDO
Engineer II
SUBMITTED BY: APPROVED:
PRESCILA R. RAMOS CARLITO C. JOSE
OIC-Chief, Maintenance Section Engineer V
District Engineer
ESMERALDO B. BAYOT
Engineer II CARLITO C. JOSE
Engineer V
CHECKED BY: District Engineer
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section
BONIFACIO O. SEGUIT - CESO IV
SUBMITTED BY: Director V
Regional Director
NESS S. VILLANUEVA
Assistant District Engineer
ESMERALDO B. BAYOT
Engineer II CARLITO C. JOSE
Engineer V
CHECKED BY: District Engineer
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section
BONIFACIO O. SEGUIT - CESO IV
SUBMITTED BY: Director V
Regional Director
NESS S. VILLANUEVA
Assistant District Engineer
WENCESLAO R. ROBLEDO
Engineer II NESS S. VILLANUEVA
Assistant District Engineer
CHECKED & SUBMITTED BY:
APPROVED:
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section CARLITO C. JOSE
Engineer V
District Engineer
TOTAL 100%
ESTIMATED COST OF PROPOSED WORK
Item DESCRIPTION Unit Quantity Total Unit Adj. Item
No. Cost Cost
201 Aggregate Base Course cu.m. 267.00 269,224.11 1,008.33
302 Bituminous Tack Coat M.T. 7.60 514,954.34 67,757.15
310 Bit. Conc. Surface Course sq.m. 10,882.40 8,499,698.52 781.05
(0.05 m thk)
612 Reflectorized Thermoplas-
tic pavement Markings sq.m. 247.12 706,129.20 2,882.16
SPL I Billboard each 2.00 9,993.20 4,996.60
NOEL R. PEREY
Engineer II CARLITO C. JOSE
Engineer V
CHECKED BY: District Engineer
PRESCILA R. RAMOS
OIC, Chief -Maintenance Section
BONIFACIO O. SEGUIT - CESO IV
SUBMITTED BY: Director V
Regional Director
NESS S. VILLANUEVA
Assistant District Engineer
TOTAL 100%
ESTIMATED COST OF PROPOSED WORK
Item DESCRIPTION Unit Quantity Total
Unit Adj. Item
No. Cost Cost
A. EMERGENCY REPAIR OF STONE MASONRY & COVER CANAL AT INDANG ALFONSO ROAD
505 Stone Masonry cu.m. 47.50 150,200.65 3,168.79
SPL I Repair of Canal Cover cu.m. 7.50 101,901.75 13,586.90
B. EMERGENCY REPAIR OF DAMAGED PAVEMENT ALONG NAIC DIVERSION ROAD
SPL I Repair of Damaged Conc.
Slab sq.m. 8.82 41,411.75 4,695.21
C. EMERGENCY REPAIR OF STONE MASONRY AT SILANG BY PASS ROAD
505 Stone Masonry cu.m. 39.50 118,120.80 2,990.40
104 Embankment cu.m. 14.00 5,666.50 404.75
PRESCILA R. RAMOS
OIC-Chief, Maint. Section CARLITO C. JOSE
Engineer V
District Engineer
TOTAL 100%
ESTIMATED COST OF PROPOSED WORK
Item DESCRIPTION Unit Quantity Total Unit Adj. Item
No. Cost Cost
302 Bituminous Tack Coat M.T. 0.76 53,223.35 70,030.72
310 Bituminous Concrete Sq.m. 1,092.80 873,628.03 799.44
Surface Course
612 Reflectorized Thermo- Sq.m. 23.40 67,601.43 2,888.95
plastic Pavement Markings
SPL I Project Sign each 1.00 5,117.58 5,117.58
PRESCILA R. RAMOS
OIC-Chief, Maint. Section CARLITO C. JOSE
Engineer V
District Engineer
TOTAL 100%
ESTIMATED COST OF PROPOSED WORK
Item DESCRIPTION Unit Quantity Total Unit Adj. Item
No. Cost Cost
I Patching Potholes on Bi- sq.m. 14,572.00 498,070.96 34.18
tuminous Pavement
WENCESLAO R. ROBLEDO
Engineer II CARLITO C. JOSE
Engineer V
SUBMITTED BY: District Engineer
PRESCILA R. RAMOS
OIC-Chief, Maint. Section
TOTAL 100%
ESTIMATED COST OF PROPOSED WORK
Item DESCRIPTION Unit Quantity Total Unit Adj. Item
No. Cost Cost
505 Stone Msonry cu.m. 56.00 176,862.00 3,158.25
104 Embankment cu.m. 10.00 4,132.00 413.20
WENCESLAO R. ROBLEDO
Engineer II CARLITO C. JOSE
Engineer V
SUBMITTED BY: District Engineer
PRESCILA R. RAMOS
OIC-Chief, Maint. Section
TOTAL 100%
ESTIMATED COST OF PROPOSED WORK
Item DESCRIPTION Unit Quantity Total Unit Adj. Item
No. Cost Cost
I Sealing of cracks on lm 31,623.00 738,397.05 23.35
Concrete pavement
PRESCILA R. RAMOS
OIC-Chief, Maint. Section
DETAILED ESTIMATE
Local Infrastructure Program(LIP) - Multipurpose / Facilities, Construction of Hospital Building (Phase II),
Poblacion 17, Tagaytay Cavite
Equipment
Labor
Labor
1 ls PPE's 243,046.87
1 set PPE Signage(4'x8') @ 506.37 /set 506.37
1 set Safety First(4'x4') @ 270.87 /set 270.87
36 sets Warning Signs(2'x3') @ 123.68 /set 4,452.48
1 roll Caution Tape, 1000ft @ 800.00 /roll 800.00
9 rolls Safety Net(1/8" x 2.70m x 90m) @ 3,500.00 /roll 31,500.00
Misc (medicines) 5,920.80
286,497.39
Quantity = 1.00 ls
Equipment
1 lot 440,775.00
440,775.00
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Rental Basis
120 H-Frame 1.7m x 1.2m set @ 6.08 /hr x 99.21 hr 72,383.62
2 pcs H-Frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
186 Shoring jack, 3.8m full extension @ 4.50 /hr x 99.21 hr 83,038.77
240 Adjustable U-head Jack, 0.6m @ 0.85 /hr x 99.21 hr 20,238.84
240 Adjustable Base Jack, 0.6m @ 0.85 /hr x 99.21 hr 20,238.84
186 1-1/2 GI pipe x 6.0m @ 2.50 /hr x 99.21 hr 46,132.65
48 1-1/2 GI pipe x 3.0m @ 1.25 /hr x 99.21 hr 5,952.60
96 1-1/2 GI pipe x 4.0m @ 1.75 /hr x 99.21 hr 16,667.28
648 1-1/2 GI pipe x 1.0m @ 0.50 /hr x 99.21 hr 32,144.04
834 Tie rod x 0.60m @ 1.00 /hr x 99.21 hr 82,741.14
1674 Round wing nut @ 0.15 /hr x 99.21 hr 24,911.63
404,449.41
Labor
Installation
1 Construction Foreman @ 101.43 /hr x 664.00 hrs 67,349.52
4 Skilled Laborer @ 73.65 /hr x 664.00 hrs 195,614.40
6 Laborer @ 56.72 /hr x 664.00 hrs 225,972.48
Stripping
1 Construction Foreman @ 101.43 /hr x 371.84 hrs 37,715.73
6 Laborer @ 56.72 /hr x 371.84 hrs 126,544.59
653,196.72
Materials
1000 pcs 3/4" x 4' x 8' Phenolic Plywood @ 1,200.00 /pc 1,200,000.00
2700.00 bdft 1mm thk Rib Type Steel Decking @ 621.00 /bdft 1,676,700.00
181600.00 bdft Form lumber (4 uses) @ 45.00 /bdft 8,172,000.00
700.00 bdft 1mm thk Rib Type Steel Decking @ 60.00 /bdft 42,000.00
11,090,700.00
Equipment
Equipment
Labor
Item 1046(2)a2 - CHB Non Load Bearing (Including Reinforcing Steel), 150 mm
Equipment
Labor
1 Construction Foreman @ 101.43 /hr x 3894.91 hrs 395,060.72
2 Mason @ 73.65 /hr x 3894.91 hrs 573,720.24
3 Laborer @ 56.72 /hr x 3894.91 hrs 662,757.89
1,631,538.85
Materials
Equipment
1412.00 pcs 4.5mm Fiber Cement Ceiling Board @ 425.00 /pc 600,100.00
1800.00 pcs 12mm x 50mm x 3.6m x .80mm @ 220.00 /pc 396,000.00
Metal Carrying Channel
941.37 pcs 12mm x 38mm x 5m x .80mm @ 225.00 /pc 211,808.25
Metal Furring Channel
502.00 pcs Wall Angle (3.0m) @ 35.00 /pc 17,570.00
2610.00 pcs Preformed Wire Clip @ 6.00 /pc 15,660.00
2542.00 kg Rod Suspension Hanger @ 35.10 /kg 89,224.20
2610.00 pcs Adjustment Spring @ 6.00 /pc 15,660.00
4800.00 pcs Metal Furring Clip @ 6.00 /pc 28,800.00
35740.91 pcs Blind Revits @ 1.00 /pc 35,740.91
22.00 kg 1" Concrete Nails @ 90.00 /kg 1,980.00
75.00 pcs Drill Bits @ 75.00 /pc 5,625.00
1,418,168.36
Equipment
Equipment
Equipment
Equipment
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Minor Tools 64,531.96
64,531.96
Labor
Equipment:
Minor Tools 17,204.20
17,204.20
Labor
Equipment:
847.00 pcs 2" x 4" PVC Utility Box @ 31.00 /pcs 26,257.00
1,084.00 pcs 100mm x 100mm PVC Junction B @ 32.00 /pcs 34,688.00
Consumables 3,047.25
63,992.25
Quantity = 270.00 m
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
Equipment:
ITEM 1014(1)b1 - Prepainted Metal Sheets, Long Span, Corrugated, 0.427mm thk
Equipment:
Equipment:
Equipment:
Equipment
Equipment:
Quantity = 1.00 ls
Equipment:
Quantity = 1.00 ls
Equipment:
Quantity = 1.00 ls
Equipment:
Quantity = 1.00 ls
Equipment:
Quantity = 1.00 ls
Equipment:
Minor Tools 185.44
185.44
Labor
Quantity = 1.00 ls
Equipment:
Equipment:
Quantity = 1.00 ls
Equipment:
I. Patching Potholes
Say = P 498,200.00