Professional Documents
Culture Documents
Task Name Start Date End Date Duration Start Date in Number Form
Task Name Start Date End Date Duration Start Date in Number Form
Date in Number Form 42576.00 Use this number for the Minimum Bound of the Horizontal Axis to set the beginning of the chart.
Task Seven
Task Eight 8/5/2016 8/12/2016 7
Task Eight
Task Nine 8/6/2016 8/9/2016 3
Task Ni ne
Task Ten 8/6/2016 8/10/2016 4
Ta sk Ten
Task Eleven 8/7/2016 8/13/2016 6
Ta s k El even
Task Twelve 8/10/2016 8/16/2016 6
Task Twelve
Task Thirteen 8/14/2016 8/19/2016 5
Ta sk Thi rteen
These cells will be automatically calculated based on These cells require manual input so the calculated cells
the inputs on other cells. have data to work with.
Duration
Task Name Start Date End Date (Days)
Ta sk Si x
1.75 5.25 25%
Ta s k Seven
4.90 2.10 70%
Tas k Ei ght
0.90 5.10 15%
Tas k Ni ne
2.40 1.60 60%
Ta sk Ten
3.90 2.10 65%
Ta sk El even
1.50 4.50 25%
Ta s k Twelve
1.50 3.50 30% Ta s k Thi rte en
Key: Calculate
cells will be automatically calculated based on the These cells require manual input so the calculated
s on other cells. cells have data to work with.
of the chart.
8/29/16 9/3/16
Duration
No. Task Name Start Date End Date
(Days)
Gathering and preparing of materials for planting;
1 seeds, polystherine foam, soil, banana peel and IPB 2 8/13/2018 8/15/2018
SNAP (All)
2 Making the Hydroponic System 1 8/15/2018 8/16/2018
3 Gathering and Extraction of Banana Peel 14 8/16/2018 8/30/2018
4 Planting and Germinating the 1 8/28/2018 8/29/2018
5 Combine the solutions into the water. 1 9/1/2018 9/2/2018
6 Observe the the Set-up A and Set-up B every 3 days. 30 9/2/2018 10/2/2018
7 Measuring and recording of height. 30 9/2/2018 10/2/2018
8 Recording the vigourosity of leaves. 30 9/2/2018 10/2/2018
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Days Percent
Days Complete Start Date in Number Form 43325.00
Remaining Complete
0.00 2.00 0%
8/13/18 8/18/18 8/23/18 8/28/18 9/2/18
0.00 1.00 0% 1
0.00 14.00 0% 2
0.00 1.00 0% 3
0.00 1.00 0% 4
0.00 30.00 0% 5
6
0.00 30.00 0%
7
0.00 30.00 0%
8
0%
9
0%
10
0%
11
0%
12
0% 13
0% 14
0% 15
0% 16
0% 17
18
0%
19
0%
20
0%
21
0%
22
0%
23
0%
24
25
22
23
24
0%
25
0%
Key: Calculate
Use this number for the Minimum Bound of the Horizontal Axis to set the beginning of the chart.
cells will be automatically calculated based on the These cells require manual input so the calculated
s on other cells. cells have data to work with.
g of the chart.
10/2/18 10/7/18