PM3 South Daily Scorecard ver 1.

Friday (Dec 02, 2011) OIM : Choo TH


Trend graphs
HSE Actual
Status Actual Status Limit Actual
High profile incidents (HPI) number ● 0 BRA Flare (mmscf/d)
▲ 47
61 Forecast
Lost time injury (LTI) incidents ● 0 BRE Flare (mmscf/d) 1
HSE OI

Total recordable injury (TRI) incidents ● 0 CO2 Vent (mmscf/d) ▲ 240 243 Plan

Unintentional hydrocarbon releases (UHR) number ● 0 BRA OIW (ppm) ● 35 17 Week To Date
BRE OIW (ppm) ● 35 1

1.
HSE Highlights Spills ● 0 0 Indicators
On-plan
2.
3. Discussion

Production - PM3 South Gas Nomination 3%/0 Net Liquid 3%/0 Net Sales Gas 3%/0
mmscf/d bbl/d BRE Condensate mmscf/d CO2 % %
Target* Actual Nom Actual 25,000 350.0
Net Liquid Ydy ● 15,900 18,093 PN ● 175.0 184.9
bbl/d WTD ▲ 16,278 12,553 PV ● 95.0 96.1 20,000
300.0
286.0 290.4 287.3
40.0


282.8 281.0
285.0 281.0 250.0
Net Sales Ydy 18,093

▲ 15,000 17,025 17,106


Gas mmscf/d WTD 285.0 249.8 200.0

PM3 Gross Ydy ● 313.2 309.0 10,000


13,790
150.0
181.1
20.0
Gas mmscf/d WTD ▲ 313.2 273.9
5,000
7,787
9,882
100.0
140.2

2,412 2,572 2,673 2,738 2,661 50.0


4,186
1,175 1,510
7.5 7.0 7.3 7.4 7.6 7.7 7.8
0 0.0 0.0

Mon
Sat

Sun

Fri
Mon

Tue

Thu
Sat

Sun

Fri
Tue

Thu

Wed
Wed
*Target includes Northern condensates based on previous month CGR, assumed at bbl amount 1,408
Gross Liquid Produced Water
bbl/d BRA Export Liquid BS&W FSO Oil Received (Gross) FSO Water Received BRA, bbl/d BRA PW Design BRE, bbl/d
35,000
70,000 1,000
30,000
60,000
800
25,000
24,345 50,000 51,651 52,178
22,815 50,221
20,000 600
19,444 40,000
18,504 18,248 38,759
15,000 17,340
15,191 30,000 400
14,220
10,000 12,812
11,615 11,003 20,000
9,715 9,081 22,156
4,158 16,455 200
5,000 6,295 10,000
1,930 1,246 1,049 1,339 75 62 51 58 45
38 179 405 303 314 409 488 393 724 14
1
7,449
0 0 0
Mon
Sat

Sun

Fri
Tue

Thu
Wed

Mon
Sat

Sun

Fri
Tue

Thu
Wed
Secondary Recovery - PM3 South Gas Lift Volume 3%/0 Water Injection Volume 3%/0
mmscf/d GL Target bbl/d WI Target
Dsgn Target Actual 40
140,000
GL
mmscf/d
Ydy ▲ 20.0 39.0 33.1 35
30 32.6 33.1
120,000
31.5
WI

100,000
Ydy 122,000 90,000 80,720 25 26.2
bbls 80,000
20 80,720
20.1 72,530
60,000
15 58,588
15.5
10 40,000 45,408
38,335
5 7.5 20,000
16,182
0 0 8,961
Mon
Sat

Sun

Mon
Fri
Tue

Thu

Sat

Sun

Fri
Tue

Thu
Wed

Wed
Operations

BRE HC Recovery BRE Feed Gas & CO2% Gross Northern Field Gas & CO2%
mmscf/d Actual CO2 CO2 Target Target % mmscf/d Actual CO2 CO2 Target Target %
100.0%
700 100 500 100
95.0% 600
80 450.0 444.1 446.6 436.5
94.7% 585.2 587.1 592.6 400 420.1 80
93.8% 93.3% 93.4% 565.5 570.5
92.4% 93.0% 93.1% 500
90.0%
400 60 300 60
299.2
380.4
85.0% 300 38.0 38.0 38.0 38.0 38.0 38.0 38.0 35.0 35.0
40 200 232.2 35.0 35.0 35.0 35.0 35.0 40
296.4
42.5 41.1 38.1 38.3 38.0 38.4 38.5
200 36.8 36.1 35.1 35.4 35.2 35.7 35.7
80.0% 20 100 20
100

75.0% 0 0 0 0
Mon
Sat

Sun

Fri
Tue

Thu
Mon
Sat

Sun

Wed

Mon
Fri
Tue

Thu

Sat

Sun

Fri
Tue

Thu
Wed

Wed

Unplanned Losses
Description of Losses Est Losses
1. Following wells flowing intermittently;- BKA-5 (2.5 hrs), 50 bbls
2. BKA-8, Oil Producer quit to flow for 19.25hrs. 233 bbls
3. AFGC TC-2315 shutdown since 23rd Nov due to damaged HX-2335B suction gas cooler fan and awaiting integrity team to check integrity of the cooler. 24 MMscfd
4. 7TC-2920 Re-Injection Compressor Shutdown for 14 hrs. 12.25 MMscfd
5.
6.
7.
8.
Production & Optimisation
1. Well Test ; BKA 6L, BKC 19 & BKC 20
2. Choke up BKC 19 & BKC 20 to compensate lower feed to BRE due to BRD Reinjection down.
3. BKA-8 quit to flow at 1045hrs
4. P-5155B; BRAU WI Pump BOL at 1200 hrs
5. 7TC-2920 Re-Injection Compressor manually shutdown @ 0800 hrs and BOL at 2200 hrs after replaced both upper & bottom Fan bearing.
Required Onshore Support
Job Name Description Short Description of Support Required
1.
2.
Major Highlights
1. PSV-2325 & PSV 2326 AFGC Discharge PSV; Resetting from 5830 kpa to 5675 kpa as per office due to degraded of HX 2110 Cooler Temperature limit.
2. FN-5175; BRAU WI Scour Blower Fan unable to start due to wrong status indication registered in PLC. Further action on hold due to process on line.
3. 7TC-2920; Reinjection Comp Lube Oil Cooler Fan abnormal sound. Replaced Fan bearing and tested. Unit back on line@ 2200 hrs..
4. TC 2510 Export Comp Train B;- Continue to perform compressor & gearbox alignment by Roll Royce Reps.
5. 8C-9150B ; BRE Regen Gas Blower Isolation Valve Integrity check in preparation for Seal change out. Leaks rate 140 kpa / 30 minutes.
6. 8C-5410; Monitor BRE Instrument Air Comp motor winding temp 101 Deg C. Alarm 110 & trip SP 115 Deg C.
7. FSO lifting inventory: - Next lifting is BR 283 and lifting window is 13th - 15th Dec. Exportable dry crude inventory as 0600 hrs today is 155,716 bbls.