Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

GENERAL CONDITIONS:

The scope of works which are included in the plans,design,figures and details are parts
thereof specification to form a contract. The contractor shall in no event deviate or make changes
in the drawings or specification without the approval of the Engineer in-charge of construction.

Anything shown on the plans but no mentioned in the specification or vice-versa but is
reasonably necessary for the proper execution and completion of the project shall be furnished
without any extra cost over the contract price.

The work to be executed shall include the furnishing of all labor, materials and equipment.
All shall conform to the standard requirements of the authorities concerned. The materials shall be
of approved quality and labor shall be undertaken by skilled of the project shall be furnished
without any extra cost over the contract price.

The work to be executed shall include the furnishing of all labor, materials and equipment.
All shall conform to the standard requirements of the authorities concerned. The materials shall be
of approved quality and labor shall be undertaken by skilled personnel in order to produce the
best workmanship.

You might also like