Week 1

You might also like

Download as docx or pdf
Download as docx or pdf
You are on page 1of 4
Question 1 30 Pts What should be considered in a system conversion project to address the application-level changes between SAP ERP and SAP S/4HANA Enterprise Management? © Root cause analysis to determine the impact of transitioning from an SAP database toa nor-SAP database Change management to analyze and manage the impact of changes documented in the simplification list, © Agile programming to enable implementation of all applications in the scope items list © Performance optimization to improve performance of SAP Business Warehouse reports Question 2 30PIs Which tool can you use to download a project plan based on the SAP Activate methodology for a system conversion to SAP S/4HANA project? e Roadmap Viewer © Solution Expiorer © Power Designer © Maintenance planner Question 3 20Pts What is the preferred approach for an SAP S/AHANA conversion when all the prerequisites are fulfilled? © The three-step approach (first database, then data, and then applications) © The two-step approach @ The one-step approach © First the SAP HANA database migration and then the two-step approach Question 4 3.0Fts What are good reasons to start a conversion in a sandbox? Note: There are 3 correct answers to this question. © Tobe compliant with the project methodology @ Tocheck data quality issues and trigger mitigation in time @ Tolearn about and get experience ot a conversion GB To provide training for end users @ To optimize downtime Question 5 408 What are some of the responsibilities of a process owner during a system conversion to SAF S/4HANA? Note: There are 3 correct answers to this question. Evaluating the possibility of replacing custom code with new business innovations available in SAP S/4HANA, a Working with the user experience lead to define the appropriate strategy for their line of business from a UI point of view s Helping to prepare the business for the change a Defining all criteria forthe success of the conversion project a Making sure that simplifications introduced with SAP S/4HANA are excluded from the scope of the system conversion Question 6 3.0Pts What should you consider when recruiting a team for an SAP S/4HANA system conversion project? Note: There are 3 correct answers to this question. @ You will need to involve similar skillsets in a system conversion as in a new implementation project. @ Asystem conversion is not just a technical upgrade project. G The most important role in a system conversion is the basis developer Gi A system conversion is exclusively a technical upgrade project. @ You will need a functional team to successfully runa system conversion project Question7, 3.0 Pts When shoulda finance consultant get involved in a system conversion to SAP S/4HANA project? © From when the technical conversion starts until the end of the conversion project © Only during the testing of the Finance processes in the converted system © Only when issues in Finance have occurred during the conversion @ Froma very early stage until the end of the conversion project

You might also like