Doc No.

: STPL/SAM/ABL/1
STPL DAILY DAIRY Rev No.:
Date of rev.:
0
11-10-12

Project : Sambalpur -Bargarh Orissa/Chattisgarh Border of NH 6


Client : Ashoka Sambalpur-Bargarh Tollway Pvt. Ltd.
Engineer : Sugam Technocrates Pvt. Ltd.

Section 1: Weather Report


a. Weather Clear Cloudy Foggy Rainy

b. Temperature (0C) Min. 28.6 Max. 31.2

c. Rainfall (mm) Nil

Section 2: Details of Activities Checked at Site


Sl. Checked
R.F.I no. Chainage Activities Remarks
No. by
1. STR/12/1095 31+300 VUP wall lift -2 M-35 Asst. B.E
Sr. B.E. & Workability of concrete is more
2. STR/12/1096/A 7+200 Girder-74 Concreting
Asst. B.E. instructed to control W/C ratio.
A-2 side P-8 pile concrete
3. STR/12/1093 7+200 Asst. B.E
Mahanadi
Shuttering is not in line
A-2 RE wall Final lift M-
4. STR/12/1094 9+895 Asst. B.E instructed to rectify before
25
concreting.
Railing beam casting
5. STR/12/1096 4+993 Asst. B.E Checked & found OK.
minor bridge
77+610
T.L. & Rate of spreading checked &
6. RWS/12/1812 to Tack Coat
Sr. M.E. found OK.
77+950
77+610
DBM laying and level T.L. &
7. RWS/12/1813 to
checking Sr. M.E.
77+950

Section 3: Details of Test Conducted in Laboratory


Sl. R.F.I no. Location Test Conducted Witnessed Remarks
No. by
1. Cast 9 no. DBM Mould for Sr. M.E./
Km. 14 Lab
JMF Verification. Lab Tech.
2 Crushed aggregate Sr. M.E./
FI+EI (40mm --- 16%, 10mm---35%
gradation, FI & EI (Nawa) Lab Tech

3 Crushed aggregate
Sr. M.E./ FI+EI (40mm --- 24%, 20mm---
gradation, FI & EI
Lab Tech 18%, 10mm---33%
(Pozzolana.)
Section 4: Observations & Recommendations:
It is observed that for Borrow Area Material used for Embankment & Sub-Grade Test for soluble
1. sulphate & total sulphate has not been conducted. It is recommended that the same should be
conducted on top priority. (Please refer Clause 305.2.1.3 of MORTH Specification.
M 45 Grade concrete for Precast Girder was being batched at Uttamcon Plant at Km. 7 Mahanadi
without moisture correction for sand, as a result concrete mix was produced at a slump of 160 mm.
2.
It was advised to the Material Engg. of Uttamcon to regularly make correction for moisture content.
So that design slumped should be maintained.

Team Leader,