Tugas Peranian Terbaru-Model
Tugas Peranian Terbaru-Model
1. FASILITAS PENERIMA
Wanita
1,8 m2
Jumlah 1028,6 m2
Sirkulasi 20 % 205,72 m2
Total 1234,32 m2
2. FASILITAS PENGELOLA
15. Toilet
Wanita
Jumlah 480,6 m2
Sirkulasi 20 % 96,12 m2
Total 576,72 m2
3. RESTORAN/FOODCOURT
Sirkulasi 20 % 26 m2
Total 156 m2
Jumlah 130 m2
Sirkulasi 20 % 26 m2
Total 156 m2
5. MUSHOLAH
2. Toilet 25 m2 1 25 m2 ASS
Jumlah 145 m2
Sirkulasi 20% 29 m2
Total 174 m2
6. FASILITAS SERVICE
2. R. Trafo 20 m2 2 20 m2
3. R. Panel 12 m2 2 24 m2
5. R. AHU 20 m2 2 20 m2
6. R. Chiller 20 m2 1 20 m2
7. R. Pompa R. Pompa 1 40 m2
8. R. Mesin 50 m2 1 50 m2
11. Toilet
Wanita
Kloset 1,4 m2/unit 4 5,6 m2 NAD
Jumlah 686,2 m2
Total 823,44 m2
7. FASILITAS UTAMA
Keterangan Sumber :
SB =Studi banding
ASS = Asumsi
PALS = Official Paint Ball Asia League Series
DA = Data Arsitek
KEDEKATAN RUANG