Field Manager™ - Quicl¢Charts
Quick Charts Button
The Quick Charts button can be used to view 24 hour, 7 day, and 31 day data charts. Up to four different
items (pens) can be graphed.
To generate a quick chart for a remote unit
1. Click the Quick Charts button Ge from the Field Manager" User interface. The Select Remote
Unit window appears if you are not connected to a remote unit. Select the station to generate a chart
for and click OK. You may also double click the station. Click Cancel to abort.
[Ste ID: 00004 BI009EPR Test Staton
Site ID: 00007 - Test Staton
Site ID: O0010- My Staion
Site ID: 00061 - New Staton
Site 1D: 00147 - Commercial
Site ID: 08507 - Hatield Loosing
2. The Select Chart Type window appears. Click the appropriate button to select the type of graph to
generate.
3. The Chart window appears.
EAGLE RESEARCH
OCR ue Roce eidField Manager™ Quick Charts
sicd
Cfo MS Se
> You can Zoom and Scroll the chart. Use the left mouse button for zooming and the right mouse button
for scrolling.
i. To zoom in an area, create a window from upper left corner to lower right corner around the area.
ii, To zoom out to the original position, create a window from right to left.
ii. To scroll, hold down the right mouse button and move.
> Click the Print button to print the chart. The chart prints to the default printer.
> Click the Setup button to configure the chart, The Configure Chart window appears.
Field to Front Office Solutions™Field Manager™ Quick Charts
Date/Time Format. [rnm/de/y) rmmces
7 Include Station Name in Title
Chat Tite [Houiy Flow Data
View 30
Legend Visible
Grid Vise
Background Color [white Cs
(oe) _ coe]
> Click the Config Pen button Bro configure the pen. Note that the enable box ™ Pressure must
be checked to allow pen configuration. The Configure Pen window appears.
Ei 10,H2) Hourly Ave Pressure
PenColor [Maroon
IP Grid Visible
‘xis Poston [Left Edge a
‘Asie Scale Mode [AutoScaled a
ok Cancel
> Click the Adjust Scale up or down arrow 2 to adjust the scale ofthe chart, Note that the enable
ox | jacsuia) Must be checked to adjust the scale.
> Click the Adjust Offset up or down arrow 24 to adjust the offset of the chart, Note that the
nable box |p [esa MUst be checked to adjust the offset
assure
Field to Front Office Solutions™