Project Name: Indmax FCC Unit Including LPG Treatment Facility (LSTK – 01 Package) at IOCL, Bongaigaon Refinery,Dist.

Chirang ,
Assam, INDIA

PMC Comment Resolution Sheet

Owner : Indian Oil Corporation Limited – IOCL


PMC : ThyssenKrupp Industrial Solutions (India) Private Limited – TKIS ,
EPC Contractor : Mumbai L&T Hydrocarbon Engineering - LTHE
Document No. : 9800-101-IEX-DZ-CORD-0001-003
Rev. No. : 1
Document Title : Inspection & Test Plan For Instrumentation Cables
Date of comments : 8-Jun-18
Discipline : IEX
Status (Open
S.No. Section No. PMC Comment//Observation LTHE Response/Resolution PMC Reply
/Close)

1 Page 6 of 8 Percentage of Visual Inspection shall be 100% Noted & Incorporated NOTED CLOSED

2 Page 7 of 8 Quantity Check shall be carried out by uncoiling the drum and measuring the length Noted. Remark included in the ITP NOTED CLOSED

3 Page 8 of 8 Oil resistance test on finished cable shall be checked on one sample of each type of item Noted & Incorporated NOTED CLOSED

Mutual capacitance between any two cores and


Include Following activity with 10% Witness
4 Page 8 of 8
For IIC hazardous area cable capacitance should meet following criteria:
Capacitance between any core & screen are already part
of the acceptance test (7 & 8) with 10% Witness.
NOTED CLOSED
a) Mutual capacitance between any two cores less than 100 pf/mtr.
Acceptable values of capacitance shall be as per
b) Capacitance between any core and screen less than 100 pf/mtr.
respective approved cable datasheet.

Page 1 of 1
Project Name: Indmax FCC Unit Including
LPG Treatment Facility (LSTK – 01 Package)
at IOCL, Bongaigaon Refinery,Dist. Chirang ,
Assam, INDIA
L&T- CHIYODA LIMITED

Title: Inspection & Test Plan For Instrumentation Cables Rev. No.: 02
Doc. No.: 9800-101-IEX-DZ-CORD-0001-003 Page No: 1 of 8

OWNER : Indian Oil Corporation Limited (IOCL)


PMC : Thyssenkrupp Industrial Solutions (India) Private Limited
UNIT : 0.74 MMTPA FCC & 0.25 MMTPA LPG TREATMENTS
LTHE JOB NO . : 600244
EQUIPMENT DESCRIPTION : INSTRUMENT CABLES (CONVENTIONAL CABLES)
EQUIPMENT TAG : NA
P. R. NO. : 9800-101-INS-EC-0085
VENDOR NAME : CORDS CABLE INDUSTRIES LTD.

DOCUMENT CATEGORY DOCUMENT REVIEW STATUS 


(SUBMISSION
LTHE (BY OWNER/PMC)
PURPOSE)
 ȏͳȐ Ȃ ‫܆‬1 Approved / Reviewed

‫ ܆‬Approval ȏʹȐ ǡǡ ‫܆‬2 Approved / Reviewed with Comments as
  
 
‫ ܆‬Review 
marked
ȏ͵Ȑ 
  ǡ ‫܆‬3 Not Approved / Resubmit
‫ ܆‬Information  
 ‫܆‬4 Retain for Information/Records


 
ȏͶȐ      

 05/07/18
Date : _______/_________/_________ KLS
Name : _________________
   
Reviewed & Approved By GK / JKP 14-Jun-18 This approval does not absolve the contractor from meeting their contractual obligation of
delivering a complete ,safe and efficiently operating units/facilities meeting all requirements of
Jatin Patel the contract
   
14.06.18   



  Ȁ  
Ȁ    
   
 
  Ƭ    

     
   Ǥ


Ͳʹ ‘”’’”‘˜ƒŽ ‘•Šƒ ‘•Šƒ Šƒ    


Šƒ
Ͳͳ ‘”’’”‘˜ƒŽ ‘•Šƒ ‘•Šƒ Šƒ    
Šƒ
ͲͲ ‘”’’”‘˜ƒŽ ‘•Šƒ ‘•Šƒ Šƒ    
Šƒ
‡˜Ǥ ‡•…”‹’–‹‘ ”‡’ƒ”‡† ‡˜‹‡™‡† ’’”‘˜‡† ‡˜‹‡™‡† ’’”‘˜‡† ’’”‘˜‡†
› › › › › ƒ–‡

ALL RIGHTS RESERVED


THIS DOCUMENT IS DEVELOPED BY LTHE AND INFORMATION CONTAINED IS PROPERTY OF INDIAN OIL CORPORATION LTD. IT SHALL NOT BE USED FOR ANY PURPOSE
OTHER THAN FOR WHICH IT WAS SUPPLIED. CONFIDENTIAL – NOT TO DISCLOSE WITHOUT AUTHORIZATION
Project Name: Indmax FCC Unit Including
LPG Treatment Facility (LSTK – 01 Package)
at IOCL, Bongaigaon Refinery,Dist. Chirang ,
Assam, INDIA
L&T- CHIYODA LIMITED

Title: Inspection & Test Plan For Instrumentation Cables Rev. No.: 02
Doc. No.: 9800-101-IEX-DZ-CORD-0001-003 Page No: 2 of 8

Rev. Page Clause /


Sl. No. Brief Description / Reason of Revision
No. No. Line No.
01 00 00 00 For Approval
02 01 00 00 For Approval
03 01 00 00 COMMENTS INCORPORATED For Approval

ALL RIGHTS RESERVED


THIS DOCUMENT IS DEVELOPED BY LTHE AND INFORMATION CONTAINED IS PROPERTY OF INDIAN OIL CORPORATION LTD. IT SHALL NOT BE USED FOR ANY PURPOSE
OTHER THAN FOR WHICH IT WAS SUPPLIED. CONFIDENTIAL – NOT TO DISCLOSE WITHOUT AUTHORIZATION
Project Name: Indmax FCC Unit Including
LPG Treatment Facility (LSTK – 01 Package)
at IOCL, Bongaigaon Refinery,Dist. Chirang ,
Assam, INDIA
L&T- CHIYODA LIMITED

Title: Inspection & Test Plan For Instrumentation Cables Rev. No.: 02
Doc. No.: 9800-101-IEX-DZ-CORD-0001-003 Page No: 3 of 8

TABLE OF CONTENT

Sr. No. Description Page No.
ͳ  Ͷͺ
  
  

ALL RIGHTS RESERVED


THIS DOCUMENT IS DEVELOPED BY LTHE AND INFORMATION CONTAINED IS PROPERTY OF INDIAN OIL CORPORATION LTD. IT SHALL NOT BE USED FOR ANY PURPOSE
OTHER THAN FOR WHICH IT WAS SUPPLIED. CONFIDENTIAL – NOT TO DISCLOSE WITHOUT AUTHORIZATION
Page 4 of 8
F/MTT/06

”‘Œ‡…–ǣ ”‘Œ‡…–ǡ‘‰ƒ‹‰ƒ‘ IITP NO. 9800-101-IEX-QA-0047 Rev. 02


™‡”ǣ †‹ƒ‹Ž‘”’‘”ƒ–‹‘‹‹–‡†  ǤǣͻͺͲͲ Date- 13.06.18
ǣŠ›••‡”—’’ †—•–”‹ƒŽ‘Ž—–‹‘•ȋ Ȍ INSPECTION AND TEST PLAN Doc. No.: 9800-101-IEX-DZ-CORD-0001-003
‘–”ƒ…–‘”ǣƬ ›†”‘…ƒ”„‘‰‹‡‡”‹‰‹‹–‡† LTHE JOB NO.: 600244
ƒ—ˆƒ…–—”‡”Ǧ‘”†•ƒ„Ž‡ †—•–”‹‡•–†Ǥ Item Description: Instrumentation / Earthing Cables

TYPE / Inspection By
SL. REF. ACCEPTANCE FORMAT OF
COMPONENT CHARACTERISTICS CATEGORY METHOD OF EXTENT OF CHECK REMARKS
NO. DOCUMENTS NORMS RECORDS Vendor TPIA
CHECK

01 RAW MATERIAL
•’‡” ǣͷͺ͵ͳǦͺͶȀ’’”‘˜‡†
ƒȌ‘’‘—† ͳǤŠ›•‹…ƒŽ’”‘’‡”–‹‡•  Š›•‹…ƒŽ ƒ’Ž‡ ȀȀͲͷ  
†ƒ–ƒ•Š‡‡–•
ʹƒ‡ǡ›’‡Ƭƒ–…Š Ǧ†‘Ǧ ‹•—ƒŽ ͳͲͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

•’‡”ǦͷͲʹͻͲǦʹǦʹͻȀ
„Ȍ‘’‘—† ͳǤŠ›•‹…ƒŽ’”‘’‡”–‹‡•  Š›•‹…ƒŽ ƒ’Ž‡ ȀȀͲͷ  
’’”‘˜‡††ƒ–ƒ•Š‡‡–•
ʹƒ‡ǡ›’‡Ƭƒ–…Š Ǧ†‘Ǧ ‹•—ƒŽ ͳͲͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

•’‡” ǣͺͳ͵ͲǦͺͶȀ’’”‘˜‡†
…Ȍ‘’’‡” ͳǤŠ›•‹…ƒŽ’”‘’‡”–‹‡• Ǧ†‘Ǧ Š›•‹…ƒŽ ƒ’Ž‡Ȁƒ–…Š ȀȀͲͳ  
†ƒ–ƒ•Š‡‡–•
ʹǤŠ‡‹…ƒŽ’”‘’‡”–‹‡•ȋ‡”•—Ž’Šƒ–‡‡•–ˆ‘”–‹‡† Š‡‹…ƒŽ
Ǧ†‘Ǧ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
…‘’’‡”‘Ž›Ȍ
Ž Ȍ  Ž ‹
ƒŽ›•‹•

͵ǤŽ‡…–”‹…ƒŽ’”‘’‡”–‹‡• Ǧ†‘Ǧ Ž‡…–”‹…ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

ͶǤ‹‡•‹‘• Ǧ†‘Ǧ ‡ƒ•—”‡‡– Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

†Ȍ›’‡ȀȋŠ”‘‡ŽǦ •’‡” ǣͻ͸ǤͳȀ’’”‘˜‡†


ͳǤŽ‡…–”‹…ƒŽ’”‘’‡”–‹‡• Ǧ†‘Ǧ Š›•‹…ƒŽ ƒ’Ž‡Ȁƒ–…Š ȀȀͲͳ  
Ž—‡ŽȌ †ƒ–ƒ•Š‡‡–•
ʹǤ‹‡•‹‘• Ǧ†‘Ǧ ‡ƒ•—”‡‡– Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

‡Ȍ
ƒŽ˜ƒ‹•‡†–‡‡Ž”‘—†™‹”‡ •’‡” ǣͳͷͷͶǦͳȀ ǣ͵ͻ͹ͷȀ
ͳǤŠ›•‹…ƒŽ Ǧ†‘Ǧ Š›•‹…ƒŽ Ǧ†‘Ǧ ȀȀͲ͸  
Ȁ•–”‹’ ’’”‘˜‡††ƒ–ƒ•Š‡‡–•
ʹǤ‹‡•‹‘ Ǧ†‘Ǧ ‡ƒ•—”‡‡– Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
͵Ǥ‹ˆ‘”‹–›‘ˆ‹……‘ƒ–‹‰ Ǧ†‘Ǧ Š‡‹…ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

•’‡”ǦͷͲʹͺͺǦ͹Ȁ’’”‘˜‡†
ˆȌŽ—‹‹—›Žƒ”–ƒ’‡ ͳǤŠ‹…‡•• Ǧ†‘Ǧ ‡ƒ•—”‡‡– Ǧ†‘Ǧ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•

‰Ȍ Ȁ  •’‡”ǦǦʹͺ͸͵Ȁƒ’’”‘˜‡†


ͳǤš›‰‡ †‡š–‡•–  Š‡‹…ƒŽ ƒ’Ž‡Ȁƒ–…Š ȀȀͲͷ  
‘’‘—†• †ƒ–ƒ•Š‡‡–•
ʹǤ‡’‡”ƒ–—”‡ †‡š–‡•– Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
•’‡” ǣ͸Ͳ͹ͷͶǦͳȀƒ’’”‘˜‡†
͵Ǥ 
ƒ•‹••‹‘‡•– Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•
•’‡”ǦǦʹͺͶ͵Ȁƒ’’”‘˜‡†
ͶǤ‘‡†‡•‹–›”ƒ–‹‰ Ǧ†‘Ǧ Š‡”ƒŽ Ǧ†‘Ǧ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•

02 INPROCESS
•’‡” ǣͺͳ͵ͲǦͺͶȀ’’”‘˜‡†
ƒȌ‘†—…–‘”„—…Š‹‰ ͳǤ‘Ǥ‘ˆ•–”ƒ†•  ‘—–‹‰ ͳͲͲΨ•’‘‘Ž• ȀȀͳͶ  
†ƒ–ƒ•Š‡‡–•
ʹǤ‹œ‡‘ˆ™‹”‡ȋ‡ˆ‘”‡•–”ƒ†‹‰ȌȀ”‘•••‡…–‹ƒŽ
Ǧ†‘Ǧ ‡ƒ•—”‡‡– Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
ƒ”‡ƒ
͵Ǥ‘†—…–‘””‡•‹•–ƒ…‡ Ǧ†‘Ǧ Ž‡…–”‹…ƒŽ ƒ’Ž‡ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
Page 5 of 8

”‘Œ‡…–ǣ ”‘Œ‡…–ǡ‘‰ƒ‹‰ƒ‘ IITP NO. 9800-101-IEX-QA-0047 Rev. 02


™‡”ǣ †‹ƒ‹Ž‘”’‘”ƒ–‹‘‹‹–‡†  ǤǣͻͺͲͲ Date- 13.06.18
ǣŠ›••‡”—’’ †—•–”‹ƒŽ‘Ž—–‹‘•ȋ Ȍ INSPECTION AND TEST PLAN Doc. No.: 9800-101-IEX-DZ-CORD-0001-003
‘–”ƒ…–‘”ǣƬ ›†”‘…ƒ”„‘‰‹‡‡”‹‰‹‹–‡† LTHE JOB NO.: 600244
ƒ—ˆƒ…–—”‡”Ǧ‘”†•ƒ„Ž‡ †—•–”‹‡•–†Ǥ Item Description: Instrumentation / Earthing Cables

TYPE / Inspection By
SL. REF. ACCEPTANCE FORMAT OF
COMPONENT CHARACTERISTICS CATEGORY METHOD OF EXTENT OF CHECK REMARKS
NO. DOCUMENTS NORMS RECORDS Vendor TPIA
CHECK

ͶǤ‡ƒŽ‹‰ȋ‡ˆ‘”‡–”ƒ†‹‰Ȍˆ‘”…‘’’‡” Ǧ†‘Ǧ Š›•‹…ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

Š‘—Ž†„‡•‘‘–Šƒ†ˆ”‡‡ˆ”‘
ͷǤ ‹‹•Š Ǧ†‘Ǧ ‹•—ƒŽ ͳͲͲΨ Ǧ†‘Ǧ  
•…”ƒ–…Š‡•

„Ȍ •—Žƒ–‹‘ ͳǤ ‹‹•ŠȀ˜ƒŽ‹–›  ‹•—ƒŽ ͳͲͲΨ •’‡”Žƒ–•–ƒ†ƒ”† ȀȀͳͷ  


•’‡”ǦͷͲʹͺͺǦ͹Ȁ ǣ͸ͻͶȀ
ʹǤŠ‹…‡••Ȁ‹‡•‹‘  ‡ƒ•—”‡‡– ƒ’Ž‡Ȁ•‡––‹‰Ƭ’”‘…‡•• Ǧ†‘Ǧ  
’’”‘˜‡††ƒ–ƒ•Š‡‡–•
͵Ǥ’ƒ”‡•–  Ž‡…–”‹…ƒŽ ͳͲͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
ͶǤ‘Ž—‡”‡•‹•–‹˜‹–›  Ž‡…–”‹…ƒŽ ƒ’Ž‡Ȁ•‡––‹‰Ƭ’”‘…‡•• ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
ͷǤŠ›•‹…ƒŽ–‡•– Ǧ†‘Ǧ Š›•‹…ƒŽ ƒ’Ž‡ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

…Ȍƒ‹”Ȁ”‹ƒ†–™‹•–‹‰Ȁ‘”‡ •’‡”ǦͷͲʹͺͺǦ͹Ȁ’’”‘˜‡†
ͳǤ‘Ž‘—”•‡“—‡…‡ Ǧ†‘Ǧ ‹•—ƒŽ ƒ…Š•‡––‹‰Ȁ’”‘…‡•• ȀȀͳ͹  
Žƒ›‹‰ †ƒ–ƒ•Š‡‡–•
ʹǤƒ‹”Ȁ”‹ƒ†Ȁ‘”‡‹†‡–‹ˆ‹…ƒ–‹‘ Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
‹•—ƒŽȀ
͵ǤȀȋˆ‘”ƒ‹”Ȁ”‹ƒ†Ȍ Ǧ†‘Ǧ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
‡ƒ•—”‡–
ͶǤ ǤǤƬǤǤ Ǧ†‘Ǧ Ž‡…–”‹…ƒŽ ͳͲͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

* †Ȍ…”‡‡‹‰ȋ †‹˜‹†—ƒŽƬ
•’‡”ǦͷͲʹͺͺǦ͹Ȁ’’”‘˜‡† ȀȀͳ͹Ƭ
˜‡”ƒŽŽƒ•ƒ†™Š‡”‡ ͳǤ‘˜‡”ƒ‰‡Ȁƒ’‡˜‡”Žƒ’  ‡ƒ•—”‡‡– ƒ…Š•‡––‹‰Ȁ’”‘…‡••   * Wherever applicable
†ƒ–ƒ•Š‡‡–• ȀȀͳͻ
ƒ’’Ž‹…ƒ„Ž‡Ȍ
ʹǤ‹œ‡‘ˆ™‹”‡Ȁ•‹œ‡‘ˆ–ƒ’‡ Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

‡Ȍ ‡”Š‡ƒ–Š ͳǤ ‹‹•Š  ‹•—ƒŽ ƒ’Ž‡ •’‡”Žƒ–•–ƒ†ƒ”† ȀȀʹͳ  


•’‡” ǣͳͷͷͶǦͳȀ’’”‘˜‡†
ʹǤ‹‡•‹‘•Ȁ–Š‹…‡••‘ˆ•Š‡ƒ–Š Ǧ†‘Ǧ ‡ƒ•—”‡‡– Ǧ†‘Ǧ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•
•’‡” ǣͷͺ͵ͳȀ’’”‘˜‡†
͵ǤŠ›•‹…ƒŽ–‡•– Ǧ†‘Ǧ Š›•‹…ƒŽ Ǧ†‘Ǧ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•

ˆȌ”‘—”‹‰ ͳǤ ‹‹•Š  ‹•—ƒŽ ͳͲͲΨ •’‡”Žƒ–•–ƒ†ƒ”† ȀȀʹͲ  


•’‡” ǣͳͷͷͶǦͳȀ ǣ͵ͻ͹ͷȀ
ʹǤ‹œ‡‘ˆ™‹”‡Ȁ•–”‹’  Ǧ†‘Ǧ ƒ’Ž‡Ȁ‡––‹‰ Ǧ†‘Ǧ  
’’”‘˜‡††ƒ–ƒ•Š‡‡–•
͵Ǥ‹‰Š–‡••Ƭ
ƒ’ Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

‰Ȍ—–‡”•Š‡ƒ–Š ͳǤ ‹‹•Š Ǧ†‘Ǧ ‹•—ƒŽ ͳͲͲΨ •’‡”Žƒ–•–ƒ†ƒ”† ȀȀʹͳ  


•’‡” ǣͳͷͷͶǦͳȀ’’”‘˜‡†
ʹǤŠ‹…‡••‘ˆ•Š‡ƒ–Š  ‡ƒ•—”‡‡– ƒ’Ž‡Ȁ‡––‹‰‹’”‘…‡•• Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•
‹•—ƒŽȀ •’‡” ǣͷͺ͵ͳȀ’’”‘˜‡†
͵Ǥ˜ƒŽ‹–›ƒ†’‘”‘•‹–›  Ǧ†‘Ǧ Ǧ†‘Ǧ  
‡ƒ•—”‡‡– †ƒ–ƒ•Š‡‡–•
ͶǤ‹ƒ‡–‡”‘˜‡”•Š‡ƒ–Š Ǧ†‘Ǧ ‡ƒ•—”‡‡– Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
ͷǤ‡•–•‘•Š‡ƒ–Š Ǧ†‘Ǧ Š›•‹…ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

͸Ǥƒ”‹‰Ȁ„‘••‹‰Ȁ”‹–‹‰ Ǧ†‘Ǧ ‡ƒ•—”‡‡– ͳͲͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  


Page 6 of 8

”‘Œ‡…–ǣ ”‘Œ‡…–ǡ‘‰ƒ‹‰ƒ‘ IITP NO. 9800-101-IEX-QA-0047 Rev. 02


™‡”ǣ †‹ƒ‹Ž‘”’‘”ƒ–‹‘‹‹–‡†  ǤǣͻͺͲͲ Date- 13.06.18
ǣŠ›••‡”—’’ †—•–”‹ƒŽ‘Ž—–‹‘•ȋ Ȍ INSPECTION AND TEST PLAN Doc. No.: 9800-101-IEX-DZ-CORD-0001-003
‘–”ƒ…–‘”ǣƬ ›†”‘…ƒ”„‘‰‹‡‡”‹‰‹‹–‡† LTHE JOB NO.: 600244
ƒ—ˆƒ…–—”‡”Ǧ‘”†•ƒ„Ž‡ †—•–”‹‡•–†Ǥ Item Description: Instrumentation / Earthing Cables

TYPE / Inspection By
SL. REF. ACCEPTANCE FORMAT OF
COMPONENT CHARACTERISTICS CATEGORY METHOD OF EXTENT OF CHECK REMARKS
NO. DOCUMENTS NORMS RECORDS Vendor TPIA
CHECK

•’‡”ǣͷ͵ͲͺǦͳȀ’’”‘˜‡†
ƒȌ‘—–‹‡‡•– ͳǤ ‹‰Š‘Ž–ƒ‰‡–‡•–  Ž‡…–”‹…ƒŽ ͳͲͲΨ Ȁ ȀͲ͸  
†ƒ–ƒ•Š‡‡–•
•’‡” ǣͺͳ͵ͲǦͺͶȀǦͷͲʹͺͺǦ͹
ʹǤ‘†—…–‘””‡•‹•–ƒ…‡–‡•– Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ  
Ȁ’’”‘˜‡††ƒ–ƒ•Š‡‡–•
͵Ǥ …Ž—†‡”ƒ‹‹”‡‡•‹•–ƒ…‡‡•–ƒ†‘–‹—‹–› •’‡”ǦͷͲʹͺͺǦ͹Ȁ’’”‘˜‡†
Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ Ǧ†‘Ǧ  
–‡•– †ƒ–ƒ•Š‡‡–•

‡ƒ’Ž‡‘ˆƒ›‘‡‹–‡
•’‡” ǣͺͳ͵ͲǦͺͶȀ’’”‘˜‡†
„Ȍ›’‡‡•– ͳǤ‡ƒŽ‹‰–‡•–ˆ‘”…‘’’‡”ȋ‡ˆ‘”‡•–”ƒ†‹‰Ȍ  Š›•‹…ƒŽ ‘…‡‘Ž›‹””‡•’‡…–‹˜‡‘ˆ•‹œ‡ Ȁ ȀͲʹ  
†ƒ–ƒ•Š‡‡–•
Ƭ–›’‡Ǥ
ʹǤ‘†—…–‘””‡•‹•–ƒ…‡–‡•– Ǧ†‘Ǧ Ž‡…–”‹…ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
•’‡” ǣͳͷͷͶǦͳȀ ǣ͵ͻ͹ͷȀ
͵Ǥ‡•–ˆ‘”ƒ”‘—”™‹”‡Ȁ•–”‹’ Ǧ†‘Ǧ Š›•‹…ƒŽ Ǧ†‘Ǧ Ǧ†‘Ǧ  
’’”‘˜‡††ƒ–ƒ•Š‡‡–•
ͶǤ‡•–ˆ‘”—‹ˆ‘”‹–›‘ˆ‹……‘ƒ–‹‰ Ǧ†‘Ǧ Š‡‹…ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
•’‡”ǦͷͲʹͺͺǦ͹Ȁ ǣͳͷͷͶǦͳȀ
ͷǤ‡•–ˆ‘”–Š‹…‡••‘ˆ‹•—Žƒ–‹‘Ƭ•Š‡ƒ–Š Ǧ†‘Ǧ ‡ƒ•—”‡‡– Ǧ†‘Ǧ Ǧ†‘Ǧ  
’’”‘˜‡††ƒ–ƒ•Š‡‡–•
•’‡” ǣͷͺ͵ͳȀ’’”‘˜‡†
͸Ǥ‰‡‹‰‹ƒ‹”‘˜‡ Ǧ†‘Ǧ Š‡”ƒŽ Ǧ†‘Ǧ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•
͹Ǥ ‘–†‡ˆ‘”ƒ–‹‘ Ǧ†‘Ǧ Š‡”ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
ͺǤ ‡ƒ–•Š”‹ƒ‰‡–‡•– Ǧ†‘Ǧ Š‡”ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
ͻǤŠ‡”ƒŽ•–ƒ„‹Ž‹–› Ǧ†‘Ǧ Š‡”ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

ͳǤ‹•—ƒŽ‹•’‡…–‹‘ˆ‘”“—ƒ–‹–›ǡ‰‡‡”ƒŽ…‘ˆ‘”‹–›
…Ȍ……‡’–ƒ…‡ ™‹–Š†ƒ–ƒ•Š‡‡–•ǡ•’‡…‹ˆ‹…ƒ–‹‘•ǡƒ‡’Žƒ–‡  ‡ƒ•—”‡‡– ͳͲͲΨ •’‡”ƒ’’”‘˜‡††ƒ–ƒ•Š‡‡–• Ȁ ȀͲͶ   R2
˜‡”‹ˆ‹…ƒ–‹‘ǡ’ƒ…‹‰

ʹǤ‹‡•‹‘ƒŽŠ‡…‘ǣ
ƒȌ‘†—…–‘”…”‘•••‡…–‹‘
„Ȍ”‹ƒ”›‹•—Žƒ–‹‘–Š‹…‡••
…ȌŠ‹…‡••‘ˆƒŽ—‹‹—ƒ†’‘Ž›‡•–‡”–ƒ’‡•ˆ‘”
•…”‡‡
•’‡”ǦͷͲʹͺͺǦ͹Ȁ ǣͳͷͷͶǦͳȀ
†ȌŠ‹…‡••‘ˆ„‹†‡”Ƭ’”‘–‡…–‹‘–ƒ’‡  Ǧ†‘Ǧ ʹͲΨ Ǧ†‘Ǧ  
ǣ͸ͻͶȀ’’”‘˜‡††ƒ–ƒ•Š‡‡–•
‡Ȍ”ƒ‹™‹”‡ȋˆ‘”•…”‡‡‡†…ƒ„Ž‡•Ȍ
ˆȌ
™‹”‡•Ȁ•–”‹’ˆ‘”ƒ”‘—”
‰Ȍ ‡”ƒ†‘—–‡”•Š‡ƒ–Š
ŠȌ—†‡”ƒ”‘—”ǡ‘˜‡”ƒ”‘—”ƒ†‘˜‡”‘—–‡”
•Š‡ƒ–Š

͵Ǥ •’‡…–‹‘ˆ‘”‹‹—•’‡…‹ˆ‹‡†‘˜‡”Žƒ’ˆ‘” •’‡”ǦͷͲʹͺͺǦ͹Ȁ’’”‘˜‡†


 Ǧ†‘Ǧ ͳͲΨ Ǧ†‘Ǧ  
•…”‡‡ƒ†„‹†‡”–ƒ’‡ †ƒ–ƒ•Š‡‡–•

ͶǤ‘†—…–‘”ƒ††”ƒ‹™‹”‡”‡•‹•–ƒ…‡ƒ† •’‡” ǣͺͳ͵ͲǦͺͶȀǦͷͲʹͺͺǦ͹


 Ž‡…–”‹…ƒŽ ʹͲΨ Ǧ†‘Ǧ  
…‘–‹—‹–›–‡•– Ȁ’’”‘˜‡††ƒ–ƒ•Š‡‡–•

ͷǤŽ‘‰ƒ–‹‘‡•–‘ǣ
ƒȌ‘†—…–‘”• •’‡”ǦͷͲʹͺͺǦ͹Ȁ ǣͷͺ͵ͳǦͺͶ ‡•‹Ž‡–”‡‰–ŠƬ
 ‹•—ƒŽ ͳͲΨ Ǧ†‘Ǧ   Ž‡…‰ƒ–‹‘ƒ‰ƒ‹•–
„Ȍ •—Žƒ–‹‘ Ȁ’’”‘˜‡††ƒ–ƒ•Š‡‡–•
…ȌŠ‡ƒ–Š …‘†—…–‘”ǣ–Š‡•‡–‡•–••ŠƒŽŽ
„ † – †„ ˆ
Page 7 of 8

”‘Œ‡…–ǣ ”‘Œ‡…–ǡ‘‰ƒ‹‰ƒ‘ IITP NO. 9800-101-IEX-QA-0047 Rev. 02


™‡”ǣ †‹ƒ‹Ž‘”’‘”ƒ–‹‘‹‹–‡†  ǤǣͻͺͲͲ Date- 13.06.18
ǣŠ›••‡”—’’ †—•–”‹ƒŽ‘Ž—–‹‘•ȋ Ȍ INSPECTION AND TEST PLAN Doc. No.: 9800-101-IEX-DZ-CORD-0001-003
‘–”ƒ…–‘”ǣƬ ›†”‘…ƒ”„‘‰‹‡‡”‹‰‹‹–‡† LTHE JOB NO.: 600244
ƒ—ˆƒ…–—”‡”Ǧ‘”†•ƒ„Ž‡ †—•–”‹‡•–†Ǥ Item Description: Instrumentation / Earthing Cables

TYPE / Inspection By
SL. REF. ACCEPTANCE FORMAT OF
COMPONENT CHARACTERISTICS CATEGORY METHOD OF EXTENT OF CHECK REMARKS
NO. DOCUMENTS NORMS RECORDS Vendor TPIA
CHECK

„‡…‘†—…–‡†„‡ˆ‘”‡
͸Ǥ‡•‹Ž‡–”‡‰–Š‡•–‘ǣ •–”ƒ†‹‰‘Ž›‘…‘†—…–‘”
ƒȌ‘†—…–‘”• ƒ†–‡•–…‡”–‹ˆ‹…ƒ–‡•ŠƒŽŽ„‡
 Ǧ†‘Ǧ ͳͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
„Ȍ •—Žƒ–‹‘ ’”‘˜‹†‡†Ǥ
…ȌŠ‡ƒ–Š

•’‡”ǦͷͲʹͺͺǦ͹Ȁ’’”‘˜‡†
͹Ǥ—–—ƒŽ…ƒ’ƒ…‹–ƒ…‡„‡–™‡‡ƒ›–™‘…‘”‡•  Ž‡…–”‹…ƒŽ ͳͲΨ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•

ͺǤƒ’ƒ…‹–ƒ…‡„‡–™‡‡ƒ›…‘”‡ƒ†•…”‡‡  Ǧ†‘Ǧ ͳͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

ͻǤȀ”ƒ–‹‘„‡–™‡‡ƒ†Œƒ…‡–…‘”‡•  Ǧ†‘Ǧ ͳͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

ͳͲǤƒ‹”Ȁ–”‹ƒ†Ȁ…‘”‡‹†‡–‹ˆ‹…ƒ–‹‘  ‹•—ƒŽ ͳͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

ͳͳǤ •—Žƒ–‹‘”‡•‹•–ƒ…‡Ȁ‹Ǥǣ
ƒȌ‡–™‡‡‘†—…–‘”•
„Ȍ‡–™‡‡‘†—…–‘”•Ƭ…”‡‡•ȋˆ‘”…”‡‡‡†
 Ž‡…–”‹…ƒŽ ͳͲΨ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ
†‘ Ǧ†‘Ǧ
†‘  
…ƒ„Ž‡•Ȍ
…Ȍ‡–™‡‡…”‡‡•ȋˆ‘”‹†‹˜‹†—ƒŽŽ›•…”‡‡‡†
…ƒ„Ž‡•Ȍ

•’‡”ǣͷ͵ͲͺǦͳȀ’’”‘˜‡†
ͳʹǤ ‹‰Š˜‘Ž–ƒ‰‡–‡•–„‡–™‡‡…‘†—…–‘”•  Ž‡…–”‹…ƒŽ ʹͲΨ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•

ͳ͵Ǥ‡•–•‘ Ȁ ‹”‡‡•‹•–ƒ–ƒ„Ž‡•Ȍ

‡•ƒ’Ž‡‘ˆ‡ƒ…Š–›’‡‘ˆ •’‡”ǦǦʹͺͶ͵Ȁƒ’’”‘˜‡†
ƒȌ‘‡‹†‡š–‡•–  Š‡‹…ƒŽ Ǧ†‘Ǧ  
‘’‘—†‹””‡•’‡…–‹˜‡‘ˆ•‹œ‡ †ƒ–ƒ•Š‡‡–•

•’‡”ǦǦʹͺ͸͵Ȁƒ’’”‘˜‡†
„Ȍš›‰‡‹†‡š–‡•–  Š‡‹…ƒŽ Ǧ†‘Ǧ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•
…Ȍ‡’Ǥ‹†‡š–‡•–  Š‡‹…ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  
•’‡” ǣ͸Ͳ͹ͷͶǦͳȀƒ’’”‘˜‡†
†Ȍ Ž‹„‡”ƒ–‹‘–‡•–  Š‡‹…ƒŽ Ǧ†‘Ǧ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•
•’‡” ǣ͸Ͳ͵͵ʹǦͳȀƒ’’”‘˜‡†
‡Ȍ Žƒ‡‡–ƒ”†ƒ…›–‡•–‘ˆ‹‹•Š‡†…ƒ„Ž‡  Š‡‹…ƒŽ Ǧ†‘Ǧ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•

ͳͶǤ ‹”‡”‡•‹•–ƒ…‡Ȁ•—”˜‹˜ƒŽ–‡•–ȋ•ƒ’’Ž‹…ƒ„Ž‡ˆ‘” •’‡”͸͵ͺ͹Ȁ Ǧ͸Ͳ͵͵ͳǦʹͳȀ


 Š‡”ƒŽ Ǧ†‘Ǧ Ǧ†‘Ǧ  
ˆ‹”‡”‡•‹•–ƒ–Ȁ•—”˜‹˜ƒŽ…ƒ„Ž‡Ȍ ƒ’’”‘˜‡††ƒ–ƒ•Š‡‡–•

ͳͷ‘‹•‡”‡Œ‡…–‹‘”ƒ–‹‘–‡•–  Ž‡…–”‹…ƒŽ ͳͲΨ •’‡”’Žƒ–•–ƒ†ƒ”† Ǧ†‘Ǧ   ‘–Ǧ’’Ž‹…ƒ„Ž‡ˆ‘”Ȁ…ƒ„Ž‡

ͳ͸ǤŠ‡”…ƒŽ‡ˆ…ƒŽ‹„‡”ƒ–‹‘ˆ‘”–Š‡”‘…‘—’Ž‡ •’‡” ǣͻ͸ǤͳȀƒ’’”‘˜‡†


 Ž‡…–”‹…ƒŽ ʹͲΨ Ǧ†‘Ǧ  
…ƒ„Ž‡•‘Ž› †ƒ–ƒ•Š‡‡–•

‡ƒ’Ž‡‘ˆƒ›‘‡‹–‡ ”‡•‡…‡‘ˆŽ‡ƒ†•ŠƒŽŽ„‡…‘ˆ‹”‡†
ͳ͹Ǥ‘†‡–Ƭ–‡”‹–‡”‡’—Ž•‹˜‡’”‘’‡”–›–‡•–  Š‡‹…ƒŽ Ǧ†‘Ǧ  
‹””‡•’‡…–‹˜‡‘ˆ•‹œ‡Ƭ–›’‡ ȋŽƒ…’”ƒ…‹’‹–ƒ–‡Ȍ

Š‹••ŠƒŽŽ„‡…ƒ””‹‡†‘—–„›
ͳͺǤ—ƒ–‹–›…Š‡…  ‹•—ƒŽ ͳͲΨ •’‡”ƒ’’”‘˜‡††”—•…Š‡†—Ž‡ Ǧ†‘Ǧ   —…‘‹Ž‹‰–Š‡†”—ƒ† R2
‡ƒ•—”‹‰–Š‡Ž‡‰–Š

•’‡”ǣͷ͵ͲͺǦͳȀ’’”‘˜‡†
ͳͻǤ‹‡Ž‡…–”‹…•–”‡‰–ŠȀ –‡•–  Ž‡…–”‹…ƒŽ ͳͲΨ Ǧ†‘Ǧ  
†ƒ–ƒ•Š‡‡–•
Page 8 of 8

”‘Œ‡…–ǣ ”‘Œ‡…–ǡ‘‰ƒ‹‰ƒ‘ IITP NO. 9800-101-IEX-QA-0047 Rev. 02


™‡”ǣ †‹ƒ‹Ž‘”’‘”ƒ–‹‘‹‹–‡†  ǤǣͻͺͲͲ Date- 13.06.18
ǣŠ›••‡”—’’ †—•–”‹ƒŽ‘Ž—–‹‘•ȋ Ȍ INSPECTION AND TEST PLAN Doc. No.: 9800-101-IEX-DZ-CORD-0001-003
‘–”ƒ…–‘”ǣƬ ›†”‘…ƒ”„‘‰‹‡‡”‹‰‹‹–‡† LTHE JOB NO.: 600244
ƒ—ˆƒ…–—”‡”Ǧ‘”†•ƒ„Ž‡ †—•–”‹‡•–†Ǥ Item Description: Instrumentation / Earthing Cables

TYPE / Inspection By
SL. REF. ACCEPTANCE FORMAT OF
COMPONENT CHARACTERISTICS CATEGORY METHOD OF EXTENT OF CHECK REMARKS
NO. DOCUMENTS NORMS RECORDS Vendor TPIA
CHECK

•’‡”ǦͷͲʹͻͲǦʹǦʹͻȀ
ʹͲǤŠ”‹ƒ‰‡‘ˆ‹•—Žƒ–‹‘  ‹•—ƒŽ ͳͲΨ Ǧ†‘Ǧ  
’’”‘˜‡††ƒ–ƒ•Š‡‡–•

‡ƒ’Ž‡‘ˆ‡ƒ…Š–›’‡‘ˆ •’‡” Ǧ͹͵Ǧͷ͵ʹȀ’’”‘˜‡†


ʹͳǤ‹Ž”‡•‹•–ƒ…‡–‡•–‘ˆ‹‹•Š‡†…ƒ„Ž‡•  Ǧ†‘Ǧ Ǧ†‘Ǧ   R2
‹–‡ȋ‹””‡•’‡…–‹˜‡‘ˆ•‹œ‡Ȍ 

͓‡•–…‡”–‹ˆ‹…ƒ–‡‘ˆ•‹‹Žƒ”
…‘’‘—†…‘†—…–‡†‘–
͓•’‡”ͳͷͺͳ ͳʹͲͲȀ
ʹʹǤ”‡•‹•–ƒ…‡‘ˆ‹‹•Š‡†…ƒ„Ž‡• ǦǦǦ ǦǦǦǦ ǦǦǦǦ ǦǦǦ  ‘”‡–Šƒͳ›‡ƒ”ˆ”‘
’’”‘˜‡†
•–ƒ†ƒ”†Žƒ„•ŠƒŽŽ„‡
’”‘˜‹†‡†

04 Packing in Drums ͳǤ ‹‹•Š  ‹•—ƒŽ ͳͲͲΨ •’‡”’Žƒ–•–ƒ†ƒ”† Ȁ ȀͲͺ  


ʹǤƒ”‹‰‘†”—• Ǧ†‘Ǧ ‹•—ƒŽ Ǧ†‘Ǧ ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ†‘ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ Ǧ†‘Ǧ  

05 IRN ǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦǦ ȀȀ Ǧ†‘Ǧ

Note : Only applicable test shall be conducted

Ǧ   Ǧ 


 Ǧ  Ǧ  
Ǧ  Ǧ 
 Ǧ  
     Ǧ   


You might also like