The document is an email from M S RAMESH of Doosan Power Systems India Ltd. to Rakesh Mohan of the same company, cc'ing other parties. It encloses a drawing for a coal burner with references to the vendor drawing number, NTPC drawing number, revision number, drawing title, approval category, and release date. The email notes that the approval category is Category I.
The document is an email from M S RAMESH of Doosan Power Systems India Ltd. to Rakesh Mohan of the same company, cc'ing other parties. It encloses a drawing for a coal burner with references to the vendor drawing number, NTPC drawing number, revision number, drawing title, approval category, and release date. The email notes that the approval category is Category I.
The document is an email from M S RAMESH of Doosan Power Systems India Ltd. to Rakesh Mohan of the same company, cc'ing other parties. It encloses a drawing for a coal burner with references to the vendor drawing number, NTPC drawing number, revision number, drawing title, approval category, and release date. The email notes that the approval category is Category I.
GM(PE-TF) INDIA LTD Mr. Rakesh Mohan(GM-Engg Management), 16 th Floor,DLF Square,Jacaranda Marg,Gurgaon,Haryana- 122002 CC: obra.em@doosan.com se.obra660@uprvunl.org obrac.14a22@in.dclgroup.co m SUBJECT : UPRVUN, EPC QA PKG Please find enclosed following drawings/documents for necessary action at your end as indicated in purpose code.
VENDOR DRG NO: DP16004-QA00-P0ZEN-040023
NTPC DRG NO: 9878-DP16004-QA00-P0ZEN-040023 REVISION NO: 01 DRG TITLE: MQP FOR COAL BURNER APP CATEGORY: I RELEASE DATE: 04-06-18