Front and Engineering Design Re-Route: Jl. Minyak/Yos Sudarso
Front and Engineering Design Re-Route: Jl. Minyak/Yos Sudarso
Front and Engineering Design Re-Route: Jl. Minyak/Yos Sudarso
CONTRACTOR COMPANY
APPROVAL APPROVAL
2 X 35.
3 X 36.
4 X 37.
5 X 38.
6 X 39.
7 X 40.
8 X 41.
9 X 42.
10 43.
11 44.
12 45.
13 46.
14 47.
15 48.
16 49.
17 50.
18 51.
19 52.
20 53.
21 54.
22 55.
23 56.
24 57.
25 58.
26 59.
27 60.
28 61.
29 62.
30 63.
31 64.
32 65.
33 66.
Doc No. PMD-04-PWK-1-002-P
PT. BAYU AJI MANDIRI Page 3 of 6
Revision 0
DOCUMENT IDENTIFICATION PROCEDURE Date 25/09/2010
TABLE OF CONTENTS
1. GENERAL
All technical documents to be issued for the Potential Landslide Repair Campaign
2010-2011 the identification system described here in.
3. CODES
3.3 Entity
RDMP : Project Division
PWK : Pipeline Works
PIT : Pipeline Integrity
Each technical document shall be recorded with a sequential number starting from
001within register resulting of Field / Discipline / Entity / Area codes combination.
PRC - Procedure
PLN - Plan
REP - Reporting
DRW - Drawing
MTO - Take Over
Doc No. PMD-04-PWK-1-002-P
PT. BAYU AJI MANDIRI Page 6 of 6
Revision 0
DOCUMENT IDENTIFICATION PROCEDURE Date 25/09/2010
4. REVISION INDEX
Each document shall be issued with numerical index and shall be taken
chronologically as 0 for first issue, then 1,2,3,etc…. in case of up dating of
COMPANY’s document, CONTRACTOR shall continue the revision chronological
numbering sequence started by COMPANY.
Engineering documents shall be issued with status index clearly indicated in the
description column of title blocks as follow :