Method Statement For Rebar Installation
Method Statement For Rebar Installation
No
METHOD
STATEMENT FOR Doc. No. : QC/031/LGR/03/MS/003
REBAR
INSTALLATION Date BY CHECK APPRV
20-10-2017 RICKY AGUS ZAIFFUL
INTERNAL
Rev. No Date Description
0 20-10-2017 ISSUE FOR APRROVAL
WRK – VE Page 2 of 6
Job. No
METHOD
STATEMENT FOR Doc. No. : QC/031/LGR/03/MS/003
REBAR
INSTALLATION Date BY CHECK APPRV
20-10-2017 RICKY AGUS ZAIFFUL
TABLE OF CONTENTS
1. INTRODUCTION
3. PROCEDURE
3.1 Preparation
3.2 Implementation
4. SHE ASPECT
4.1 Manpower
4.2 Tools
WRK – VE Page 3 of 6
Job. No
METHOD
STATEMENT FOR Doc. No. : QC/031/LGR/03/MS/003
REBAR
INSTALLATION Date BY CHECK APPRV
20-10-2017 RICKY AGUS ZAIFFUL
1. INTRODUCTION
The procedure cover the installation method of reinforcement bar for pile cap, beams,
columns, pedestals, slabs and other concrete structure.
3. PROCEDURE
3.1 Preparation :
a) Bar bending list describing diameter, length and number of each structure shall be
prepared for the employer’s approval.
b) Deformed and plain bars from manufacture shall be cold cut to the length and
bent to the geometry as per approved drawing in the rebar work shop established
in the site.
c) Prior to delivering at site all bundles shall be check by the site bending supervisor
and site engineering.
d) Cut and bent rebar sent to siteshall be stored clear of ground and protected from
mud
e) Upon delivering the material shall be store near bar bending workshop.
f) Mark the bottom bars position on each corner of structure. The mark shall be set
out from the approved benchmarks.
3.2 Implementation
WRK – VE Page 4 of 6
Job. No
METHOD
STATEMENT FOR Doc. No. : QC/031/LGR/03/MS/003
REBAR
INSTALLATION Date BY CHECK APPRV
20-10-2017 RICKY AGUS ZAIFFUL
4. SHE ASPECT :
Manpower must be use complete PPE (hand glove, safety shoes, helmet)
As per requirement.
4.2 Tools
a) Hammer
b) Bar Cutter
c) Banding wire
d) Measurement tape
e) Theodolite
WRK – VE Page 5 of 6