1.1 Introduction of Variation Oder / Changes Order
1.1 Introduction of Variation Oder / Changes Order
0 INTRODUCTION
It is common to use the terms changes and changes order interchangeably on many project.
This is unfortunated in that a comtempled changes is quiet differents from a changes that has
been specifically ordered by the owner.
Construction volume consists primarily of new construction with the remaining portions
beings devoted either to maintenance and repair or renovation and remodeling.
changes increase the cost construction others may actually results reductions. This will
depend on nature of the changes being proposed. The owner may very well decide to reduce
the scope of a project order to realized some saving, especially if the other changes have
resulted in significant.
The variation order of time project usually impact to cost and effects to time or during to
complete construction project. If the critical activity are impacted by the changes, the project
during might very well be increased.
1.5 TYPES OF CHANGE ORDERS/ VARIATION ORDERS
The owner ,either because of special conditions or change in his requirements, elects to
change the scope of the contract.
the change order process covers changes in materials such as paint quality, roofing materials,
or even major items such as structural material. Usually, these changes are for the
convenience of the contractor, and may result in a credit to the owner.
The contractor may encounter a change in conditions due strikes, weather, or subsurfaces
conditions not previously determined.
Particularly in contracts where several contractors are working on the same site, each with a
prime contract to the owner and therefore no cross-contractual commitments the individual
contractors may through their interpretation of the limitation of their contract, and certain
work may go uncovered.