Construction Of 66 KV Transmission Line

For SMGP Project


Inspection for Tower 14
(Conditions of Foundation)
Pictures/Evidances :
Foundation A
Construction Of 66 KV Transmission Line
For SMGP Project
Inspection for Tower 14
(Conditions of Foundation)
Pictures/Evidances :
Foundation B
Construction Of 66 KV Transmission Line
For SMGP Project
Inspection for Tower 14
(Conditions of Foundation)
Pictures/Evidances :
Foundation C
Construction Of 66 KV Transmission Line
For SMGP Project
Inspection for Tower 14
(Conditions of Foundation)
Pictures/Evidances :
Foundation D

Transversal
Construction Of 66 KV Transmission Line
For SMGP Project
Inspection for Tower 14
(Condition of Structure Steel)
Pictures/Evidances :
Foundation A
Construction Of 66 KV Transmission Line
For SMGP Project
Inspection for Tower 14
(Condition of Structure Steel)
Pictures/Evidances :
Foundation B
Construction Of 66 KV Transmission Line
For SMGP Project
Inspection for Tower 14
(Condition of Structure Steel)
Pictures/Evidances :
Foundation C
Construction Of 66 KV Transmission
Line For SMGP Project
Inspection for Tower 14
(Condition of Structure Steel)
Pictures/Evidances :
Foundation D

Transversal
Construction Of 66 KV Transmission
Line For SMGP Project
Inspection for Tower 14
(Condition of Structure Steel)
Pictures/Evidances :
Construction Of 66 KV Transmission
Line For SMGP Project
Inspection for Tower 14
(Condition of Structure Steel)
Pictures/Evidances :
Doc. No : SPC-QAQC/_____ - QI - S.0.01
Date :
SORIK MARAPI GEOTHERMAL February 19, 2018
PROJECT
Page
Transmission Line
1 of 16

Subject : Verticality Survey Report


Project : 66kV Transmission Line Project Type Tower : DD2 + 3
Tower 14 The type of measuring instrument used
Ref. Drawing : INSM-66TL-014-014-0 : Digital Theodolite S/N No : 139993

SKETCH

Verticality

Transversal (A-D) 0⁰ Longitudinal (B-C) 90⁰


Section Tilted to (mm) Tilted to (mm)
I - 0 - 0
II Right 10 Right 10

Height (H) > 30 m

90⁰

0⁰

REMARKS : The verticality of tower of different height shall be within the provisions of IS:12843 : 1989 , H/1000 or +/-20 mm (whicever is
less) and H/1500 or +/-25 mm (whicever is less) for towers up to and including 30M height and over 30M height respectively

Prepare By Witnessed By Acknowledged By Checked or Reviewed By

Survey SPC QAQC - SPC QAQC - HDEC SMGP


Construction Of 66 KV Transmission Line
For SMGP Project
Inspection for Tower 14
(Verticallity Survey Report)
Pictures/Evidances :
Construction Of 66 KV Transmission Line
For SMGP Project
Inspection for Tower 14
(Verticallity Survey Report)
Pictures/Evidances :

Transversal

Longitudinal