hassan Technical, goal oriented, hard working professional with almost 16+
years of experience in construction firms that demand strong
organizational and interpersonal skills. Ability to control the site as per
requirements for growth and success of the organization.
Job of Responsibilities
• Coordination with MEP • Dealing with supplier
• Fully manage store material • Decision Maker
• Conflict resolve • Visit with consultant and client
• Achieving the site schedule • Efficient Communicator
• Follows the drawings • Self-directed
E-mail
Sufian.redco@gmail.com Career Snap Shot
Contact 2016 to date Construction Manager in AMS Engineers & Contractors Pak
Mobile: +92-3486267615 2008-2015 Project Engineer in Redco International WLL Qatar
2005-2008 Site Engineer in Habib Rafiq pvt .Ltd pak
Present Address 2003-2005 Senior Supervisor in M/S Capital Builders Pvt Ltd pak
Hafizabad Pakistan 2000-2003 Supervisor in M/S Recent Construction Pvt Ltd Pak
Qatar driving license
Personal Data Educational Attainments
D.O.B. : 22nd April 1980
Sex : Male Educational Qualifications
Nationality : Pakistani
Status : Married 2000 Diploma of associate Engineering(civil) from Rawalpindi
Polytechnic institute Rawalpindi.
Passport Details
Passport No : AD5590962 1997 Secondary School Examination, Board of Intermediate and
Secondary Education.
Languages Known
English (Read, Write & Interests
Speak),
Urdu (Read, Write & Book readings , Computers and cricket
Speak).
Computer Skills Achievement
Acconex,MS Office Word,
Excel, PowerPoint, Appreciation Certificate from KEO Consultant for Excellent
Internet Explorer, MS Contribution in HSE Department.
Windows and Internet
Surfer.
Autocad ,
Professional Experience
Working since March 2016 to date as construction manager at various project in Gulberg
city Islamabad (Gulberg Trade Centre, Sophia Tower,Ayesha Masjid )
Responsibilities:
Review, maintain, update and amend safe systems of work to ensure it is safe and
without risk to health, and the changes are recorded in Project Construction Phase.
Ensure high standard of quality on the finishing works to meet the specification
requirements of the clients.
Plan, organize, and direct activities concerned with the construction and
maintenance of structures, facilities, and systems.
Supervise subcontractors and coordinate between suppliers and vendors.
Responsible for work division to complete the project within time and with quality
Using Techniques & Motivating Manpower to reduce the waste & increase cost
efficiency.
Ensure site staff complies with all company policies and procedures.
Take actions to deal with the results of delays, bad weather, or emergencies at
construction site.
Communicate with rest of site team including Management, Site staff, and
contractors to ensure full understanding of information.
Ensure daily diaries and allocation sheets are up to date.
Ensures all changes to specifications, work scope and drawings are documented.
Define clear roles & responsibilities and deliverable requirements in terms of both scope
and schedule to all the team members.
Ensure quality construction standards and the use of proper construction techniques.
• Worked since January 2008 to Nov 2015 at various projects such as Building Work, Multi
Story Structures, all kind of finishing works.
3- Project Name : Doha North Sewerage Treatment & Associated Work PS-7 and Pumping main
Consultant : Stanley consultant Inc.
Designation : Site Engineer
Job of Responsibilities:.
Responsibilities in production
• Preparation of mold before casting any element checking the measurement as per
drawing.
• Supervision as well as coordination activities of workers and pre inspection of metal
forms for molding, reinforced concrete slabs and beams, and also pouring finishing
of concrete.
• Layout plus marks measurements for assembly of new forms on prepares molding
floor.
• Inspection of concrete while pouring and after finishing.
• Demolding the panel with hydraulics’ jack’s platforms.
• After demolding shifting the panel to stacking yard with crawler Crain.
• Grind and clean beds or molds as the products is removed.
• Direct workers engaged in bolting or clumping together of form and additionally
tightens bolt and attain prescribed tension on wire and cable reinforcing member
using wrench equipped with torque gauge.
• Finishes concrete to impact uniform texture, using trowel,floats, and other hand
tools of work aids release tension on reinforce on reinforcing member during drying
as well as curing process, using wrench, to impact slight are increase strength of
concrete.
Company name M/S Habib Rafiqpvt. Ltd
Project Infrastructure development of Bella vista
phase1, Lake City (housing project) Lahore.
Position site engineer
Period August, 2006 to 2008
Client Lake City Holdings Pvt. Ltd.
Scope of Work.
• Public Buildings and Services, Earthwork, Storm Water drainage, Precast manhole complete,
Retaining wall, O/H water tanks, U/G water tanks, Tube wells
Supply & installation of street light poles Complete as per design, supply and installation of
underground electrification works.
Supply and laying of underground electrical cables 120mm2 (3-Core, 4- Core) in trenches.
Supply and installation of service boxes
Company name M/S Habib Rafiqpvt.Ltd
Project Bahria express way & garden city
Position Asst. Engineer
Period October, 2005 to July, 2006
Client Bahria town
Consultant tak
Responsibilities:
Scope or work:
Structure: Columns, Beams, Slabs,
Finishing work, Bricks work Plaster, Ceiling, painting ,tile and granite flooring, doors, Windows stone
cladding, Aluminum glass cladding,