ETAP

Project: Page: 1
12.6.0H
Location: Date: 07-10-2018
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: oke Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus2 0.64 18.99 19.00

T2 2W XFMR Bus3 Bus4 1039.17 3211.04 3375.00

Cable1 Cable Bus2 Bus3 87.24 46.83 99.01