FIELD ACTUAL (DAILY ACTIVITY) MAINTENANCE TEAM

PLTA SEMANGKA 2 X 28.3 MW

Location : Tanggamus Day / Date : Wenesday / April 18, 2018


Weather : Cloudy Inspector Name : Maintenance Team

1 Health & Safety


- Zero Accident

2 Environmment

3 Man Power & Work Duration


Yesterday Present : Wenesday / April 18, 2018
Total Worker Person Total Worker Person
Total Worked Time Hours Total Worked Time Hours

Total Worker Person Person Total Worked Time Duration Person

4 Actually Man Power Activites - Area


Total Worker 15 Person Actually Total Worker 15 Person
Total Worked Time 14 Hours Actually Total Worked Time 14 Hours

5 Field Activities
No Summary Activities
1 Yesterday Field Activieties %
2 Present Filed Activites %

5 Activities
5.1. Office

5.2. Monitoring and inspection Site Power House


5.2.1 Commisioning test Generator Unit#1. Open Close Bypass Valve from Local.
5.2.2 Test Running Electrical Fire pump for certification
5.2.3 Pulling Cable from CVT to Line protection panel at control room
5.2.4 Test running Diesel Generator Power House 500kVA

5.3. Penstock,Intake,sand trap & Head tank

5.4. Switchyard

5.5. Facility Building

Note :
1) Differential pressure for MIV setting still not yet done
2)
3)
4)
5)
FIELD ACTUAL (DAILY ACTIVITY) MAINTENANCE TEAM
PLTA SEMANGKA 2 X 28.3 MW

Location : Tanggamus Day / Date : Wenesday / April 18, 2018


Weather : Cloudy Inspector Name : Maintenance Team

PHOTOS FIELD ACVITIES (DAILY ACTIVITY)

Inspector Name : Maintenance Team


Day / Date : Wenesday / April 18, 2018

5.2.1
FIELD ACTUAL (DAILY ACTIVITY) MAINTENANCE TEAM
PLTA SEMANGKA 2 X 28.3 MW

Location : Tanggamus Day / Date : Wenesday / April 18, 2018


Weather : Cloudy Inspector Name : Maintenance Team

PHOTOS FIELD ACVITIES (DAILY ACTIVITY)

Inspector Name : Maintenance Team


Day / Date : Wenesday / April 18, 2018

5.2.2

5.2.3