l2B " Using the BOP configuration illustrated in figure given below answer the

following six questions by ticking the IIES or NO box.


(Questions are based on whether the operations can be physically performed and
do not represent the field practice or operating procedure ofuny company)

5J)
!)
h

I. with the drill pipe in hole, is it possibre to shut the well in under pressure and
repair the sideoutletsjfile drilling spool.
No.

2. With no drill pipe in the hole, is it possible to shut the welt in under pressure &
repair the drilling spool?
a. Yes. .,b-- No.

-)- Is it possible to shut well rvith drill pipe in hole & circulate through the drill string?
a. No. Yes.
"h{
4. With the drill pipe in the hole, and the welt shut in under pressure with the annular
preventer, is it possible to circulate through the kill line and choke line?
a. No. tba Yes.

5 with no drill pipe in hole & rvell shut in under pressure, can pipe rams be changed?
a. Yes. . vb: No.

6. With the well shut in on 5 inch pipe rams under pressure, can the manual valve on
the choke line be replaced?
a. No. ,-b:
Yes.

i",03.