Materials and Labor Quantity Amount Total Cost

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Materials and Labor Quantity Amount Total Cost

Tempered Safety Glass 12 pcs.


(1 ft ×1.5 ft)

Door Handle 2pcs.

Rim Lock 2pcs. 1,149.75 2,299.5

Tubular Knob 4 sets 369.75 1,479.00

Square Hinge with SS 15 sets 329.75 4946.25


Screws

Paint (16 L) 2 pails 2,040.00 4,080.00

Paint brush 4 pcs. 50.00 200.00

Anti-termites solution

Total Materials

Labor 7,000.00

Total Materials and Labor

2.4 Budget or Cost Analysis

The following tables show the approximate amount of money and time needed to carry out the
proposed reconstruction.