The document lists 24 remaining construction tasks along a highway stretch from chainage 66+000 to 66+688, including work like paver block installation, railing work, drain work, and pavement quality concrete (PQC) laying. The tasks are provided with descriptions, locations, and estimated lengths to complete. Remarks at the end note that drain cleaning work also remains to be finished.
The document lists 24 remaining construction tasks along a highway stretch from chainage 66+000 to 66+688, including work like paver block installation, railing work, drain work, and pavement quality concrete (PQC) laying. The tasks are provided with descriptions, locations, and estimated lengths to complete. Remarks at the end note that drain cleaning work also remains to be finished.
The document lists 24 remaining construction tasks along a highway stretch from chainage 66+000 to 66+688, including work like paver block installation, railing work, drain work, and pavement quality concrete (PQC) laying. The tasks are provided with descriptions, locations, and estimated lengths to complete. Remarks at the end note that drain cleaning work also remains to be finished.