Manpower Details For O&M of Power Plant
Manpower Details For O&M of Power Plant
Note: 1. Manpower requirement has been forcast considering the full fledged running of unit.
2. During initial commossioning activity for first 3 months 15 nos. manpower required, and for next 3 months 25 manpowers re
CTRICAL AMC MANPOWER DETAILS
Manpower Requirement
During Next 3 Months
0 0
1 0
1 0
1 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 0
1 0
0 0
0 0
2 0
BOP AREA: Daily Defect attanding, Routine preventive, predictive and corrective maintenance of
BOP area equipment, parameter monitoring of BOP area switchgear/PMCC/MCC. LCP, AC/DC Motor,
etc...
Daily parameter monitoring and schedule maint of battery system in BTG, switchyard and BOP area.
Attanding daily lighting defects in plant area. Routine maintenace of lamp fixtures, Lighting panels.
Attanding daily lighting defects in plant area. Scheduled maintenace of crane electrical equipments.
Routine Maint. Of motors, lubrication of motor, bearing replacement as & when required, cooling
fan cleaning, motor fins cleaning, bearing housing cleaning in journal bearing motors